Skip Navigation
Michigan Department of Environmental QualityMichigan.gov, Official Web Site for the State of Michigan
Michigan.gov Home
close print view

Dredging Permits - Issued

Permit 13-13-0016-P (9 MB PDF): Dredging activities to remove submerged oil, oil contaminated sediment, and/or sources of oil sheen within portions of the Kalamazoo River upstream of the Ceresco Dam, mile posts 4.25 to 5.80.

Permit 13-13-0028-P (2 MB PDF): Permit to lower the elevation of the concrete spillway crest of the Ceresco Dam (mile post 5.80) from the existing elevation of 869.7 feet to 862.7 feet to initiate drawdown of the impoundment.

Talmadge Creek and Kalamazoo River mile 0 to 6


Permit 13-13-0018P (1 MB PDF), Permit 13-13-0018-P revision: Dredging activities to remove submerged oil, oil contaminated sediment, and/or sources of oil sheen within portions of the Kalamazoo River at approximate milepost 10.40 (downstream of 9 1/2 Mile Road).

Kalamazoo River mile 6 to 15


Permit 13-13-0019-P (5 MB PDF) Conduct dredging activities to remove submerged oil, oil contaminated sediment, and/or sources of oil sheen within portions of the Kalamazoo River upstream of the Battle Creek spillway, mile posts 13.90 to 15.70.

Enbridge Aerial MP 11 to 17

Permit 12-13-0002-P revised (1 MB PDF) Conduct dredging activities at mile post 36.10.

Permit 13-39-0025-P (3 MB PDF) Conduct dredging activities to remove submerged oil, oil contaminated sediment, and/or sources of oil sheen within portions of the Kalamazoo River, Morrow Lake Delta, and Morrow Lake, mile posts 36.50 to 39.85.

Enbridge Aerial MP 35 to 40

QR code

Michigan.gov Home
PoliciesMichigan NewsMichigan.gov Survey


Copyright © 2001-2014 State of Michigan