To review the Net Metering Tariff, you can open the "Complete Ratebook" using the top link on the Web page. The PDF file has a Table Of Contents, which includes "Net Metering".
To review rate options for non-net-metering installations, including all those 30 kW and larger, see the "Rate Schedules -- St Joseph Rate Area" or "Rate Schedules -- Three Rivers Rate Area". In those pages, look for "TARIFF COGEN/SPP" (Cogeneration and/or Small Power Production Service). Page numbers are in the upper right-hand corner of each page. In the St Joseph Rate Area section, this is pages 26 through 26.8. In the Three Rivers Rate Area section, this is pages 45 through 45.8.