|
|  |
Printer Friendly
Text Version
Share this link:
| Prevailing Wage Compliance |
Prevailing Wage Compliance
Purpose: Provide helpful information in order to assist those who process prevailing wage issues.
A. Prevailing Wage Oversight Procedures:
- Bureau of Highways - Instructional Memos:
- Construction Advisories Related to Prevailing Wage Oversight:
B. Oversight Procedures: Proper Documentation
- Recommended and Required Project File Forms:
- Required Contractor Forms:
C. Required Jobsite Postings: These postings should be discussed at the pre-construction meeting and posted on the job site.
- Federally Required Posters:
- State Required Posters:
- Additional Required Poster/Documents
- Prevailing wage rates from the contract (Proposal, Addendum)
- Equal Employment Opportunity (EEO) policy statement.
- Letter appointing an EEO officer for the contract.
- Emergency Phone Numbers
- Permits (MI Dept. of Natural Resources & Environmental and/or US Army Corps of Engineers)
D. Training: Items to Assist with Understanding Prevailing Wage Oversight Procedures
- MDOT Wage Classification Understandings:
E. Prevailing Wage Assistance:
Revised on 4/18/2011
|
|
 |
|