US-41 Rebuilding Project - Houghton

Start: Spring 2021    End: Fall 2022
 

What Is Being Done?
The Michigan Department of Transportation (MDOT) and the City of Houghton are investing $9 million to rebuild 1.1 miles of US-41 from McInnes Drive to Isle Royale Street in Houghton. The work will include converting the four-lane boulevard section to two lanes with designated turn lanes at major intersections and widening College Avenue to add a center left-turn lane.

How Traffic Will Be Affected
One-way detours are planned during each summer for this project.

The project will combine needed road work with storm sewer improvements, along with replacement of aging city sanitary sewer and water main. The project design will minimize or avoid impacts on the many historic features along the corridor.  

Safety Benefits
Vehicle operations will be improved and pedestrian safety increased by this work.

Additional Information
US-41 Houghton Video
US-41 Houghton Presentation
US-41 Houghton Rebuilding Plans

News
US-41 detour in Houghton expected to end Oct. 1