HMA Percent Within Limits (PWL) Excel Spreadsheet
Use this spreadsheet in conjunction with the frequently used special provision (FUSP) 03SP504(C) Superpave Hot Mix Asphalt Percent
Within Limits (PWL) dated October 17, 2007.
Use the shoulder options in the PWL spreadsheet only when (FUSP) 03SP504(E) Hot Mix Asphalt (HMA) Shoulder Density in Conjunction
With Superpave HMA Percent Within Limits (PWL) is included in the proposal.
HMA Percent Within Limits (PWL) Capital Preventive Maintenance (CPM) Excel Spreadsheet
Use this spreadsheet on all CPM projects containing the frequently used special provision 03SP504(D) Superpave Hot Mix Asphalt
Percent Within Limits (PWL) for Capital Preventive Maintenance (CPM) Mill and Resurface Projects and CPM One Course Overlay Projects.
For questions or comments about HMA Percent Within Limits Spreadsheets, please contact:
John Barak, Bituminous Supervising Engineer
Phone: 517-322-4967 e-mail: barakj@michigan.gov