Skip Navigation
Michigan Department of TransportationVisit www.michigan.gov!
Michigan.gov Home MDOT Home |  Site Map |  Contact MDOT |  FAQ |  State Web Sites
close print view

MDOT to study Ironwood US-2 BR/Lowell Street intersection as four-way stop

Contact: James Lake, MDOT Office of Communications,
lakej1@michigan.gov
906-786-1830, ext. 323,

Agency: Transportation


Fast Facts:
- Traffic signals at three US-2 BR intersections in Ironwood are in flash mode for 90 days.
- Traffic volumes and other criteria will be reviewed to determine if the signals are needed.
- Unwarranted signals have been shown to cause unnecessary delay and increase crashes.

April 12, 2012 -- After studying traffic at three signals on the US-2 Business Route (BR) in Ironwood for about a month, the Michigan Department of Transportation (MDOT) also will now study US-2 BR/Lowell Street as a four-way stop. Motorists are urged to use extra caution at these intersections during the study period.

To determine whether three traffic signals on US-2 BR in Ironwood are needed, MDOT placed them in flashing mode for 90 days beginning March 8. Two other intersections - US-2 BR at Ayer Street and at Aurora Street/Suffolk Street - are operating as four-way stops with a flashing red light for all directions. A final determination on all the intersections will be made following the study period.

MDOT will review traffic volumes, delays, back-ups and crash data at the three intersections to determine if the signals are warranted. Preliminary review of the signals suggests the signals do not meet criteria for signals based on traffic volumes, pedestrian volumes, school crossings, crashes, and the overall roadway network.

At the end of the signal study, if the signals are found to be warranted, MDOT will continue to operate and maintain them. However, if the signals are deemed unwarranted, they will be removed. The signals could be reinstalled in the future if traffic patterns were to change and justify their addition.

Don't Barrel Through Work Zones! - Drive Smart to Stay Alive.

Related Content
 •  Southbound I-75 holiday travelers advised to seek alternate route through Saginaw County
 •  M-61 Gladwin road improvements begin Tuesday, May 28
 •  US-2 resurfacing near Marenisco starts May 28
 •  US-2/US-41 resurfacing in Delta County to start May 29
 •  Two-week detour for US-2 Cut River Bridge starts June 3
 •  Work under US-31 begins May 28 in Emmet County
 •  Resurfacing project on I-75 begins June 3 in Roscommon County
 •  Public meeting tomorrow in Fremont to discuss M-82 project
 •  MDOT removes traffic restrictions on 83 projects for Memorial Day holiday travel
 •  M-1 (Woodward Avenue) resurfacing in Oakland County expected to begin next week
 •  MDOT to hold fourth public meeting on I-275/M-153 (Ford Road) area study in Wayne County
 •  MDOT supports construction science expo and workforce development for Detroit public school students
 •  MDOT releases new 2013 state transportation map
 •  NASCAR champion stops at Bridge View Park May 29
 •  M-13 resurfacing starts Monday, May 20
 •  MDOT lifts weight restrictions on all state trunklines
 •  M-13/M-84 reconstruction moves to next phase
 •  MDOT to discuss US-31 BR (Colby Street) lane conversion and public opinion survey results in Whitehall
 •  MDOT shares bicycling safety messages on YouTube
 •  M-44 road work starts Monday in Orleans Township
QR code

Michigan.gov Home |  MDOT Home |  Site Map |  FAQ |  State Web Sites |  Office of Regulatory Reinvention |  Spending & Accountability
Privacy Policy |  Link Policy |  Accessibility Policy |  Security Policy | Michigan News | Michigan.gov Survey


Copyright © 2001-2013 State of Michigan