Skip Navigation
Michigan Department of TransportationVisit www.michigan.gov!
Michigan.gov Home MDOT Home |  Site Map |  Contact MDOT |  FAQ |  State Web Sites
close print view

MDOT to begin lifting UP weight restrictions on April 26

Contact: James Lake, MDOT Office of Communications,
 LakeJ1@michigan.gov
906-786-1830, ext. 311

Agency: Transportation


April 25, 2013 -- Effective 8 a.m. Friday, April 26, weight restrictions will be lifted on all state trunkline highways from the southern Michigan border north to and including US-2 to Iron Mountain in the Upper Peninsula. Frost restrictions are still in effect on M-185 on Mackinac Island. State trunkline highways typically carry I, M or US designations.

In the restricted areas, the following will apply:
- On routes designated as "all-season routes" (designated in green and gold on the MDOT Truck Operators Map), there will be no reduction in legal axle weights.
- On routes designated as "seasonal" (designated in solid or dashed red on the MDOT Truck Operators Map), there will be a posted weight reduction of 25 percent for rigid pavements and 35 percent for flexible pavements.

All extended permits will be valid for oversize-only loads in the weight-restricted area on the restricted routes. Single-trip permits will not be issued for any overweight loads or loads exceeding 14 feet in width, 11 axles and 150 feet in overall length, on the restricted routes.

For weight restriction information and updates, call 800-787-8960, or you can access this information on MDOT's Web site at www.michigan.gov/truckers, under "Restrictions." All-season routes are designated in green and gold on the MDOT Truck Operators Map, which is available online. You also may sign up to receive e-mail alerts.

Trucking companies located in New Jersey and Canada can obtain information by calling 517-373-6256.

Roadway Work Zone Safety - We're All In This Together.
Related Content
 •  MDOT to host public meeting to discuss construction on M-125 in 2014 in Monroe County
 •  M-65 bridge over Thunder Bay River closed through August for safety reasons
 •  1.5 miles of US-31 BR (Shoreline Drive) will be resurfaced before Memorial Day
 •  M-35 reconstruction starts May 6 in Menominee
 •  MDOT to explore feasibility of transforming I-375 corridor in Detroit
 •  Public meeting scheduled for US-10 project at M-30 in Sanford
 •  Bridge improvements start Monday on Seaway Drive over Black Creek
 •  Completion of M-37 repaving in Hastings starts Monday
 •  International Bridge staff test fallen-worker retrieval system
 •  Thumb-area signal changes begin today
 •  Repaving starts Monday on M-60 and M-99 in Homer
 •  MDOT to replace US-31 culvert at Tobeco Creek starting April 29
 •  Open house set for 2014 project on M-37 in Hastings
 •  I-194 bridge repairs in Battle Creek start Monday
 •  Adopt-A-Highway litter pickup begins April 27 for northern lower Michigan, Upper Peninsula
 •  Bridge improvements start Monday on Taft Road over US-31 in Spring Lake
 •  Eighth annual asset management conference set for May 8 in East Lansing
 •  MDOT releases 2012 crash statistics for work zones
 •  MDOT's 2013 statewide construction map now available
 •  Southbound I-75 resurfacing in Oakland County begins Monday, April 22
QR code

Michigan.gov Home |  MDOT Home |  Site Map |  FAQ |  State Web Sites |  Office of Regulatory Reinvention |  Spending & Accountability
Privacy Policy |  Link Policy |  Accessibility Policy |  Security Policy | Michigan News | Michigan.gov Survey


Copyright © 2001-2013 State of Michigan