Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of TransportationVisit www.michigan.gov!
Michigan.gov HomeMDOT Home | Site Map | Contact MDOT | FAQ | State Web Sites
Printer Friendly Version Printer Friendly   Text Only Version Text Version  Share this page.
FAQ
  Construction & Technology
Q 2. Are truck drivers employed by a construction prime contractor to transport materials from the contractor plant or yard to a Davis-Bacon covered project, or from a Davis-Bacon covered project to the contractor's plant or yard covered?
 
Answer:
Yes. If the contractor/subcontractor's plant or yard is part of the "site of the work", the drivers are covered. If the contractor/subcontractor's plant or yard is not part of the "site of the work", the drivers are generally not covered. The travel time between the plant or yard and the site of work in this instance is never covered. However, if the time spent unloading the material or equipment on the site of work is more than de minimis (20%), then this time is covered.

FAQ Categories
 •  About MDOT
 •  Auctions
 •  Winter Maintenance FAQs
 •  Bids & Contracts
 •  Bagley Avenue Pedestrian Bridge Art
 •  Bridges
 •  Bridge Operations
 •  Construction
 •  Construction Permits
 •  Construction & Technology
 •  Courtesy Patrol
 •  Driver Information
 •  Freedom of Information Act
 •  Highway Advertising Signs
 •  Highway Maintenance
 •  Local Agency Programs
 •  Logo Signs & Tourist-Oriented Signs
 •  Mackinac Bridge
 •  MiRLAP
 •  Noise Abatement
 •  Political Signs
 •  Potholes
 •  Rail Safety
 •  Rideshare
 •  Roads
 •  Safety Programs
 •  Traffic Signals
 •  Traffic Signs & Delineation
 •  Traffic & Safety
 •  Work Zone Speeds

Michigan.gov Home | MDOT Home | Site Map | FAQ | State Web Sites
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2011 State of Michigan