Resource Materials for the Part 201 and Part 213 Programs

Contact: Sara Pearson 517-284-5138 Or Patty Brandt 517-284-5071

The DEQ Remediation and Redevelopment Division is currently in the process of publishing technical resource documents that may be used by parties seeking reference materials when investigating and remediating environmental contamination.   This web page provides links to the technical resource materials documents published by the DEQ. 

 As other operational memoranda technical topics are replaced by resource documents, the links will be provided for the new technical materials and the links for the operational memoranda will be removed. 

 Select operational memoranda technical topics may also be formatted as a Remediation and Redevelopment Division Policy and Procedure, as appropriate.  At this time, one document, Leaking Underground Storage Tank (LUST) Site Classification System, has been published as a policy and procedure.  This document replaces Operational Memorandum No. 3, Part 213 Site Classification.  The link is provided below.

 The technical information provided in the documents is applicable to the Parts 201 and 213 programs. 

Note that RRD Operational Memo 2 " Sampling and Analysis Guidance  " also covers the Part 211, Underground Storage Tank Program, as far as site assessment sampling and analysis. 


 For additional information please contact the RRD district office responsible for your site. 


Remediation and Redevelopment Division Resource Materials

Publication Date

Vapor Intrusion Guidance Document

May 2013

Groundwater Modeling

February 2014

Non-Aqueous Phase Liquid (NAPL) Characterization, Remediation, and Management for Petroleum Releases

June 2014


Remediation and Redevelopment Division Policy and Procedures

Publication Date

Leaking Underground Storage Tank (LUST) Site Classification System

November 8, 2013



Remediation Redevelopment Division Operational Memoranda



Last Updated 


RRD - 1, Part 201Generic Cleanup Criteria/Part 213 Risk Based Cleanup Levels 



The cleanup criteria published under the Operational Memorandum 1 (Attachment 1 and Attachment 2), have been replaced by the Cleanup Criteria published on December 31, 2013.



          Attachment 3:  Technical Support Document - Drinking Water Criteria 



          Attachment 4: Technical Support Document - Groundwater Contact Criteria 



         Attachment 6:  Technical Support Document - Soil Direct Contact Criteria 



         Attachment 7:  Technical Support Document - Soil Inhalation Criteria 



         Attachment 8:  Technical Support Document Csat  



         Attachment 9:  Technical Support Document - Groundwater Protection Criteria 



RRD - 2:  Sampling and Analysis Guidance 



         Attachment 1:  Target Detection Limits and Designated Analytical Methods 



         Attachment 2:  Soil Leaching Methods 



         Attachment 3:  Indoor Air Designated Methods and Target Detection Levels 



         Attachment 4:  Sample Preservation, Sample Handling, and Holding Time Specifications 



         Attachment 5:  Collection of Samples for Comparison to Generic Criteria 



         Attachment 6:  Sampling Methods for Volatile Organic Compounds 



         Attachment 7:  Low Level Mercury Sampling Specifications 



RRD - 4:  Site Characterization and Remediation Verification 



         Attachment 3:  Sediments 



         Attachment 8:  Monitored Natural Attenuation 



         Attachment 9:  In Situ Remedial Discharges 



         Attachments 1-2, 4-6, 10-12 (under development) 


RRD - 5:  Groundwater Surface Water Interface Criteria 



        Attachment 1:  Request to MDEQ for Mixing Zone-based GSI Criteria (pdf or word



RRD - 6: Part 213 Institutional Controls and Notice Requirements 







Former Environmental Response Division Operational Memoranda 



Last Updated 


ERD -- 05:  Environmental Assessments and Audits (formerly Environmental Response Division Policy ERD005-90) 

Rescinded 8/21/2013


ERD -- 13:  Data Quality Objectives, Review of TMDL Excursions, and Evaluation of Laboratory Data 

2/18/93 Under Revision 


ERD -- 18: See RRD Op Memo 1 and Part 201 Rules 

All rescinded except for Attachment A and Groundwater and soil volatilization to indoor air criteria 12/10/04 


                 Technical Support Documents: Generic Soil Direct Contact Criteria(All rescinded except for attachment A) 




Former Storage Tank Division Operational Memoranda



Last Updated 


STD-07:  The changes to Part 213 on May 1, 2012, have made the Storage Tank Division Operational Memorandum STD-7 obsolete.  The management of ‘free product' has been replaced by the management of NAPL (non-aqueous phase liquids).  Corrective action requirements regarding NAPL are described in Part 213, which incorporates the American Society of Testing Materials (ASTM) Standards E1739, E2081, E2531.  The ASTM E2531-06 is entitled Standard Guide for Development of Conceptual Site Models and Remediation Strategies for Light Nonaqueous-Phase Liquids Released to the Subsurface.  If you have a specific question related to a site, feel free to contact the Remediation and Redevelopment Division's district project manager



STD-09:  Guidance and Soil Closure Verification 


              Sampling Strategies & Statistics Training referenced in STD-09  



STD-11:  Criteria for Evaluating Groundwater Not in an Aquifer 



STD-14:  Analytical Parameters & Methods, Sample Handling & Preservation for Petroleum Releases 

Addendum to Table 2:  Acceptable Analytical Methods for Common Petroleum Products 

Portions rescinded 12/10/04