Skip to main content

US-131 BR road and bridge work starts Monday in Constantine

COUNTY:
St. Joseph

HIGHWAY:
US-131 Business Route (BR)

CLOSEST CITY:
Constantine

START DATE:
Monday, March 29, 2021

ESTIMATED END DATE:
Friday, Oct. 29, 2021

PROJECT:
The Michigan Department of Transportation (MDOT) will be repairing the US-131 BR bridge over the St. Joseph River. This $4.4 million investment includes bridge deck and superstructure repairs, water main and lighting replacements, riprap placement, and 2.2 miles of chip sealing from Spring Street to the southern juncture with US-131.

Visit Mi Drive for a project map and details.

SAFETY BENEFITS:
This project will improve bridge and road surfaces for motorists and extend the life of the bridge.

TRAFFIC RESTRICTIONS:
One lane will be open on the US-131 BR bridge with a temporary signal. There will be single-lane closures with traffic regulators during the chip sealing operations.