Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
LARA: Michigan Department of Licensing and Regulatory AffairsMichigan.gov: Official Web Site for the State of Michigan
Michigan.gov HomeLARA Home | Sitemap | Contacts | Online Services | Agencies
Printer Friendly Version Printer Friendly   Text Only Version Text Version  Share this page.
Pain Management Mobile C-Arm Fluoroscopic Room Shielding Guidelines

Pain management fluoroscopic x-ray procedures as performed in some facilities involve significant x-ray "beam on" time. Each room in which such x-ray procedures are performed is typically required to be shielded with the equivalent of at least 1/32-inch lead, including doors and windows. Floors and ceilings, if there is occupancy below or above, are normally required to also be equivalent to 1/32-inch lead or 2.5 inches of standard-density concrete (147 pounds per cubic foot). A facility may prefer to limit and restrict x-ray procedures to one shielded room, or to a few shielded rooms, rather than shield each room in which a mobile c-arm fluoroscopic machine might be used.

 

February 14, 2005



Related Documents
BHS/HFS-852; Application for a Radiation Shielding Plan Review - 508021 bytes PDF icon
Related Content
 •  Dental Cephalometric and Tomographic Shielding Guidelines
 •  Dental CT Shielding Guidelines
 •  Podiatric X-Ray Shielding Guidelines
 •  Mobile Lithotripsy Shielding Guidelines
 •  Radiation Shielding Plan Review and General Information
 •  Radiographic or Radiographic-Fluoroscopic Shielding Guidelines
 •  CT Scanner Shielding Guidelines
 •  Linear Accelerator Shielding Guidelines
 •  Linear Accelerator Shielding Guidelines - Mazeless Vaults
 •  Mammography Shielding Guidelines
 •  Shielding Design Guidance

Michigan.gov Home | LARA Home | State Web Sites | Office of Regulatory Reinvention
Accessibility Policy | Link Policy | Privacy Policy | Security Policy | Michigan News | Michigan.gov Survey


Copyright © 2001-2012 State of Michigan