Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of TransportationMichigan.gov banner
Michigan.gov Home MDOT Home | Site Map | Contact MDOT | FAQ | State Web Sites
Printer Friendly Version Printer Friendly   Text Only Version Text Version Email this page Email Page
Adopt-A-Highway volunteers back on the roads July 12-20

Contact:  Janet Foran 517-335-7176
Agency: Transportation


July 8, 2008 -- Thousands of Good Samaritan volunteers will take to Michigan's roads and highways during the second of three annually designated Adopt-A-Highway pickups, scheduled from July 12-20.

"We want Michigan to look its best during our all-important summer tourist season," said State Transportation Director Kirk T. Steudle. "The 27,000 volunteers who are willing to step up to the plate to help us clean the state's highways deserve a big thank-you from the people of Michigan."

Steudle said that last year, the Michigan Department of Transportation (MDOT) spent $5.5 million to remove litter from roadsides. Adopt-A-Highway volunteers saved the department an estimated $1 million in litter pickup costs by collecting trash on 5,800 miles of roadway. More than 64,000 bags of trash were removed during three pickups in 2007.

"Motorists should use caution when they observe clean-up crews working on the roadsides," reminded Steudle. "Please slow down and watch out for our volunteers. Their safety is our number one concern and it needs to be yours, too."

This year, volunteers will be switching to a more visible, bright yellow-green safety vest with reflective stripes. The new vest, part of a nationwide safety initiative, will be required by the Federal Highway Administration to be worn by anyone working in the highway right-of-way. This rule goes into effect in November 2008.

MDOT supplies each volunteer group with safety vests, a safety video, and trash bags.

Many areas of the state highway system are still available for adoption. Groups of three or more people interested in adopting a section of highway are encouraged to contact MDOT, or visit www.michigan.gov/adoptahighway for more details. To adopt a section of highway, or discuss possibilities, interested groups are advised to contact their local MDOT coordinator (names and phone numbers are listed on the Web site).

The final 2008 pickup is scheduled for Sept. 13-21.

Protect Michigan families: Where Workers Present Drive 45! - A message from MDOT and Michigan's Give 'em a Brake Safety Coalition
Link to Department and Agencies Web Site Index
Link to Statewide Online Services Index
Link to Statewide Web-based Surveys
Link to RSS feeds available on this site
Related Content
 •  Motorists traveling to Celebration on the Grand encouraged to avoid US-131
 •  MDOT to open section of I-96 early in southwest Detroit's Gateway Project
 •  MDOT open house Sept. 17 will highlight plans for road improvements in Cheboygan in 2009 and 2010
 •  Transportation Funding Task Force to meet Sept. 8 in Lansing
 •  Lt. Gov. Cherry, current and former state legislators to lead Michigan Iron Industry Museum road groundbreaking
 •  Southbound US-127 resurfacing starts Monday, Sept. 8
 •  MDOT completes construction on US-131 from West River Drive to 10 Mile Road in Grand Rapids
 •  MDOT resumes work on I-94 Business Loop In Benton Harbor on Sept. 5
 •  Ford Road/Evergreen interchange work gets under way Sept. 2
 •  US-12 (Michigan Ave.) pavement repairs in West Dearborn to begin week of Sept. 8
 •  MDOT's M-86 bridge repair in Colon to wrap up on time
 •  Going to the game? Check traffic on MDOT Web site
 •  Work begins on new rest area at I-196 in Zeeland
 •  Work on M-46 in Muskegon County to begin Sept. 2
 •  Resurfacing project to begin on US-131 in Montcalm County on Sept. 2
 •  M-25 resurfacing work to begin Sept. 2 in Sanilac County
 •  Maintenance work scheduled for M-28 Anna River bridge
 •  MDOT begins work on I-94 and US-12 bridges in Berrien and Cass counties
 •  MDOT to begin work on M-46, M-37 and US-31 Business Route on Sept. 2
 •  Lanes to be closed for US-41 Menominee River bridge work

Michigan.gov Home | MDOT Home | Site Map | FAQ | State Web Sites
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2008 State of Michigan