Interconnection Standards and Worker Safety

MI Power Grid Integrating Emerging Technologies Stamp

Notice: MI Power Grid meetings and all other MPSC workgroup meetings will be conducted via teleconference only until further notice. Please find remote access information for upcoming meetings on our calendar of events.

Interconnection standards are rules that spell out how projects owned by customers or developers connect to the utility system. These rules provide a standardized process and schedule so that interconnections can be accommodated in an orderly and timely manner. The rules also ensure that interconnections are done safely, in order to protect workers, utility and third-party owned equipment, and the public.


Actions to Date

  • On September 9, 2021 the Commission issued an order in Case No. U-20890 for providing an opportunity for public comment on the proposed MIXDG (M for Michigan, IX for Interconnection, and DG for the distributed generation portion of the rules) at a public hearing on October 20, 2021. Written comments may be submitted until 5:00 p.m. on November 1, 2021. More details are provided in the order
  • Commission Staff have prepared interconnection process flow charts to help describe some of the processes included in the proposed rules.
    Overview
    Application Process
    Simplified Track
    Non-Export Track
    Fast Track
    Fast Track Supplemental Review
    Study Track Individual Processing 
  • On September 9, 2021, a related order was issued in Case No. U-21117 to commence a collaborative for the development of electric utility interconnection procedures.
  •  


    Next Steps

    • The Public Hearing to receive public comments on the proposed rules has been set for Wednesday, October 20, 2021 at 9 am in the Lake Michigan Hearing Room at the Michigan Public Service Commission Offices.  The public hearing will also be held virtually via Microsoft Teams.   Comments on the proposed rules may be made at the hearing or by mail or electronic mail as further described in the Notice of Public Hearing.
    • Establish utility-specific procedures to implement interconnection rules

    Interconnection Stakeholder Sessions

    March 24, 2020 (TELECONFERENCE ONLY)

    Agenda | MPSC Staff Presentation | Meeting Recording

    August 28, 2019

    Agenda | Staff Presentation | Combined Draft Interconnection Distributed Generation and Legally Enforceable Obligation Rules

    July 16, 2019

    Agenda | Staff Presentation

    June 20, 2019

    Agenda | Interconnection Discussion Questions June 20 | CCR Comments to DTE | CCR Comments to CE | Staff Rules and Procedures Split | CE Discussion

    May 30, 2019

    Agenda | Queue Discussion Questions | Consumers Energy Queuing | Consumers Energy Redline | CCR Queue Comments | CCR Comments Section 5 | EIBC Comments | EIBC Redline | ELPC Redline | Nakafuji - The Future Grid | DTE Redline

    May 6, 2019

    Agenda | EIBC Reply Comments | EIBC Comments | CCR Reply to Consumers | CCR Comments | CCR Reply to DTE | DTE Presentation | DTE Comments | Consumers Energy Redline | Consumers Energy Presentation

    March 19, 2019

    Agenda | MI EIBC Comments Section 4 | MPSC Staff Presentation | Babak Enayati IEEE 1547 | Cypress Creek Letter | Cypress Creek Comments | Vote Solar Comments | I&M Redline | DTE Redline | DTE Presentation | ABATE Comments | Consumers Energy Redline | Consumers Energy Presentation

    February 19, 2019

    Agenda | MN DIP Workflow | CCR Comments to redline provided by Consumer and DTE | CCR Comments on Consumers Energy Comments | CCR Comments on DTE Comments | Vote Solar and ELPC Comments | Cypress Creek Comments | EIBC Comments | Solar Wind Comments | MEGA Comments | DTE Electric Comments | DTE Electric Presentation | Consumers Energy Comments | Consumers Energy Presentation | MI Biomass Comments and Redline

    January 10, 2019

    Agenda | MPSC Interconnection Docs | NREL Presentation | Cypress Creek Comments | Consumers Energy Comments | Consumers Energy Comment Presentation | MI EIBC Comments | MEGA Comments | Doug Houseman Comments | DTE General Comments | MECA Comments | DTE Comments

    December 7, 2018

    Agenda | MPSC Rulemaking | Stakeholder Process Minnesota Interconnection Overview


    Staff Leads

    Julie Baldwin
    Nick Evans


    Related MPSC Case(s)


    Other Documents

    Combined Draft Interconnection Distributed Generation and Legally Enforceable Obligation Rules

    MN Technical Interconnection and Interoperability Requirements

    NREL Pre-Application Report Evaluation

    NREL DER Interconnection Overview

    Cypress Creek Comments

    November 8, 2018 U-20344 Order Initiating Interconnection Rulemaking Process

    Electric Interconnection and Net Metering Standards

    FERC Small Generator Interconnection Procedures

    Minnesota Distributed Energy Resources Interconnection Process 2.3

    Minnesota Distributed Energy Resources Interconnection Agreement 2.3

    Category 1 Generator Interconnection Procedures

    Category 2 Generator Interconnection Procedures

    Interconnection and Parallel Operating Agreements for Projects up to 150kW