Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of TransportationVisit www.michigan.gov!
Michigan.gov HomeMDOT Home | Site Map | Contact MDOT | FAQ | State Web Sites
Printer Friendly Version Printer Friendly   Text Only Version Text Version  Share this page.
Preliminary work on I-75/Dix-Toledo Road interchange begins Tuesday, Feb. 21, in Wayne County

Contact:  Rob Morosi, MDOT Office of Communications, 248-483-5127
Agency: Transportation


Fast Facts:
- Dix-Toledo Road will be reconfigured into a five-lane roadway between Sibley Road and I-75.
- A single five-lane overpass will be constructed, replacing the current two bridges.
- One mile of I-75 will be reconstructed between King and Sibley roads.

February 17, 2012 -- Preliminary work on reconstructing the I-75/Dix-Toledo Road interchange in Brownstown Township will begin early next week as crews shift two-way traffic to the existing southbound bridge over the freeway. As a result, the Dix-Toledo Road overpass above I-75 will be reduced to a single lane in each direction. This work kicks off an $18 million investment to modernize the I-75/Dix-Toledo Road interchange.

The traffic shift is necessary in order for crews to begin installing new drainage for the upcoming relocated Dix-Toledo Road. In addition, crews will close the southbound Dix-Toledo Road entrance ramp to southbound I-75, and the northbound Dix-Toledo Road entrance ramp to northbound I-75. Both ramps will remain closed until November and detours will be posted.

Upon completion this fall, the new I-75/Dix-Toledo Road interchange will have dedicated entrance and exit ramps on both sides of I-75, will realign Dix-Toledo Road between Sibley Road and I-75, and widen the Dix-Toledo Road/Sibley Road intersection.

MDOT reminds drivers: Snowplows need room to groom.
Related Content
 •  Work on US-2 Sturgeon River bridge near Nahma starts May 29
 •  MDOT to open temporary ramp off I-94/I-69 for Water Street businesses in Port Huron Township
 •  Repair to Larned Street overpass above I-375 in Detroit starts week of June 4
 •  US-2 resurfacing east of Rapid River begins May 29
 •  MDOT lifts many work zone restrictions for Memorial Day holiday weekend
 •  Work begins next week on northbound US-127 near Trowbridge Road
 •  MDOT open house for M-60 and M-99 repaving in Homer
 •  MDOT to host open house May 30 for culvert replacement project on US-31 in 2013
 •  M-63 bridge over I-94 to close Tuesday for repairs
 •  MDOT to resurface US-31 in Benzie County
 •  M-82 improvements start Monday in Fremont
 •  M-3 (Gratiot Avenue) repair resumes Friday, May 18, in Macomb County
 •  MDOT to hold open house for M-85 (Fort Street) reconstruction in Wayne County
 •  New 2012 transportation map connects travelers to Pure Michigan, MDOT social media sites
 •  US-2 work between Escanaba and Gladstone to start May 23
 •  MDOT opens the first phase of the Gateway project ahead of schedule
 •  Traffic changes for US-2 road work in Iron River to start May 21
 •  US-23 and I-75 bridge work scheduled in Arenac County
 •  New Pine Grove Connector via Harker Street approved, work to start this fall
 •  MDOT reminder: All lanes of M-150 (Rochester Road) to close tomorrow in downtown Rochester

Michigan.gov Home | MDOT Home | Site Map | FAQ | State Web Sites | Office of Regulatory Reinvention
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2012 State of Michigan