Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of TransportationMichigan.gov banner
Michigan.gov Home MDOT Home | Site Map | Contact MDOT | FAQ | State Web Sites
Printer Friendly Version Printer Friendly   Text Only Version Text Version Email this page Email Page
Menominee lane conversion to begin in July

Contact:  James Lake 906-786-1830, ext. 323
Agency: Transportation


July 3, 2008 -- To promote safety and calm traffic, the city of Menominee has partnered with the Michigan Department of Transportation (MDOT) to introduce a trial four- to three-lane conversion on US-41 north of the M-35 intersection.

Within the next few weeks, MDOT contractors will replace the existing pavement markings that designate four lanes on US-41, from the M-35 intersection to 48th Avenue, with new markings that create a center left-turn lane and one lane of travel in each direction. This lane conversion is designed to allow motorists to make left turns more easily, while allowing through-traffic to flow smoothly.

The Menominee City Council recently signed a resolution allowing the two-year trial, which will remain in effect for a minimum of one year. MDOT is funding the necessary changes to convert US-41 to three lanes, and also would fund conversion of US-41 back to a four-lane section should the city council request it.

"The city of Menominee supports the concepts of reducing accidents and improving traffic flow, something that may very well be achieved with a three-lane conversion on US-41," said Menominee City Manager Eric Strahl. "The only way to know if this will work in this particular situation is to try the conversion on a trial basis. Doing this also will allow residents and visitors to experience the new lane configuration before it is finalized and to provide their comments to both MDOT engineers and city of Menominee staff."

The end of the trial period corresponds with the beginning of a 2010 MDOT project to reconstruct US-41 in Menominee from 20th Avenue North to 48th Avenue. If the city and MDOT agree that the trial is successful, the three-lane configuration will be made permanent.

MDOT will compare accident and delay data and report findings to the city on an annual basis during the trial period. Once the trial is complete, any future lane configurations or cross section changes for US-41 through Menominee will be the responsibility of MDOT, although input from the city would be considered.

Protect Michigan families: Where Workers Present Drive 45! - A message from MDOT and Michigan's Give 'em a Brake Safety Coalition
Link to Department and Agencies Web Site Index
Link to Statewide Online Services Index
Link to Statewide Web-based Surveys
Link to RSS feeds available on this site
Related Content
 •  Road work to begin on US-127 BR in Gratiot County
 •  Adopt-A-Highway volunteers hit the highways Sept. 13-21
 •  MDOT to add left-turn lanes on M-15 and M-54
 •  Motorists traveling to Celebration on the Grand encouraged to avoid US-131
 •  MDOT open house Sept. 17 will highlight plans for road improvements in Cheboygan in 2009 and 2010
 •  MDOT to open section of I-96 early in southwest Detroit's Gateway Project
 •  Transportation Funding Task Force to meet Sept. 8 in Lansing
 •  MDOT resumes work on I-94 Business Loop In Benton Harbor on Sept. 5
 •  Southbound US-127 resurfacing starts Monday, Sept. 8
 •  MDOT completes construction on US-131 from West River Drive to 10 Mile Road in Grand Rapids
 •  Lt. Gov. Cherry, current and former state legislators to lead Michigan Iron Industry Museum road groundbreaking
 •  Ford Road/Evergreen interchange work gets under way Sept. 2
 •  US-12 (Michigan Ave.) pavement repairs in West Dearborn to begin week of Sept. 8
 •  MDOT's M-86 bridge repair in Colon to wrap up on time
 •  Going to the game? Check traffic on MDOT Web site
 •  Work begins on new rest area at I-196 in Zeeland
 •  Resurfacing project to begin on US-131 in Montcalm County on Sept. 2
 •  Work on M-46 in Muskegon County to begin Sept. 2
 •  M-25 resurfacing work to begin Sept. 2 in Sanilac County
 •  Maintenance work scheduled for M-28 Anna River bridge

Michigan.gov Home | MDOT Home | Site Map | FAQ | State Web Sites
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2008 State of Michigan