M-55 improvements project - Ogemaw County
About this project
MDOT will rebuild 1.4 miles of M-55/I-75 Business Loop (BL) from west of M-30 to east of Fairview Street in the city of West Branch. The project includes reconfiguring the four- and five-lane sections of the roadway to three lanes, installing new curbs, gutter, and sidewalk ramps, installing new watermain and storm sewer lines, building a new shared-use path, and installing new signs and traffic signals.
The project began in August 2023 with work on M-55 between Margaret Street and M-30, as well as detour route paving and underground utility replacement, before pausing for the winter.
Project details
Schedule
April - October 2024
Location
Ogemaw County
Benefits
Improve safety
Improve pedestrian crossings
Improve bicycle crossings
Reduce crashes
Simplify driving experience
Cost
$14.3 million
Contact
Kevin Schaedig, TSC Manager
Alpena TSC
989-356-2231
Traffic impacts
- Segments of the highway will be closed to traffic with directional and full detours.
- Expect lanes closures with traffic shifts or traveling in alternating directions with traffic regulators or temporary traffic signals.
- Access to local businesses and residences will be maintained throughout the project.
- Non-local truck through-traffic will be detoured via I-75 and I-75 BL for project duration.
Additional Information
This project includes a lane reconfiguration, or road diet, which can help calm traffic, provide left-turning vehicles their own lane, provide wider shoulders, and improve safety for pedestrians and bicyclists. Additionally, this work includes new signs, pavement markings, and traffic signals.