IM-2015

  • IM15-03 - Materials Quality Assurance Procedures (MQAP) Manual (incorporated into the updated manual)
  • IM15-02 - Review of Contractor Claims (Supersedes BOH IM 2011-07) (incorporated into the Construction Manual, Division 1, Section 104)
  • IM15-01 - Density Testing and Inspection Manual (incorporated into the updated manual)

IM-2014

  • IM14-12 - Hot Mix Asphalt Production Manual (incorporated into the updated manual)
  • IM14-11 - Digital Electronic Signature (DES) Validation Procedures (incorporated into the Construction Manual, Division 1 Supplemental Information, E-Signature)
  • IM14-10 - Freeway Work Zone Design Guidance PDF icon
  • IM14-09 - External Civil Rights Requirements, EEO, Title VI, OJT, and DBE for Federal Aid Construction Projects (incorporated into the Construction Manual, Division 1 Supplemental Information, Disadvantaged Business Enterprises)
  • IM14-08 - Construction Subcontracting Process (Supersedes BOH IM 2004-15) (incorporated into the Construction Manual, Division 1, Section 108)
  • IM14-07 - Construction Guidance for Pavement Marking Projects (incorporated into the Construction Manual, Division 8, Section 811)
  • IM14-06 - Progress Clause for Steel Superstructure Projects (Supersedes BOH IM 2008-12) (incorporated into the Construction Manual, Division 7, Section 707)
  • IM14-05 - Pavement Marking Turn Arrows (Supersedes BOH IM 2013-10) (incorporated into the Construction Manual, Division 8, Section 811)
  • IM14-04 - Materials Quality Assurance Procedures Manual (incorporated into the updated manual)
  • IM14-03 - Construction Value Engineering Change Proposal (VECP) (Supersedes BOH IM 2002-08) (incorporated into the Construction Manual, Division 1, Section 104)
  • IM14-02 - Bridge Construction and Bridge Deck Construction Inspection (Supersedes BOH IM 2007-02) (incorporated into the Construction Manual, Division 7)
  • IM14-01 - Preconstruction Meetings (incorporated into the Construction Manual, Division 1, Section 102)

IM-2013

  • IM13-16 - Contract Modification Procedures for FHWA Oversight Projects (Supersedes BOH IM 2011-05) (incorporated into the Construction Manual, Division 1, Section 103)
  • IM13-15 - Progress Clauses, Liquidated Damages, Incentives, Quality Initiatives and Adjustments, and FieldManager Documentation (Supersedes BOH IM 2009-01) (incorporated into the Construction Manual, Division 1)
  • IM13-14 - Winter Construction Storm Water Inspection Reports (incorporated into the Construction Manual, Section 208)
  • IM13-13 - Materials Quality Assurance Procedures Manual (incorporated into the updated manual)
  • IM13-12 - Disadvantaged Business Enterprise (DBE) Commercially Useful Function (CUF) Compliance (incorporated into the Construction Manual, Division 1, Section 102)
  • IM13-11 - FieldManager Read-Only Files for Local Agency and Consultant Projects (incorporated into the Construction Manual, Division 1 Supplemental Information, Local Agency)
  • IM13-10 - Acceptance of Left Turn and Right Turn Pavement Marking Arrows (Superseded by IM14-05)
  • IM13-09 - Michigan Certified Aggregate Technician Program Transition (incorporated into the Construction Manual, Division 3 Supplemental Information)
  • IM13-08 - Pay Estimates and Inactive Project Notification (incorporated into the Construction Manual, Division 1, Section 109)
  • IM13-07 - Acceptance/Rejection of Fabricated Structural Elements Shipped to the Project Site (Supersedes BOH IM 2004-04) (incorporated into the Construction Manual, Division 7, Section 707)
  • IM13-06 - Authorization to Allow the Use of Recycled Asphalt Shingles (RAS) in Hot Mix Asphalt (HMA) (incorporated into a FUSP)
  • IM13-05 - Field Splicing of Steel Foundation Piles (incorporated into the Construction Manual, Division 7, Section 705)
  • IM13-04 - Construction Oversight of Local Agency Force Account Projects (incorporated into the Construction Manual, Division 1, Section 109)
  • IM13-03 - Office Technician Certification Requirements (incorporated into the Construction Manual, Division 1 Supplemental Information, Certification Programs)
  • IM13-02 - Authorization to Allow the Use of Fine Toothed Milling for Ride Quality Corrective Action on Asphalt Pavements (incorporated into a FUSP)
  • IM13-01 - Special Provision for Source of Steel and Iron (Buy America) (Supersedes BOH IM 2012-06) (incorporated into the Construction Manual, Division 1, Section 105)

IM-2012

  • IM12-12 - Timely Progress Payments to Contractors (incorporated into the Construction Manual, Division 1, Section 109)
  • IM12-11 - Required Signature on Construction Pay Estimates (incorporated into the Construction Manual, Division 1, Section 109)
  • IM12-10 - Distribution of Geotechnical Data (incorporated into the Bridge Design Manual)
  • IM12-09 - Authorization to Allow the Switch from HMA Superpave Mix to Warm Mix Asphalt (WMA) and to Change the Requirement for AC Binder Sampling when WMA is Being Produced (incorporated into a FUSP)
  • IM12-08 - Michigan Test Method 319, Determination of Asphalt Content from Asphalt Paving Mixtures by the Ignition Method and the Contractor's Responsibilities for the Established of Ignition Oven Correction Factors (incorporated into a MTM)
  • IM12-07 - Type D Lights on Plastic Drum Channelizing Devices (incorporated into a FUSP)
  • IM12-06 - Special Provision for Source of Steel and Iron (Buy America)(Superseded by IM13-01)
  • IM12-05 - Crushed Concrete near Regulated Watercourses (incorporated into a FUSP)
  • IM12-04 - Adding Crush Minimum Criteria to 2012 HMA Projects (incorporated into Standard Specifications by Errata)
  • IM12-03 - Processing Contract Modifications (incorporated into the Construction Manual, Division 1, Section 103)
  • IM12-02 - Digitally Encrypted Electronic Signatures (incorporated into the Construction Manual) PDF icon
  • IM12-01 - Revised Life Cycle Cost Analysis Process (incorporated into the Pavement Selection Manual)

IM-2011

  • IM11-08 - Documenting Certified Construction Materials Using FieldManager and FieldBook and Changes to the Materials Source List, Form 501, and Processing Procedures (incorporated into the Construction Manual, Division 1, Section 105)
  • IM11-07 - Review of Contractor Claims (Superseded by IM15-02)
  • IM11-06 - Field Review of Prompt Payment Complaints (incorporated into the Construction Manual, Division 1, Section 109)
  • IM11-05 - FHWA Oversight Project Contract Modification Procedures (Superseded by IM13-16)
  • IM11-04 - Final Estimate Review Procedure (incorporated into the Construction Manual, Division 1, Section 109)
  • IM11-03 - Contract Administration and Oversight Guidelines for Intelligent Transportation Systems Projects (incorporated into the Construction Manual, Division 1 Supplemental Information, Other)
  • IM11-02 - Portable Changeable Message Sign Guidelines PDF icon
  • IM11-01 - Contractor Performance Evaluation PDF icon

IM-2010

  • IM10-11 - Type D Lights on Plastic Drum Channelizing Devices (Superseded by IM12-07)
  • IM10-10 - Guidelines for Electrical Traffic Control Device Maintenance
  • IM10-09 - Innovative Construction Contracting Manual and Procedures (incorporated into the Innovative Construction Contracting Guide)
  • IM10-08 - MDOT Form 501, Materials Source List (formerly known as Testing Order) (Superseded by IM11-08)
  • IM10-07 - Using FieldManager to Track Design-Build Contracts (incorporated into the Construction Manual, Division 1 Supplemental Information, FieldManager )
  • IM10-06 - Pavement Historical Database (PHD) - Annual Data Entry (incorporated into the Construction Manual, Division 1 Supplemental Information, Other)
  • IM10-05 - Processing Sewage/Storm Water Damage Claims (incorporated into the Construction Manual, Division 1, Section 104)
  • IM10-04 - Weight Limit Waivers (incorporated into the Construction Manual, Division 1, Section 104)
  • IM10-03 - Materials Quality Assurance Procedures Manual Update (incorporated into the updated manual)
  • IM10-02 - Construction and Technology (C&T) Division Procedures Manual Updates
  • IM10-01 - Work Zone Safety and Mobility (WZSM), Subpart K

IM-2009

  • IM09-09 - Disadvantaged Business Enterprise (DBE) Participation as Regular Dealers of Liquid Asphalt (incorporated into the Construction Manual, Division 1, Section 102)
  • IM09-08 - Base Mounted Controller Cabinets & Box Span Displays for Traffic Signals
  • IM09-07 - Prevailing Wage Oversight Procedures (incorporated into the Construction Manual, Division 1, Section 107)
  • IM09-06 - Region Oversight of Local Agency Construction Projects (incorporated into the Construction Manual, Division 1 Supplemental Information, Local Agency)
  • IM09-05 - Revisions to the 2006 Soil Erosion and Sedimentation Control Manual (incorporated into the updated SESC manual)
  • IM09-04 - Contract Administration and Oversight Guidelines for Projects Containing Warranty Work (incorporated into the Construction Manual, Division 1, Section 102)
  • IM09-03 - Unreasonable Delays due to Utility Companies (Information placed in the Construction Manual in Division 1, Section 108)
  • IM09-02 - Local Agency Cost Reimbursement for Liquidated Damages (incorporated into the Construction Manual, Division 1 Supplemental Information, Local Agency)
  • IM09-01 - Liquidated Damages and Quality Adjustments on Contract Modifications (Superseded by IM13-15)

IM-2008

  • IM08-15 - Open Graded Drainage Course, Modified FUSP 03SP303(A)
  • IM08-14 - Hydrodemolition and Bridge Deck Overlay Construction Inspection (incorporated into the Construction Manual, Division 7)
  • IM08-13 - Procedures for Special Placement in the Engineering Technician Work Element Program
  • IM08-12 - Progress Clause for Steel Superstructure Projects (Superseded by IM14-06)
  • IM08-11 - Implementation of ProjectWise Document Storage System for Hot Mix Asphalt
  • IM08-10 - Authorization to Change Asphalt Cement (AC) Binder Content Calculation Method for Hot Mix Asphalt (HMA) Placed and Accepted under Frequently Used Special Provisions (FUSPs)
  • IM08-09 - Retention and Disposal of Construction Project Records (incorporated into the Construction Manual, Division 1)
  • IM08-08 - Clarification of FUSP 03SP504(C) Superpave Hot Mix Asphalt Percent Within Limits (PWL) Intent
  • IM08-07 - Moratorium on the use of Adhesive Anchors in Sustained Tensile-Load-Only Overhead Applications
  • IM08-06 - Prevailing Wage Oversight Procedures (Superseded by IM09-07)
  • IM08-05 - Bridge Weight Restrictions
  • IM08-04 - 2008 Edition of the Hot Mix Asphalt (HMA) Production Manual
  • IM08-03 - Materials Quality Assurance Procedures Manual Update
  • IM08-02 - Review of Contractor Claims (Superseded by IM11-07)
  • IM08-01 - Information Sharing About Construction Contractors and Consultants

IM-2007

  • IM07-09 - Post Construction Reviews
  • IM07-08 - FieldManager Contractor Read-Only Copies PDF icon
  • IM07-07 - Changes to Ride Quality Specification
  • IM07-06 - 2007 Edition of the Guidelines for Administering Warranties on Road and Bridge Construction Contracts
  • IM07-05 - Discontinue use of Form FHWA-47, Statement of Materials and Labor
  • IM07-04 - Final Estimate Procedure Update
  • IM07-03 - Maintenance Crossover Revised Spacing Requirements and Removal of Unnecessary Locations
  • IM07-02 - Bridge Construction and Bridge Deck Construction Inspection (Superseded by IM14-02)
  • IM07-01 - 2007 Update to the Michigan Test Methods Manual

IM-2006

  • IM06-14 - Pass-Through Warranty Bonds
  • IM06-13 - Project Record Certification Program (incorporated into the Construction Manual, Division 1 Supplemental Information, Certification Programs)
  • IM06-12 - Sign Reflective Sheeting Material
  • IM06-11 - Revisions to the Weekly Employment Report, Form 1199
  • IM06-10 - Region Oversight of Local Agency Construction Projects (Superseded by IM09-06)
  • IM06-09-Revised-RESCINDED - Establishment of Maximum Amounts for Minor Traffic Devices and Flag Control
  • IM06-08 - Policy for Freedom of Information Act Requests for Bridge Inspection Reports
  • IM06-07 - 2006 Soil Erosion and Sedimentation Control Manual
  • IM06-06 - Certified Payrolls, Wage Rates, and Employment Reporting on State and Federally Funded Projects
  • IM06-05 - Materials Quality Assurance Procedures Manual Update
  • IM06-04 - Qualification Procedure for Class B Culvert and Sewer Plastic Pipe
  • IM06-03 - Retention and Disposal of Construction Project Records (Superseded by IM08-09)
  • IM06-02 - Elimination of Retainage on Construction and Maintenance Projects
  • IM06-01 - New Work Zone Signing

IM-2005

  • IM05-16 - Guidelines to Establish Speed Limits in Work Zones PDF icon
  • IM05-15 - Box Span Displays for Traffic Signals
  • IM05-14 - Federal Participation in Contractor Claims and Court Awards
  • IM05-13 - Bridge Painting Inspection and Lead Exposure in Construction (incorporated into the Construction Manual, Division 7, Section 715)
  • IM05-12 - Enforcement of County Haul Route Permits
  • IM05-11 - Federal Highway Administration Approval Limits on Contract Modifications (Superseded by IM11-05)
  • IM05-10 - Procedures for Job Mix Formula Adjustments
  • IM05-09 - Waiver of Contract Specification Requirements and/or Changes to Material Requirements
  • IM05-08 - Implementation of the Vacuum Extraction Method for the Determination of Asphalt Binder Content
  • IM05-07 - Extending Project Limits on Existing Projects (incorporated into the Construction Manual, Division 1, Section 103)
  • IM05-06 - Testing Requirements for Capital Preventive Maintenance Hot Mix Asphalt Projects
  • IM05-05 - Frangible Light Standard Transformer Base
  • IM05-04 - Pedestrian Signal Guideline
  • IM05-03 - Labeling Storm Water Outfalls
  • IM05-02 - Region Oversight of Local Agency Construction Projects (Superseded by IM09-06)
  • IM05-01 - Licensed Electrician Required on Electrical Work (incorporated into the Construction Manual, Division 1, Section 707)

IM-2004

  • IM04-26 - Documentation Requirements for Partial Payment for Materials Stockpiled Off Site
  • IM04-25 - C&T Support Area Procedures Manuals - 2004 Annual Updates
  • IM04-24 - Dark Signals Due to Power Outage
  • IM04-23 - SESC Training and Deficiency Correction Requirements
  • IM04-22 - Retention and Disposal of Construction Project Records (Superseded by IM08-09)
  • IM04-21 - Davis-Bacon and Prevailing Wage Compliance (incorporated into the Construction Manual, Division 1, Section 707)
  • IM04-20 - Pre-Contract Acceptance Processing of Reduction in Retainage
  • IM04-19 - Portable Changeable Message Sign Guidelines (Superseded by IM11-02)
  • IM04-18 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • IM04-17 - Michigan Test Method 314, Theoretical Maximum Specific Gravity of HMA Paving Mixtures and Michigan Test Method 315, Bulk Specific Gravity and Density of Compacted HMA Mixtures Using Saturated Surface-Dry Specimens
  • IM04-16 - Implementation of Tensile Strength Ratio (TSR) Worksheet, Form 1937
  • IM04-15 - Subcontracting Process Change (Superseded by IM14-08)
  • IM04-14 - Processing Contract Modifications (Superseded by IM12-03)
  • IM04-13 - Procedures for Performance Demonstration for Construction Technicians
  • IM04-12 - Michigan Test Method 321 - 04, Determining Specific Gravity and Absorption of Fine Aggregates
  • IM-04-11 - New Work Zone Signing Required by Law
  • IM04-10 - Illicit Discharge Elimination Program Procedure (incorporated into the Construction Manual, Division 4, Section 402)
  • IM04-09 - Guidelines for Using a Truck-Mounted Attenuator on Construction Projects PDF icon
  • IM04-08 - Project Record Certification Program
  • IM04-07 - Clarification on Hot Mix Asphalt (HMA) Specifications Requirements and Testing Procedures
  • IM04-06 - Open Graded Base Course, Modified and Aggregate Base Under HMA
  • IM04-05 - Asbestos Identification, Sampling, Notification, Removal and Disposal
  • IM04-04 - Acceptance/Rejection of Fabricated Structural Components Shipped to the Project Site (Superseded by IM04-04)
  • IM04-03 - Elimination of Bi-Weekly Construction Progress Report (Form 1102A)
  • IM04-02 - Guidelines for Application of Temporary Edge Line Markings on Construction Projects PDF icon
  • IM04-01 - Light Emitting Diode (LED) Traffic and Pedestrian Signal Installations

IM-2003

  • IM03-01 - Procedures for Submitting Top Course HMA Mix Design Aggregates for AWI Determination
  • IM03-02 - Guidelines to Use Permanent Changeable Message Signs (CMS)for AMBER Alert Messages
  • IM03-03 Revised - MDOT Guidelines for Administering Warranties on Road and Bridge Construction Contracts
  • IM03-04 - Asphalt Binder Sample Identification
  • IM03-05 - 2003 Edition of the MDOT Construction Manual
  • IM03-06 - Construction Projects Records Retention
  • IM03-07 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • IM03-08 - Changes to Frequently Used Special Provisions and Supplemental Specification for Errata to the 2003 Standard Specifications for Construction
  • IM03-09 - Changes in the Method of Calculating the Blended Aggregate Wear Index (AWI) Value for all Top Course Hot Mix Asphalt (HMA) Mix Designs
  • IM03-10 - Review and Approval Process for Special Provisions
  • IM03-11 - FieldManager Contractor Read-Only File Distribution
  • IM03-12 - Attenuator Purchasing Program
  • IM03-13 - Notice of Termination of National Pollutant Discharge Elimination System (NPDES) Storm Water Discharges From Construction Activities Authorization and the Deactivation of the MDEQ Site Identification Numbers, Where Applicable
  • IM03-14 - Excerpts From Surface Preparation and Coating of Concrete (SSPC) Publication 98-05 to be Used With the Special Provision for Concrete Surface Coatings
  • IM03-15 - Construction and Technology Support Area Procedures Manuals - 2003 Annual Updates
  • IM03-16 - Welder Certification by Agency (WCBA) Testing
  • IM03-17 - Upgrading Pavement Markings on Future Pavement Construction/Reconstruction Projects (Deleted)
  • IM03-18 - Elimination of Bi-Weekly Construction Progress Report (Form 1102A) (Superseded by IM04-03)

IM-2002

  • IM02-01 Revised - 2001 Edition of the Construction and Technology Division's Procedures Manuals
  • IM02-02 - MDOT's Monthly On the Job Training Pilot Program Report and Training Log (Form 0125) Procedures
  • IM02-03 Revised - Contractor Performance Evaluations (Superseded by IM11-01)
  • IM02-04 - Default of Contract
  • IM02-05 - Documenting Certified Construction Materials Using FieldManager and FieldBook (Superseded by IM11-08)
  • IM02-06 - Final Marked Plans - Log Jobs
  • IM02-07 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • IM02-08 - Construction Value Engineering Change Proposal (Superseded by IM14-03)
  • IM02-09 - Qualifications for Sampling HMA Behind the Paver
  • IM02-10 - FieldManager "Guest" User Account
  • IM02-11 - Federal Highway Administration Approval Limits on Contract Modifications (Superseded by IM11-05)
  • IM02-12 - Polymer Coated Steel Pipe
  • IM02-13 - Damage Claim Procedures
  • IM02-14 - Final Project Reviews, Monitoring Construction Engineering Consultants, and Incentive/Disincentive Projects (Information incorporated into the Construction Manual)
  • IM02-15 - Construction Subcontracting
  • IM02-16 - Updated Asphalt Certification Documentation Requirements
  • IM02-17 - Contractor Claim Decision Letters
  • IM02-18 - Procedures Manuals - 2002 Annual Updates
  • IM02-19 - Concrete Quality Assurance for Small Quantities of Concrete
  • IM02-20 - Progress Schedule Form 1130
  • IM02-21 - Transition Period for New 8 Foot Type III Barricade
  • IM02-22 - Ride Quality Incentive Payments
  • IM02-23 - Contract Administration and Oversight Guidelines for Projects Containing Warranty Work

IM-2001

  • IM01-01 - Mandrel Testing Plastic Pipe
  • IM01-02 - Experimental Traffic control Devices/Methods in Work Zones
  • IM01-03 - Extending Project Limits on Existing Projects (Superseded by IM05-07)
  • IM01-04 - Updated Asphalt Binder Certification Procedures and Project Documentation
  • IM01-05 - Revised Progress Schedule Form 1130
  • IM01-06 - Asphalt Binder on Local Agency Projects
  • IM01-07 - Field Verification of Bituminous Mix Design
  • IM01-09 - Distribution of Final Estimate Reviews
  • IM01-10 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • IM01-11 - Supplemental Specification SS102.2 Partnering
  • IM01-12 - MDOT Bridge Inspection Quality Assurance and Quality Control Program
  • IM01-13 - Sampling and Testing of Bituminous Density Cores
  • IM01-14 - New Work Zone Sign Required by Law
  • IM01-15 - Retainage on Construction and Maintenance Projects (Superseded by IM06-02)
  • IM01-19 - Notification of Warranty Claim
  • IM01-20 - Witnessing and Custody of Ride Quality Measurements

IM-2000

  • IM00-01 - Improving Safety of Night Work
  • IM00-02 - Soil Erosion and Sedimentation Control Manual
  • IM00-03 - Ride Quality on 2 Course Bituminous Overlays
  • IM00-04 - Qualifications Requirements Sampling and Testing on the NHS
  • IM00-05 - Processing Contract Modifications - FieldManager 3.0 (Superseded by IM12-03)
  • IM00-06 - Special Provision for Critical Path Method Network Schedule
  • IM00-07 - Revised Project Final Inspection/Acceptance and Certification Report - Form 1120, and Final Estimate Checklist
  • IM00-08 - Field Verification of Bituminous Mix Design - Pilot Study for 2000 Construction Season
  • IM00-09 - Length of Work and End Road Work (G20 Series) Signing
  • IM00-10 - Temporary Pavement Markings in Construction Zones
  • IM00-11 - 2000 Spring Updates to the Construction and Technology Division's Procedures Manuals
  • IM00-12 - Compacting Bituminous Mixtures
  • IM00-13 - Revised Procedures Manual for Mix Design Processing
  • IM00-15 - Construction Management Process for Construction Work Performed at Non-Trunkline Railroad Grade Crossings
  • IM00-16 - Bituminous Mixture Sampling Qualifications
  • IM00-17 - Determination of Moisture in Soils by Means of Calcium Carbide Gas Pressure Moisture Tester
  • IM00-19 - 2000 Fall Updates to the Construction and Technology Division's Procedures Manuals
  • IM00-20 - Revision of Final Estimate Checklist
  • IM00-21 - Qualifying Local Agency Technicians (Supplement to BOH IM 2000-04)

IM-1999

  • IM99-01 - Revisions to MDOT Materials Quality Assurance Manual
  • IM99-02 - Effective Date for Aggregate Wear Index (AWI) for Quarried, Waste Mine Rock and Slag Aggregate Sources
  • IM99-03 - Standard Plan R-80-B (Special Detail) and IV-80F (Special Detail)
  • IM99-04 - FieldManager Contract Initialization Files for Consultants
  • IM99-05 - Materials Quality Assurance Procedures Manual Section E (Revised) Independent Assurance Test Procedures
  • IM99-06 - Final Inspection/Acceptance and Certification Report - Form 1120
  • IM99-07 - Extending Project Limits on Existing Projects (Superseded by IM05-07)
  • IM99-08 - Contract Administration and Oversight Guidelines for Warranty Work (Supersedes CCL97-B)
  • IM99-09 - Revisions to MDOT Resident/Delivery/Project Engineer Project Record Certification
  • IM99-10 - Concrete Quality Assurance/Quality Control (QA/QC) Program
  • IM99-11 - Submitting Final Estimates for Projects With Total Consultant Construction Engineering Oversight
  • IM99-12 - Special Provision Process Upgrade
  • IM99-13 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • IM99-14 - Processing of Contract Modifications
  • IM99-15 - Materials Sampling Guide
  • IM99-16 - Unreasonable Delays Due to Utility Companies (Superseded by IM09-03)
  • IM99-17 - Reclaimed Asphalt Pavement (RAP)
  • IM99-18 - Bituminous Overlay Construction Issues
  • IM99-19 - 1999 Fall Updates to the Construction and Technology Division's Procedures Manuals
  • IM99-20 - Cantilever Sign Supports
  • IM99-21 & 22 - Renumbered to 2000-01 & 2000-02
  • IM99-23 - Quality Control/Quality Assurance (QC/QA) Procedures Manual of Field Testing

IM-1998

  • IM98-01 - Inspection and Acceptance of Traffic Sign Contracts
  • IM98-03 Revised - Standard Plan R-80B (Special Detail) and IV-80F (Special Detail) (Superseded by IM99-03)
  • IM98-04 - Documentation of Time Charged to Local Government Agency Projects
  • IM98-05 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM 06-06)
  • IM98-06 - Notification of Overwidth and Overweight Restrictions on Construction Projects Using the AAA Notification Form
  • IM98-07 - Inspection of Prestressed Concrete Beams for Stockpile Purposes
  • IM98-08 - Materials Quality Assurance Manual Section A11 (new) Construction Project Documentation Required for Minimum Job Control Deviations
  • IM98-09 - Revisions to MDOT Materials Quality Assurance Manual
  • IM98-11 - Special Provisions for Maintaining Traffic
  • IM98-12 - Welder Certification by Agency Testing

IM-1997

  • CIM97-1 - Construction Value Engineering Change Proposal (Superseded by IM02-08)
  • CIM97-2 - Region Oversight Local Agency Construction Projects
  • CIM97-3 - Speed Limits in Work Zones
  • CIM97-4 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • CIM97-5 - Erection of Cantilever and Truss Supported Signs, Tower Lighting, and Light Standards (Amendment to CIM 1994-11)
  • CIM97-6 - Inspection and Control of Small Quantities of Concrete
  • CIM97-7 - Progress Schedule Determinations/Critical Path Rates
  • CIM97-8 - Equipment Back-Up Warning
  • CIM97-A - Resident/Project Engineer Project Record Certification
  • CIM97-B - Interim Procedure for Acceptance of Aluminum Sheet for Permanent Signs
  • CIM97-C - Interim Procedures for Inspection/Acceptance of Sign Contracts (Superseded by IM97-C-S)
  • CIM97-C-S - Interim Procedures for Inspection/Acceptance of Sign Contracts
  • CIM97-D Revised - Bridge Rehabilitation Design-Build Projects
  • CIM97-F - Final Estimate Cover Letter/Checklist
  • CIM97-G - Pavement Marking Equipment Certification
  • CIM97-H - Line of Authority in Regions
  • CIM97-I - Bi-Weekly Construction Progress Report
  • CIM97-J - Recommendation/Authorization and Progress Schedule Approval Procedures

IM-1996

  • CIM96-01 - Statewide Trunkline Construction News Releases, New Procedure
  • CIM96-02 - LED Lights and Solar-Assist Lighted Arrow Usage for 1996 Construction Season
  • CIM96-03 - Guardrail Anchorage Cable (SRT)
  • CIM96-04 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by IM06-06)
  • CIM96-05 - Expansion of the Use of Solar Assist Arrow Boards for the 1996 Construction Season
  • CIM96-06 - Night Reviews of Construction Projects
  • CIM96-07 - Reduction in Reserve Request
  • CIM96-08 - Additional Rubblizing Equipment
  • CIM96-09 - Extension of Time
  • CIM96-10 - Force Accounts
  • CIM96-11 - Contractor Evaluations
  • CIM96-12 - Resident/Project Engineer Certification, Review of Certified Payrolls
  • CIM96-13 - Traffic Control Price Adjustments for Authorized Extensions of Time
  • CIM96-B - Michigan One Point Cone Tests
  • CIM96-C - Inspection/Acceptance of Sign Upgrading Projects
  • CIM96-D - Final Estimate Processing
  • CIM96-E - Procedure for Establishing Maximum Unit Weight and Desirable Moisture Content on Crush and Shape Projects
  • CIM96-F - Final Inspection, Punch List and Project Acceptance
  • CIM96-G - Expanded Use of Solar Assist Arrow Boards and LED Warning Lights
  • CIM96-H - Welding Beam End Repairs

IM-1995

  • CIM95-02 - Mobilization Measurement and Payment
  • CIM95-A - Hazardous Waste Identification Numbers (MID Numbers)
  • CIM95-C - Retexturing Ground Concrete Pavement
  • CIM95-G - Inspection of Traffic Sign Contracts
  • CIM95-I - Construction Inspection and Certification Report Form 1120 (5/92)

IM-1994

  • CCL94-01 - Rental Rates for the 1993 "Special Provisions for Force Account Work" for Contractor Owned Trucks Used to Haul Material
  • CIM94-04 - Ticket Requirements for Concrete Batch Plants
  • CIM94-05 - 1994 Special Provision for Force Account Work
  • CIM94-06 - Davis-Bacon Act Compliance - Minimum Wage
  • CIM94-07 - Transportation Work Authorizations for Local Agency Projects
  • CIM94-08 - Loading Software on the CPRKS PC
  • CIM94-11 - Erection of Cantilever and Truss Supported Signs, Tower Lighting, and Light Standards
  • CIM94-13 - Copies of Concrete Test Reports
  • CIM94-16 - Project Engineer Certification Program
  • CIM94-17 - Changing of Progress Schedule Dates Before Awarded
  • CIM94-B - Bridge Warranty Painting Projects
  • CIM94-D - MCPA Concrete Technician Training Course
  • CIM94-E - Documentation Involving Certified P.C.C. Batch Plants
  • CIM94-F-Rev - Unreasonable Delays Due to Utility Companies
  • CIM94-I - Recommendations for Changes, Adjustments and Extra Work to the Contract
  • CIM94-J - Post Final Construction Estimate

IM-1993

  • CIM93-01 - Water-Cement Ratio Testing
  • CIM93-02 - Documentation of Contractor Claims
  • CIM93-03 - MIOSHA Emergency Rules
  • CIM93-04 - Progress Payment for Lump Sum Items
  • CIM93-05 - Disposing and Labeling Spent Abrasive - Bridge Painting
  • CIM93-07 - Special Provision - Plant Mixed Bituminous Mixtures Reduction in Price - 2C, 3C, 4C
  • CIM93-09 - Retention of Records
  • CIM93-10 - Extras and Adjustments Over $10,000
  • CIM93-11 - Contractor Evaluation - Additional Items (Superseded by IM96-11)
  • CIM93-12 - Warning Lights on Construction Sign
  • CIM93-13 - Two Year Project Record Certification Program for Local Government Engineers
  • CIM93-14 - Recommendations for Bituminous Mixture - Quality Assurance Adjustments
  • CIM93-15 - Rental Rates for Contractor Owned Trucks Used to Haul Material
  • CIM93-16 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews And Certified Payrolls
  • CIM93-17 - Implementation of Transportation Projects Through Local Contracting
  • CIM93-18 - Force Accounts - Effective Date of Blue Book
  • CIM93-19 - Quality Standards for Work Zone Traffic Control Devices
  • CIM93-20 - Subcontractor for Designated and Specialty Items
  • CIM93-21 - Safety
  • CIM93-22 - Occupational Safety and Health Administration (OSHA) Lead Exposure In Construction
  • CIM93-23 - CPRKS
  • CIM93-25 - Deletion of Construction Instructional Memorandum 1993-20
  • CIM93-27 - Forms 1104 and 1151, On-The-Job-Training Program
  • CIM93-29 - Conversion of Compressive Strength to Flexural Strength
  • CIM93-30 - Highway Preventative Maintenance Program - Overruns

IM-1992

  • CIM92-01 - Central Office Review Procedures
  • CIM92-02 - Protection of Environment and Control of Hazardous Materials and Polluting Materials
  • CIM92-03 - MIOSHA Revision
  • CIM92-04 - Materials Certificate
  • CIM92-05 - Materials Certificate
  • CIM92-06 - Subsection 1.04.02 of the 1990 Standard Specifications Changes in Quantities, Plans, or Character of the Work
  • CIM92-07 - Bridge Painting
  • CIM92-08 - DBE Program - Project Performance Evaluation (Superseded by IM92-17)
  • CIM92-09 - Type I Signs (Aluminum Extruded Panels)
  • CIM92-10 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews and Certified Payrolls (Superseded by CIM93-16)
  • CIM92-12 - Revised Progress Schedule Form (1130)
  • CIM92-13 - Explanation of Construction Circular Letter 1992-3 Approval of Extra Work and Overruns of Contract Quantities
  • CIM92-14 - Construction Inspection & Certification Report (Form 1120)
  • CIM92-15 - Progress Schedule for Bituminous Paving Projects
  • CIM92-16 - Recommendations Concerning Central Office Review Determinations
  • CIM92-17 - DBE Program - Project Performance Evaluation
  • CIM92-18 - Construction Inspection and Certification Report for 1120 (5/92)
  • CIM92-20 - Shop Drawings and Structural Steel Pay Weight Letters
  • CIM92-21 - Eligibility of Federal Participation on Authorizations
  • CIM92-22 - Distribution of Reports to FHWA
  • CIM92-23 - Bolted Connections - Steel Sign Trusses

IM-1991

  • CIM91-08 - Discontinue Use of Form 1118-Unsubmitted Final Report
  • CIM91-10 - Davis-Bacon Act Compliance - Minimum Wage Rate Interviews And Certified Payrolls (Superseded by CIM93-16)
  • CIM91-13 - Construction Inspection/Certification Process
  • CIM91-15 - Recommendations - Originals and Copies
  • CIM91-16 - Construction Inspection/Certification Process (Minor Changes In Procedures

IM-1990

  • CIM90-16 - Random Forms 1104 And 1151, On-The-Job Training Program
  • CIM90-18 - Prime Contractor Statement Of Dbe/Mbe/Wbe/Hbo Subcontractor Payments

Construction Circular Letters