This work includes the design and reconstruction of approximately 3.6 miles of freeway and includes bridge rehabilitation on 4 structures. The project will include alternate bids for the pavement and the use of recycled concrete. The bridge work on the 4 structures is anticipated to include deep and/or shallow overlays, full paint, approach work, deck patching, painting, PCI Beam End repairs, abutment repairs, and bridge widening (on two parallel structures). The project also includes reconstruction of the Hill Road Interchange.