Skip to main content

M-43 Improvements Project - Ingham County

About the project

MDOT is performing resurfacing and drainage improvements on M-43. Work will include joint and crack repairs, intermittent curb and gutter replacement, spot drainage repairs, sidewalk ramp upgrades compliant with the Americans with Disabilities Act, pedestrian island installation, pavement marking upgrades, and traffic signal improvements. As part of this project, MDOT is partnering with Meridian Township and the Ingham County Drain Commission to relocate 200 feet of watermain and will be upgrading the Okemos and Grettenberger drains.


Traffic impacts

  • One lane open in each direction on M-43
  • Business access will be maintained throughout the project

Project details

Schedule
February 2022 - June 2023

Location
Ingham County

Benefits
Reduce frequency of flooding
Improve sidewalk accessibility

Cost
$14.7 million

Contact
Lansing TSC
517-335-3754