Public Water Supply Construction Permit (Type I)Agency: Environmental QualityThe Water Bureau (WB), within the Michigan Department of Environmental Quality (MDEQ), has responsibility for issuing construction permits for public water supply under the authority of Public Act 399 of 1976, as amended. A public water supply must submit plans and specifications and obtain a construction permit before commencing construction of a waterworks system or an alteration, addition or improvement to a system. Community public water supplies must submit plans prepared by a licensed professional engineer to the appropriate MDEQ district office. Permitting authority for non-community water supplies has been designated to local health departments in many areas of the state. Any business wishing to connect to an existing public water supply must obtain approval from the supplier before the connection is made. If the supplier needs to install water mains as part of a project, then a construction permit must be issued to the supplier of water from the MDEQ (this page summarizes that approval process). A. NAME OF PERMIT OR APPROVAL: Public Water Supply Construction Permit B. STATUTORY AUTHORITY: Safe Drinking Water Act, Public Act 399 of 1976, as amended C. APPLICABLE REGULATION: Supplying Water to the Public, Part 1 - Part 28, (R 325.11306) D. SUMMARY OF PERMIT/APPROVAL PROCESS: 1. Applicability (activities that require the permit)Modification, addition, installation, or alteration of any community or non-community water works system, which affects flow, capacity, system service area, source, treatment, or reliability 2. Pre-Application Requirements
3. Application Submission Requirements
4. Procedures and Time-Frame for Obtaining Permit or Approval
5. Operational Requirements
6. FeesNone specifically for construction permits. An annual water supply fee is assessed to all community and non-community public water systems based on type and population that supports all regulatory activities performed in the supervision of public water systems, including plan review and approval. 7. Appeal ProcessThere is no appeal process outlined in the Act or rules and appeals are uncommon because the Act and rules provide that plans be resubmitted until compliant with the appropriate standards. Appeals would be provided by law. 8. Public Input OpportunitiesThe decision makers for this approval process are the licensed District or Area Engineers in the WB district offices. In situations where there is no licensed engineer in the district office, a licensed professional engineer supervisor issues the permit. Many of these permits are for replacement of infrastructure or improvement of service rather than new development, and there is no formal public involvement in this review and approval process, which typically is completed within two weeks. The public input opportunities that exist are at the local level as appropriate (land use planning, zoning, hearings, etc.) when the plans are being developed. In addition, extensive public input processes are sometimes associated with the funding source for the project. For example, there is an extensive formal public input process as related to projects funded through Michigan's State Drinking Water Revolving Fund. F. ADMINISTERING AGENCY: Water Bureau, Field Operations, Michigan Department of Environmental Quality, P.O. Box 30273, Lansing, Michigan 48909-7773
Creation/Revision | |||||
|
Michigan.gov Home Copyright © 2001-2013 State of Michigan |