Skip Navigation
michigan.gov
Blossoms... an essential element of Spring in Michigan! Raise your hand if you want to change your future - MI Healthier Tomorrow. See where $10 will take you at www.michigan.gov/recreationpassport! Pure Michigan Talent Connect Raise hope and foster dreams. Become a foster parent - call 888-335-3882
Michigan.gov Home
close print view
Printer Friendly Page
Email this Page
Share this Link on Facebook
Tweet this page on Twitter!

MDOT to begin lifting UP weight restrictions on April 26

Contact: James Lake, MDOT Office of Communications,
 LakeJ1@michigan.gov
906-786-1830, ext. 311

Agency: Transportation


April 25, 2013 -- Effective 8 a.m. Friday, April 26, weight restrictions will be lifted on all state trunkline highways from the southern Michigan border north to and including US-2 to Iron Mountain in the Upper Peninsula. Frost restrictions are still in effect on M-185 on Mackinac Island. State trunkline highways typically carry I, M or US designations.

In the restricted areas, the following will apply:
- On routes designated as "all-season routes" (designated in green and gold on the MDOT Truck Operators Map), there will be no reduction in legal axle weights.
- On routes designated as "seasonal" (designated in solid or dashed red on the MDOT Truck Operators Map), there will be a posted weight reduction of 25 percent for rigid pavements and 35 percent for flexible pavements.

All extended permits will be valid for oversize-only loads in the weight-restricted area on the restricted routes. Single-trip permits will not be issued for any overweight loads or loads exceeding 14 feet in width, 11 axles and 150 feet in overall length, on the restricted routes.

For weight restriction information and updates, call 800-787-8960, or you can access this information on MDOT's Web site at www.michigan.gov/truckers, under "Restrictions." All-season routes are designated in green and gold on the MDOT Truck Operators Map, which is available online. You also may sign up to receive e-mail alerts.

Trucking companies located in New Jersey and Canada can obtain information by calling 517-373-6256.

Roadway Work Zone Safety - We're All In This Together.
Related Content
 •  M-35 reconstruction starts May 6 in Menominee
 •  MDOT to explore feasibility of transforming I-375 corridor in Detroit
 •  Public meeting scheduled for US-10 project at M-30 in Sanford
 •  Bridge improvements start Monday on Seaway Drive over Black Creek
 •  Thumb-area signal changes begin today
 •  International Bridge staff test fallen-worker retrieval system
 •  Completion of M-37 repaving in Hastings starts Monday
 •  MDOT to replace US-31 culvert at Tobeco Creek starting April 29
 •  Repaving starts Monday on M-60 and M-99 in Homer
 •  Open house set for 2014 project on M-37 in Hastings
 •  Adopt-A-Highway litter pickup begins April 27 for northern lower Michigan, Upper Peninsula
 •  I-194 bridge repairs in Battle Creek start Monday
 •  Eighth annual asset management conference set for May 8 in East Lansing
 •  Bridge improvements start Monday on Taft Road over US-31 in Spring Lake
 •  MDOT releases 2012 crash statistics for work zones
 •  MDOT's 2013 statewide construction map now available
 •  Southbound I-75 resurfacing in Oakland County begins Monday, April 22
 •  MDOT to resurface US-23 in Alpena and M-32 in Atlanta
 •  M-46 left-turn lane construction next week in Sandusky
 •  MDOT starts work on M-38 Firesteel River bridge
QR code




Copyright © 2001-2013 State of Michigan