Pre-manufactured Unit ApprovalThe Bureau of
Construction Codes, Plan Review Division of the Michigan Department of Licensing and Regulatory Affairs issues
Pre-manufactured Unit Approval
B. STATUTORY AUTHORITY: STILLE-DEROSSETT-HALE SINGLE STATE
CONSTRUCTION CODE ACT, 1972 PA 230 C. APPLICABLE REGULATION: Pre-manufactured Units, Part 11 D. SUMMARY OF PERMIT/APPROVAL PROCESS: 1.
Applicability (activities that require the permit)
The Michigan Pre-manufactured Units program is authorized by 1972 PA 230
Section 19, MCL 125.1519, which allows building components and buildings to be
certified for use in Michigan at a place of manufacture, other than the site of
final use. Units manufactured and labeled under this program are guaranteed certain
protections. The units must be accepted by all enforcing agencies. Local
enforcing agencies shall not conduct destructive inspections and manufacturing
violations are reviewed and addressed by the Bureau of Construction Codes. 2.
Pre-Application Requirements
Participating manufacturers and inspection agencies must be approved by the
Construction Code Commission. A Compliance Assurance Program must be submitted
and address specific matters affecting the construction of certified units. An
organizational chart demonstrating that there is not conflicts between code
compliance, production and sales. All aspects of materials, handling and
production must be detailed. Procedures for the security and handling of
certification labels, and record keeping must be in place. The manufacturer
must also have procedures for storage, shipping and installation of units. 3.
Application Submission Requirements
A manufacturer must submit an application with the appropriate fee and a
complete set of construction documents for each building component or building.
Each application is reviewed by the Bureau of Construction Codes, Plan Review
Division for compliance with the Michigan Construction Code. Application for Pre-manufactured Unit
4.
Procedures and Time-Frame for Obtaining Permit or Approval
When the documents are found to comply, a building system approval is issued
for the unit. The approval is in the form of a Building System Approval Report
(BSAR) and a set of construction documents stamped "Approved" with
the assigned BSAR number. 5.
Operational Requirements
An approved building system may not be manufactured contrary to the approved
drawings. If a modification of an approved model is desired, the manufacturer
must submit an application for a modification with revised construction
documents and the appropriate fee. In accordance with Rule R408.31141 the
modified unit may be manufactured only after approved, and a new BSAR is
issued. Application for Modification to Pre-manufactured
Unit 6.
Fees
One- and Two-Family Dwellings New Model (One Foundation System) = $300.00 Foundation Options = $100.00 Reverse Plan = $100.00 Various Options = $100.00 Additional Manufacturer(s) Submittal (Not Primary) = $100.00 Other than One- and Two-Family Dwellings New Model (One Foundation System) = $100 Minimum Additional Manufacturer(s) Submittal (Not Primary) = $100.00 7.
Appeal Process
8.
Public Input Opportunities
Comments and Complaints: bccinfo@michigan.gov Bureau of Construction Codes Web-site: www.michigan.gov/bcc [1]
Creation/Revision Date: October
4, 2010 | |||||
|