A. NAME OF PERMIT OR APPROVAL:
Electrical Sign Specialty Contractor License
B. STATUTORY AUTHORITY:
Electrical Administrative Act, 1956 PA 217
C. APPLICABLE REGULATION:
Electrical Administrative Board General Rules
D. SUMMARY OF PERMIT/APPROVAL PROCESS:
1. Applicability (activities that require the
permit)
R 408.30818 Permits and certificates
Rule 818. Sections 80.19, 80.19.1, 80.19.2,
80.19.3, 80.19.4, 80.19.5, 80.19.6, 80.19.7, and 80.19.8 are added to the code
to read as follows:
80.19. Permits and certificates. A person shall not equip a building with
electrical conductors or equipment or make an alteration of, change in, or
addition to, electrical conductors or equipment without receiving a written
permit to do the work described.
(3) To obtain a permit for an electrical sign or outline lighting, as
defined in section 1b(1) and (2) of 1956 PA 217, MCL 338.881b(1) and (2), an
applicant shall be 1 of the following:
(b) A holder of a sign specialty contractor license or the sign specialty
technician qualifying the sign specialty contractor when authorized by the sign
specialty contractor to secure a permit.
2.
Pre-Application Requirements
R 338.1003a Electrical contractor, fire alarm contractor, and sign specialty
contractor; license examination qualifications.
(5) To qualify for a sign specialty contractor examination, an applicant
shall provide either of the following:
(a) A current sign specialist license that is issued by the board or by a
municipality providing for licensing pursuant to the provisions of section 6 of
the act
(b) Proof, on a form provided by the department, of the full-time employment
of not less than 1 sign specialist who is licensed under the act and who
resides in this state and certification that the sign specialist shall be
actively in charge of, and responsible for, code compliance of all
installations, manufacturing, maintenance, connection, and repair of electric
signs, outline lighting, and related wiring
3.
Application Submission Requirements
R 338.1002a Applications; form; fee; grounds for denial of applications and
for forfeiture of fees
Rule 2a. (1) An applicant for examination shall
submit, to the department, an application on the form prepared and furnished by
the department.
(2) An application shall be accompanied by the fee prescribed in the act
(3) Each question on the application shall be answered in its entirety
(4) An incomplete application shall be returned to the applicant for
completion and then resubmitted to the department within 15 days after the date
of the department's request
(5) Failure to comply with the requirement of sub-rule (4) of this rule is
grounds for denial of the application
R 338.1007a Acceptance of application; admission card renewal
Rule 7a. (1) An application shall not be accepted,
and an admission card shall not be issued, for a scheduled examination, unless
the completed application has been on file in the Lansing office of the board for not less than
20 business days before the date of the next scheduled examination.
4.
Procedures and Time-Frame for Obtaining Permit or Approval
Electrical Sign Specialty Contractor 2010 Exam:
Dates / Location / Application Deadline Date
Wednesday Sept 22, 2010 / Okemos / August 25, 2010
Tuesday Nov 9, 2010 / Okemos / October 12, 2010
2011 dates have not yet been established.
5.
Operational Requirements
338.883 Licenses and certificates; orders and rules; fees; expiration and
renewal of license; reinstatement of void license; receipt of completed
application; issuance of license within certain period of time; report;
examinations for licensure and specialty licensure; annual report; "completed
application" defined.
Sec. 3.
(8) The license for an electrical contractor, fire alarm contractor, and
sign specialty contractor expires December 31 of every third year. The license
for an electrical contractor, fire alarm contractor, and sign specialty
contractor is renewable not later than on March 1 every third year upon
application and payment of ... $120.00 if paid after September 30, 2012 and
$200.00 if paid on or before September 30, 2012 by sign specialty contractors.
6.
Fees
The fee for the Electrical Sign Specialty Contractor License Exam = $100.00
Fire Alarm Contractor licenses are issued in 3-year cycles, everyone is on
the same 3-year cycle, therefore, the fee is prorated depending on which year
of the cycle we are in.
The fee for a Sign Specialty Contractor license is $200.00 for the full
3-years, $134.00 in the 2nd year of licensing, and $67.00 in the 3rd year.
7.
Appeal Process
8.
Public Input Opportunities
Comments and Complaints: bccinfo@michigan.gov
Bureau of Construction Codes Web-site: www.michigan.gov/bcc [1]
E. Contact Information:
Contact
Us
Creation/Revision Date:
October