2006 Dow Hazardous Waste Facility Offsite Corrective Action DocumentsContact: Cheryl Howe (517) 373-9881; Allan Taylor (517) 335-4799 Agency: Environmental Quality
January
|
Revised Draft Screening Level Ecological Risk Assessment (SLERA) Work Plan for the Tittabawassee River and Associated Floodplains
- Link to the July 2005 version of the Draft SLERA Work Plan (Appendix J)
Memo: Dow Response to USEPA Review of Draft SLERA Work Plan (1/17/2006)
Memo: Dow Response to MDEQ Review of Draft SLERA Work Plan (1/17/2006)
Revised Draft Baseline Ecological Risk Assessment (BERA) Work Plan for PCDDs and PCDFs in the Tittabawassee River and Associated Floodplains
- Link to the July 2005 version of the Draft BERA Work Plan (Appendix J)
Memo: Dow Response to USEPA Review of Draft BERA Work Plan (1/17/2006)
Memo: Dow Response to MDEQ Review of Draft BERA Work Plan (1/17/2006)
Revised Quality Assurance Project Plan (QAPP) for the Ecological Risk Assessment of dioxins in the Tittabasassee River and Floodplain
Revised Final Midland Representative Soils Sampling and Analysis Plan ( Soils SAP) in Support of Bioavailability Study and Dow Cover Letter (1/17/2006) transmitted with Soils SAP
|
February
|
March
|
Notice of Deficiency (NOD) Tittabawassee River and Floodplain Remedial Investigation Work Plan and Midland Area Soils Remedial Investigation Work Plan (3/2/2006)
Upper Saginaw River Conceptual Scoping Study and Cover Letter (3/31/2006) **Note, the Scoping Study is too large to place on this web page, Contact Cheryl Howe from the WHMD at 517-373-9881 if you need a copy of the document.
|
April
|
Dow "Path Forward" Letter (4/10/06)
DEQ Response to Dow "Path Forward" Letter (4/10/06)
Detailed Notice of Deficiency (NOD) Tittabawassee River and Floodplain Remedial Investigation Work Plan and Midland Area Soils Remedial Investigation Work Plan (4/13/06)
DEQ Response to Dow Conceptual GeoMorph Scoping Study for Upper Saginaw River (4/25/06)
|
May
|
Dow Responses to the MDEQ March 2 and April 13, 2006 Notices of Deficiency (5/1/2006)
Sampling Approach in Support of Bioavailability Study, Midland Area Soils (5/1/2006)
Transmittal E-mail and Revised Midland Soils Schedule (5/5/2006)
|
June
|
GeoMorph Sampling and Analysis Plan, Upper Tittabawassee River (6/1/2006)
Target Analyte List Technical Memorandum, Tittabawassee River and Floodplain (6/1/2006)
Sampling and Analysis Plan In Support of Bioavailability Study, Midland Area Soils (6/1/2006)
|
July
|
Final GeoMorph Sampling and Analysis Plan, Upper Tittabawassee River (7/7/2006)
DEQ Approval of GeoMorph Sampling and Analysis Plan, Upper Tittabawassee River (7/12/2006)
|
August
|
September
|
October
|
Sediment Trap Study 1 (10/16/2006)
Sediment Trap Study 2 (10/16/2006)
|
November
|
| Sampling and Analysis Plan in Support of Bioavailability Study, Midland Area Soils (6/2006 revised 11/2006) and DEQ Approval Letter (12/1/2006) |
December
|
Midland Area Soils Remedial Investigation Work Plan (12/1/2006)
- Cover Letter
- Text
- Appendices (**Note, that this is an extremely large file. Contact Cheryl Howe from the WHMD at 517-373-9881 if you need a copy of the Appendices)
Tittabawassee River and Upper Saginaw River and Floodplain Soils Remedial Investigation Work Plan ( 12/1/06)
- Cover Letter
- Volume 1 Text
- Attachment A: Figures (**Note, that this is an extremely large file. Contact Cheryl Howe from the WHMD at 517-373-9881 if you need a copy of the Attachment)
- Attachment B: Tables
- Attachment C: Technical Memorandum-Bank Erosion Bed Elevation Study-Tittabawassee River
- Attachment D: Figures D-1 through D-3 - Land Use Tittabawassee River and Upper Saginaw River
- Attachment E: Technical Memorandum-In-River, Floodwater, and Turf Mat Sampling and Analysis
- Attachment F: Historical Timeline-Historical Operations, Chemicals Produced, Waste Management Practices, and Development of Environmental Laws and Regulations
- Attachment G: Evaluation of Potential Constituents of Concern
- Attachment H: GeoMORPH Geochemistry Protocol-Tittabawassee River
- Attachment I: GeoMORPH Sample Design, Calibration and Verification
- Attachment J: GeoMORPH Overview-Iterative Investigation Process, Tittabawassee and Upper Saginaw Rivers
- Attachment K: Pilot Corrective Actions Matrix
- Attachment L: MDEQ Approval Letter Dated July 12, 2006 (GeoMORPH Sampling and Analysis Plan and Quality Assurance Project Plan-Upper Tittabawassee River, Midland, Michigan)
- Attachment M: Regulatory Checklist, Tittabawassee River and Upper Saginaw River and Floodplain Soils
- Volume 2 Text
- Volume 2 Appendices
Upper Tittabawassee River Reach O Plan and Pilot Corrective Action Plan (12/20/2006)
DEQ Letter to Dow- Tittabawassee River Interim Response Activities Reach O Plan and Pilot Corrective Action Plan (12/21/2006)
|
|