Skip to main content

Online survey seeks public input on I-94 BL detour in Port Huron

2024-02-27T13:00:00Z 2024-05-04T03:59:00Z Online survey seeks public input on I-94 BL detour in Port Huron

The Michigan Department of Transportation (MDOT) invites the public to participate in an online survey as part of the I-94 Business Loop (BL) rebuilding project in downtown Port Huron. 

Where:
I-94 BL Survey

Accessibility:
Attendees who require mobility, visual, hearing, written, or other assistance for effective participation should contact Orlando Curry at 517-241-7462 or CurryO@Michigan.gov, preferably at least five business days prior to the scheduled meeting. Forms are located on the Title VI webpage. Requests made after this timeframe will be evaluated and honored to the extent possible.

Background:
MDOT is planning to rebuild I-94 BL from the Black River bridge to Glenwood Avenue beginning in spring 2026. As part of the project, MDOT expects to remove and replace all pavement, curb and gutter, traffic signals, and storm sewers, along with repairs to the bridge over the Black River and replacing some municipal utilities. 

Online
Location

Online

Event Date

Start: February 27, 2024 8:00 AM

End: May 03, 2024 11:59 PM

Contact Information
Caitlyn French

MDOT Bay Region Media Representative

The Michigan Department of Transportation (MDOT) invites the public to participate in an online survey as part of the I-94 Business Loop (BL) rebuilding project in downtown Port Huron. 

Where:
I-94 BL Survey

Accessibility:
Attendees who require mobility, visual, hearing, written, or other assistance for effective participation should contact Orlando Curry at 517-241-7462 or CurryO@Michigan.gov, preferably at least five business days prior to the scheduled meeting. Forms are located on the Title VI webpage. Requests made after this timeframe will be evaluated and honored to the extent possible.

Background:
MDOT is planning to rebuild I-94 BL from the Black River bridge to Glenwood Avenue beginning in spring 2026. As part of the project, MDOT expects to remove and replace all pavement, curb and gutter, traffic signals, and storm sewers, along with repairs to the bridge over the Black River and replacing some municipal utilities. 

Take the I-94 BL Survey