Construction Scheduling - Contract Time Determination (CTD) and Critical Path Method (CPM)
Contract Time Determination (CTD)
FHWA Guide for Construction Contract Time Determination Procedures
MDOT Guide for Contract Time Determination Procedures
MDOT Contract Time Determination Tool
Critical Path Method (CPM) Scheduling
Special Provision for Critical Path Method Schedule
Examples:
- Interim Baseline Schedule
- Road Reconstruction Baseline Schedule
- Bridge Reconstruction Baseline Schedule
- ITS Baseline Schedule
- Traffic Signal Modernization Baseline Schedule
- Baseline Narrative
Templates:
Guidance:
Contacts for CPM Scheduling: