2023-05-09 |
May 9, 2023 WWW's draft Revised Tannery Interceptor System ResAP |
2023-05-22 |
ResAP |
2023-03-29 |
March 29, 2023 Public Responsiveness Summary for draft Tannery Interceptor System ResAP |
2023-05-02 |
Responsiveness Summary |
2023-01-10 |
January 10, 2023 WWW's draft Tannery Interceptor System ResAP Addendum Public Meeting Recording |
2023-12-09 |
Recording |
2022-12-01 |
December 1, 2022 WWW's draft Tannery Interceptor System ResAP Addendum |
2023-12-09 |
ResAP |
2022-10-27 |
October 27, 2022 Public Responsiveness Summary
|
2023-05-26 |
Responsiveness Summary |
2022-10-18 |
October 18, 2022 Letter from EGLE to WWW re: Notice of Approval with Conditions of the Work Plan
|
2023-05-26 |
Letter |
2022-06-02 |
June 2, 2022 Recording of Public Meeting regarding WWW's Work Plan - Final Remedy |
2023-05-26 |
Recording |
2022-06-02 |
June 2, 2022 Notice of Public Comment Period and Public Meeting regarding WWW's Work Plan - Final Remedy |
2022-06-02 |
Public Notice |
2022-05-26 |
May 26, 2022 WWW's draft Work Plan – Final Remedy for Cap Installation at the House Street Disposal Site (revised) Volume 1 |
2022-06-02 |
Work Plan (draft) |
2022-05-26 |
May 26, 2022 WWW's draft Work Plan – Final Remedy for Cap Installation at the House Street Disposal Site (revised) Volume 2 |
2022-06-02 |
Work Plan (draft) |
2021-10-28 |
October 28, 2021 Letter from EGLE to WWW re: Notice of Approval of Revised House St. Feasibility Study |
2021-11-18 |
Letter |
2021-10-07 |
October 28, 2021 Letter from EGLE to WWW re: Approval with Conditions of GSI Investigation Summary and Work Plan |
2021-11-18 |
Letter |
2021-08-06 |
August 6, 2021 EGLE Responsiveness Summary Document for the GSI Investigation Summary and Work Plan Public Comment Period |
2021-11-22 |
Responsiveness Summary |
2021-06-15 |
June 15, 2021 Letter from EGLE to WWW re: Disapproval of House Street Feasibility Study |
2021-06-18 |
Letter |
2021-06-11 |
June 11, 2021 Draft House Street Feasibility Study Public Comment Responsiveness Summary Document |
2021-06-18 |
Responsiveness Summary |
2021-04-26 |
April 26, 2021 Groundwater-Surface Water Interface (GSI) Investigation Summary and Work Plan |
2021-05-14 |
Work Plan |
2021-03-31 |
March 31, 2021 Draft House Street Feasibility Study Public Meeting Recording |
N/A |
Recording |
2021-03-31 |
March 31, 2021 Draft House Street Feasibility Study Public Meeting Presentation |
N/A |
Presentation |
2021-02-19 |
February 19, 2021 House Street Feasibility Study - Remedial Options (draft) |
2021-02-24 |
Report (draft) |
02/19/21 |
Tannery Interceptor System Response Activity Plan (draft) |
02/23/21 |
|
12/31/20 |
Final Perimeter Groundwater Monitoring Response Activity Plan |
02/02/21 |
ResAP
|
12/18/20 |
Final Area 19 Response Activity Plan NOTE: document is 425 pages |
02/03/21 |
ResAP |
12/11/20 |
Areas 11 & 12 Response Activity Plan NOTE: document is 446 pages |
12/28/20 |
ResAP |
12/04/20 |
Area 6 Response Activity Plan NOTE: document is 462 pages |
12/23/20 |
ResAP
|
12/04/20 |
Area 5 Response Activity Plan NOTE: document is 454 pages |
12/23/20 |
ResAP
|
11/13/20 |
Letter from EGLE Hendershott to WWW Latchana re Resolution of Disputes to Area 5, Area 6, and Area 11 & 12 ResAP |
11/23/20 |
|
11/13/20 |
Letter from EGLE Hendershott to WWW Latchana re: Notice of Approval with Conditions Perimeter Monitoring Response Activity Plan
|
11/23/20 |
|
11/10/20 |
Summary of Public Comments on Perimeter Monitoring Response Activity Plans
|
11/12/20 |
|
11/02/20 |
Email from R&W Nelson to EGLE Vorce re Notice of Dispute Area 11-12 Response Activity Plan |
11/12/20 |
|
11/02/20 |
Email from R&W Nelson to EGLE Vorce re Consent Decree 2020 Third Quarter Report |
11/12/20 |
|
10/30/20 |
Letter from EGLE Hendershott to WWW Latchana re: Notice of Approval with Conditions of Area 19 Response Activity Plan |
11/12/20 |
|
10/22/20 |
Letter from EGLE Hendershott to WWW Latchana re: Notice of Approval with Conditions of Areas 11-12 ResAP |
11/12/20 |
|
10/19/20 |
Email from R&W Powers to EGLE Vorce re: Notice of Dispute Area 5 ResAP |
11/12/20 |
|
10/19/20 |
Email from R&W Powers to EGLE Vorce re: Notice of Dispute Area 6 ResAP |
11/12/20 |
|
10/09/20 |
Letter from EGLE Hendershott to WWW Latchana re: Notice of Approval with Conditions of the Area 6 ResAP |
10/20/20 |
|
10/09/20 |
Letter from EGLE Hendershott to WWW Latchana re: Notice of Approval with Conditions of the Area 5 ResAP
|
10/20/20
|
|
09/30/20 |
Residential Well Resampling Response Activity Plan - North Kent Study Area |
10/20/20 |
|
09/30/20 |
Summary of Public Comments on Area 5, 6, 11, 12, and 19 Response Activity Plans |
10/20/20 |
|
09/23/20 |
Groundwater-Surface Water Interface (GSI) Response Activity Plan - North Kent Study Area |
10/20/20 |
|
09/16/20 |
Alternate Water Supply Management Plan Point-of-Entry Treatment Systems |
10/20/20 |
|
09/02/20 |
Letter from EGLE Hendershott to WWW Latchana re Notice of Approval with Conditions of Res Well |
09/04/20 |
|
09/02/20 |
Letter from EGLE Hendershott to WWW Latchana re Resolution of Disputes re Filter O&M ResAP |
09/04/20 |
|
09/02/20 |
Letter from EGLE Hendershott to WWW Latchana re Resolution of Disputes re GSI ResAP |
09/04/20 |
|
08/31/20 |
EGLE Responsiveness Summary Document for the Residential Well Resampling Response Activity Plan Public Comment Period
|
09/04/20 |
|
08/18/20 |
Wolverine's Draft Area 5, Area 6, Area 11 & 12, and Area 19 Groundwater Investigation Response Activity Plan Presentation |
N/A |
|
08/13/20 |
Email from GZA Powers to EGLE Vorce re: Notice Under Section 18.5(C) - Filter O&M ResAP Conditions |
09/04/20 |
|
08/13/20 |
Email from GZA Powers to EGLE Vorce re: Notice Under Section 18.5(c) - GSI ResAP Conditions |
09/04/20 |
|
08/03/20 |
Letter from EGLE Hendershott to WWW Latchana re Notice of Approval with Conditions of FOM ResAP |
08/05/20 |
|
08/03/20 |
Letter from EGLE Hendershott to WWW Latchana re Notice of Approval with Conditions of GSI ResAP |
08/05/20 |
|
07/31/20 |
Email from R&W Nelson to EGLE Vorce re Consent Decree 2020 Second Quarter Report |
08/07/20 |
|
07/24/20 |
EGLE Responsiveness Summary Document for the Filter O&M Response Activity Plan Public Comment Period
|
08/05/20 |
|
07/24/20 |
EGLE Responsiveness Summary Document for the Filter O&M Response Activity Plan Public Comment Period
|
08/05/20 |
|
06/23/20 |
Wolverine's Draft Residential Well Resampling Response Activity Plan Public Meeting |
N/A |
Recording |
06/23/20 |
Wolverine's Draft Residential Well Resampling Response Activity Plan Presentation |
N/A |
|
05/27/20 |
Wolverine's Draft Groundwater-Surface Water (GSI) Interface Response Activity Plan Presentation
|
N/A |
|
05/26/20 |
Wolverine's Draft Filter Operation and Maintenance (O&M) Response Activity Plan Presentation |
N/A |
|
05/14/20 |
Memo from GZA Nelson to USEPA Kimble re: Wolverine World Wide Former Tannery Restoration |
06/05/20 |
|
04/30/20 |
R&W Nelson/Powers/Westra to EGLE Vorce re: 2020 First Quarter Progress Report |
05/21/20 |
|
03/27/20 |
Groundwater Surface Water Interface (GSI) Response Activity Plan Public Meeting |
N/A |
Recording |
03/26/20 |
Filter Operation & Maintenance Response Activity Plan Public Meeting |
N/A |
Recording |
03/20/20 |
Tannery Interceptor System Conceptual Design |
04/13/20 |
|
03/02/20 |
Memo from R&W Powers to EGLE Hendershott re House St Disposal Area Monthly Progress Report |
04/06/20 |
|
03/02/20 |
Memo from R&W Nelson to EGLE Hendershott re Former Tannery Monthly Progress Report |
04/06/20 |
|
03/02/20 |
Memo from R&W Nelson to EGLE Hendershott re WolvenJewell RI - Monthly Progress Report |
04/06/20 |
|
02/03/20 |
Consent Decree
|
N/A |
|
01/06/20 |
Memo from R&W Powers to EGLE Hendershott re WWW House St Disposal Area Monthly Progress Report |
01/22/20 |
|
01/06/20 |
Memo from R&W Nelson to EGLE Hendershott re WWW Wolven/Jewell RI Monthly Progress Report |
01/22/20 |
|
01/06/20 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
01/22/20 |
|
12/02/19 |
Memo from R&W Powers to EGLE Hendershott re WWW House Street Disposal Area Monthly Progress Report |
01/22/20 |
|
12/02/19 |
Memo from R&W Nelson to EGLE Hendershott re WolvenJewell RI - Monthly Progress Report |
01/22/20 |
|
12/02/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
01/22/20 |
|
11/06/19 |
Memo from R&W Powers to EGLE Hendershott re WWW House Street Disposal Area Progress Report |
12/03/19 |
|
11/04/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW WolvenJewell RI Monthly Progress Report |
12/03/19 |
|
10/31/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
12/03/19 |
|
09/30/19 |
Memo from R&W Powers to EGLE Hendershott re WWW House Street Disposal Area Progress Report |
12/03/19 |
|
09/30/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
12/03/19 |
|
09/30/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW WolvenJewell RI Monthly Progress Report |
12/03/19 |
|
09/03/19 |
Memo from R&W Powers to EGLE Hendershott re WWW House Street Disposal Area Monthly Progress Report |
10/29/19 |
|
09/03/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW WolvenJewell RI - Monthly Progress Report |
10/29/19 |
|
09/03/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
10/29/19 |
|
08/01/19 |
EGLE Geologic Review - Primary House Street Plume Evaluation - August 2019 |
08/28/20 |
|
07/31/19 |
Memo from Rose & Westra Nelson to EGLE Hendershott re Former Tannery Monthly Progress Report |
08/26/19 |
|
07/31/19 |
Memo from Rose & Westra Powers to EGLE Hendershott re House Street Disposal Area Monthly Progress Report |
08/26/19 |
|
07/31/19 |
Memo from Rose & Westra Nelson to EGLE Hendershott re WolvenJewell RI Monthly Progress Report |
08/26/19 |
|
07/17/19 |
Email from Rose & Westra M. Westra to EGLE Hendershott re Wolverine World Wide Response to June 4, 2019 Letter |
08/26/19 |
|
07/08/19 |
Memo from Rose & Westra Powers to EGLE Hendershott re: WWW Source Investigation/Waste Removal Monthly Progress Report |
08/26/19 |
|
07/08/19 |
Memo from R&W Powers to EGLE Hendershott re House Street Disposal Area Monthly Progress Report |
08/26/19 |
|
07/01/19 |
Memo from Rose & Westra Nelson to EGLE Hendershott re Former Tannery Monthly Progress Report |
08/26/19 |
|
07/01/19 |
Memo from Rose & Westra Nelson to EGLE Hendershott re: Wolven/Jewell RI Monthly Progress Report |
08/26/19 |
|
06/04/19 |
Email to WWW Latchana from EGLE Hendershott re WWW PFAS Drinking Water Well Resampling Summary and Request |
06/05/19 |
|
05/31/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
07/08/19 |
|
05/31/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW House Street Disposal Area Monthly Progress Report |
07/08/19 |
|
05/31/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Source Investigation Waste Removal Activities Monthly Progress Report |
07/08/19 |
|
05/31/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW WolvenJewell RI - Monthly Progress Report |
07/08/19 |
|
05/21/19 |
Report Workplan (RI) - GZA Implementation of 2018 Work Plan Summary Report - House Street. For additional volumes, see the EPA's Wolverine World Wide Tannery site update webpage.
|
06/07/19 |
|
04/30/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW WolvenJewell RI - Monthly Progress Report |
06/07/19 |
|
04/30/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Source Investigation Waste Removal Activities Monthly Progress Report |
06/07/19 |
|
04/30/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW House Street Disposal Area Monthly Progress Report |
06/07/19 |
|
04/30/19 |
Memo from R&W Nelson to EGLE Hendershott re WWW Former Tannery Monthly Progress Report |
06/07/19 |
|
04/29/19 |
Email to WWW Latchana from USEPA Kimble re Wolverine Tannery and House Street Disposal State Required CERCLA Actions |
05/03/19 |
|
04/02/19 |
DEQ (now EGLE) Geologic Review - Primary House Street Plume Evaluation - March 2019
|
05/29/19 |
|
04/01/19 |
Memo to DEQ Hendershott from RW Powers re WWW Source Investigation Waste Removal Activities Monthly Progress Report |
04/30/19 |
|
04/01/19 |
Memo to DEQ Hendershott from RW Powers re WWW House Street Disposal Area Monthly Progress Report |
4/30/19 |
|
04/01/19 |
Memo to DEQ Hendershott from RW Nelson re WWW Former Tannery Monthly Progress Report |
4/30/19 |
|
04/01/19 |
Memo to DEQ Hendershott from RW Nelson re WWW Wolven Jewell RI - Monthly Progress Report |
4/30/19 |
|
03/26/19 |
March 26, 2019 Town Hall Meeting Video
|
N/A |
Recording |
03/21/19 |
Email to DEQ Hendershott from RW Westra & Powers re House Street Residential Well Resampling Survey |
4/30/19 |
|
03/08/19 |
Email to DEQ Hendershott from Rose & Westra Nelson, Powers, Westra re: WWW Response to WWW PFAS Notice of Public Expenditure |
3/26/19 |
|
03/08/19 |
Letter to DEQ Hendershott from WNJ Byl re: Response to February 28, 2019 Letter |
3/26/19 |
|
02/28/19 |
Memo to DEQ Hendershott from RW Nelson re: Wolverine World Wide Former Tannery Monthly Progress Report |
4/30/19 |
|
02/28/19 |
Memo to DEQ Hendershott from RW Nelson re Wolverine World Wide Wolven Jewell RI - Monthly Progress Report |
4/30/19 |
|
02/28/19 |
Letter to WWW Latchana from DEQ Hendershott re: WWW PFAS Response - Notice of Public Expenditure |
3/26/19 |
|
02/27/19 |
Memo to DEQ Hendershott from RW Powers re Wolverine House Street Disposal Area Monthly Progress Report |
4/30/19 |
|
02/15/19 |
DEQ (now EGLE) Geologic Review - Primary Wolven-Jewell Plume Evaluation - December 2018 |
05/29/19 |
|
02/15/19 |
DEQ (now EGLE) Geologic Review - Primary Wolven-Jewell Plume Evaluation - December 2018 |
05/29/19 |
|
01/31/19 |
Memo to DEQ Hendershott from RW Powers re: House Street Disposal Area Monthly Progress Report |
3/6/19 |
|
01/31/19 |
Memo to DEQ Hendershott from RW Nelson re Former Tannery Monthly Progress Report |
3/6/19 |
|
01/31/19 |
Email to DEQ Hendershott from RW Powers and Westra re: Source Investigation/Waste Removal Activities Monthly Progress Report |
3/6/19 |
|
01/31/19 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Wolven/Jewell RI - Monthly Progress Report |
3/6/19 |
|
01/27/19 |
Memo to DEQ Hendershott from RW Powers & Westra re WWW Source Investigation Waste Removal Activities Monthly Progress Report |
4/30/19 |
|
01/23/19 |
Memo to DEQ Hendershott from RW Westra re: Former Tannery Interim Groundwater Response - Supplemental Information |
3/6/19 |
|
01/22/19 |
Email to DEQ Hendershott from RW Powers and Westra re: MDOT Parcel Investigation Summary Report |
3/6/19 |
|
01/18/19 |
Email to DEQ Hendershott from Rose & Westra Nelson re: Wolven/Jewell Area - Select Residential Well Resampling |
1/25/19 |
|
01/18/19 |
Email to DEQ Hendershott from Warner Norcross & Judd and Byl re: Response to November 21 Letter Regarding Resampling Request |
1/25/19 |
|
01/11/19 |
Email to EPA Kimble from RW Nelson, Westra, and Lamb re: Implementation of 2018 Work Plan - Summary Report WWW Tannery 2017-2018 Work (Volume I of 412). For additional volumes, see the EPA's Wolverine World Wide Tannery site update webpage. |
3/29/19 |
|
01/04/19 |
Memo to DEQ Hendershott from RW Nelson re: Former Tannery Monthly Progress Report |
3/6/19 |
|
01/04/19 |
Email to DEQ Hendershott from RW Powers and Westra re: Source Investigation/Waste Removal Activities Monthly Progress Report |
3/6/19 |
|
01/04/19 |
Memo to DEQ Hendershott from RW Powers re: House Street Disposal Area Monthly Progress Report |
3/6/19 |
|
01/04/19 |
Email to DEQ Hendershott from Rose & Westra Nelson re: Wolven/Jewell RI - Monthly Progress Report |
3/6/19 |
|
12/07/18 |
DEQ (now EGLE) Geologic Review - Northeast Wolven Study Area Plume Evaluation - November 2018 |
05/29/19 |
|
12/04/18 |
DEQ (now EGLE) Geologic Review - SE Wolven and N Childsdale Study Area Plume Evaluation - Nov 2018 |
05/29/19 |
|
11/30/18 |
Memo to DEQ Hendershott from Rose & Westra Powers re: House Street Disposal Area Monthly Progress Report |
1/15/19 |
|
11/30/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: Source Investigation/Waste Removal Activities Monthly Progress Report |
1/15/19 |
|
11/30/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Former Tannery Monthly Progress Report |
1/15/19 |
|
11/30/18 |
Email to DEQ Hendershott from Rose & Westra Nelson and Westra re: Lamoreaux Farms Source Investigation Summary Report |
1/15/19 |
|
11/27/18 |
North Kent County PFAS Exposure Assessment |
N/A |
|
11/27/18 |
North Kent Exposure Assessment Meeting
|
N/A |
Recording |
11/21/18 |
Email to WWW Latchana from DEQ Hendershott re: Drinking Water Well Resampling Request with attached Resample Priority map |
11/27/18 |
|
11/02/18 |
Memo to DEQ Hendershott from Rose & Westra Powers re: House Street Disposal Area Monthly Progress Report |
11/27/18 |
|
11/01/18 |
EPA/DEQ Investigations Underway at Wolverine World Wide Factsheet |
N/A |
|
10/31/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Former Tannery - Monthly Progress Report |
11/27/18 |
|
10/31/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Wolven/Jewell RI - Monthly Progress Report |
11/27/18 |
|
10/30/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: Source Investigation/Waste Removal Activities Monthly Progress Report |
11/27/18 |
|
10/16/18 |
Email to DEQ Hendershott from Rose & Westra Powers and Westra re: House Street Area - Select Residential Resampling |
11/27/18 |
|
10/03/18 |
Email to DEQ Hendershott from Rose & Westra Nelson and Powers re: Revised MDOT Parcel Soil Investigation Work Plan |
10/24/18 |
|
10/01/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: Source Investigation/Waste Removal Activities Monthly Progress Report |
10/24/18 |
|
10/01/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: House Street CSM and On-Site Progress Report |
10/24/18 |
|
09/30/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Wolven/Jewell RI Monthly Progress Report |
10/24/18 |
|
09/30/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Former Tannery Monthly Progress Report |
10/2/18 |
|
08/31/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Tannery DEQ Monthly Update |
9/28/18 |
|
08/31/18 |
Email to DEQ Hendershott from RW Powers and Nelson re: MDOT Property 2018 Soil Investigation Report |
9/17/18 |
|
08/31/18 |
Memo to DEQ Hendersott from Rose & Westra Powers re: House Street Disposal Area Monthly Progress Report |
9/28/18 |
|
08/30/18 |
Email to DEQ Hendershott from RW Westra and Powers re: Source Investigation/Waste Removal Activities Monthly Progress Report |
10/9/18 |
|
08/10/18 |
Memo to DEQ Hendershott from RW Nelson re: Wolven/Jewell RI Progress Report |
9/17/18 |
|
08/09/18 |
Email to WWW Latchana from DEQ Hendershott re: PFAS Investigation Resonse Alternate Water Supply Management |
8/21/18 |
|
08/07/18 |
Email to WWW Latchana from DEQ Hendershott re: Response to the Off-Site Groundwater Investigation Scope of Work dated June 29, 2018 |
8/21/18 |
|
08/07/18 |
Email to WWW Latchana from DEQ Wierzbicki and Hendershott re: May 4, 2018 Draft Quality Assurance Project Plan (QAPP) |
8/21/18 |
|
08/03/18 |
Email to DEQ Hendershott from Rose & Westra Nelson and Westra re: Revised Lamoreaux Farms Soil Investigation Work Plan |
9/14/18 |
|
08/02/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: House Street Monthly Progress Report |
9/28/18 |
|
08/02/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: Source Investigation/Waste Removal Activities Monthly Progress Report |
8/14/18 |
|
07/31/18 |
Memo to DEQ Hendershott from Rose & Westra Nelson re: Tannery DEQ Monthly Update |
8/28/18 |
|
06/29/18 |
Letter to DEQ Hendershott from Rose & Westra Westra and Nelson re: Off-Site Groundwater Investigation Scope of Work |
8/21/18 |
|
06/29/18 |
Letter to DEQ Hendershott from Rose & Westra Westra and Powers re: House Street CSM Progress Report |
7/24/18 |
|
06/29/18 |
Letter to DEQ Hendershott from Rose & Westra Westra and Powers re: House Street source Investigation Work plan (SIWP) Supplemental Information |
7/24/18 |
|
06/28/18 |
Memo to DEQ Hendershott from RW Powers re: Municipal Water Connections and Private Wells Evaluation - Follow Up |
7/24/18 |
|
06/18/18 |
Email to EPA Kimble from Rose & Westra Wieck Lamb Westra and Nelson re: Extent of Contamination Study Removal Work Plan |
7/3/18 |
|
06/18/18 |
Letter to DEQ Hendershott from Rose & Westra Westra and Nelson re: Source Investigation Tasks Summary |
7/3/18 |
|
06/11/18 |
Email to DEQ Hendershott from Rose & Westra Powers and Nelson re: MDOT Property Soil Verification Sampling and Additional Investigation Work Plan |
8/14/18 |
|
06/08/18 |
Letter to DEQ Hendershott from Rose & Westra Westra and Powers re: Source Investigation Work Plan |
6/15/18 |
|
05/31/18 |
Letter to Wolverine World Wide Latchana from DEQ Hendershott re: Response to "Draft Removal Work Plan for the Tannery ... Approval with Modifications dated April 24, 2018" |
6/4/18 |
|
05/31/18 |
Letter to Wolverine World Wide Latchana from DEQ Hendershott re: Response to "Draft Removal Work Plan for House Street Disposal Area ... Approval with Significant Modifications dated April 19, 2018" |
6/4/18 |
|
05/29/18 |
Email to USEPA Kimble from Rose & Westra Cai, Osborne, and Westra dated May 29, 2018 re: Extent of Contamination Study Removal Work Plan, House Street Disposal Area, Plainfield Township, Kent County, Michigan |
6/15/18 |
|
05/29/18 |
Letter to Wolverine World Wide Latchana from DEQ Hendershott re: April 17, 2018, Technical Meeting Summary and Action Items |
5/31/18 |
|
05/29/18 |
Letter to Wolverine World Wide Latchana from DEQ Hendershott re: Municipal Water Connections and Private Wells Evaluation |
5/31/18 |
|
05/04/18 |
Email to DEQ Hendershott from Rose & Westra Westra and Powers re: Wolverine World Wide, Incl - House Street CSM Update and Status Report |
5/22/18 |
|
04/18/18 |
Email to DEQ Hendershott, Wierzbicki, Vorce from GZA Powers re: Municipal Water Connections and Private Wells Evaluation |
7/24/18 |
|
04/04/18 |
Letter to Wolverine World Wide Latchana from DEQ Hendershott re: House Street PFAs Investigation - Conceptual Site Model Update and Status Report |
5/22/18 |
|
02/09/18 |
Letter to DEQ Hendershott from Rose & Westra Cai and Westra re: Conceptual Site Model Update and Status Report; Former House Street Site, 1885 House Street, Plainfield Township, Michigan |
5/22/18 |
|
01/04/18 |
Memo to DEQ Hendershott from Rose & Westra Powers re: POET Post-Installation Performance Monitoring |
1/10/18 |
|
12/28/17 |
Email to DEQ Hendershott from Rose & Westra, Powers & Westra, re: WWW, Alleged Disposal Areas, Various Locations, Kent County, MI |
1/5/18 |
|
12/22/17 |
Email to DEQ Hendershott from Rose & Westra, Powers & Westra, re: WWW, Alleged Disposal Areas, Various Locations, Kent County, MI |
1/5/18 |
|
12/21/17 |
Email to DEQ Hendershott from Rose & Westra re: WWW, Rogue River Sampling Area Proposed Scope of Work |
1/5/18 |
|
12/15/17 |
Letter to WWW Latchana from DEQ Leeming re: PFAS Response Identification and Investigation of Rogue River Area |
12/21/17 |
|
12/13/17 |
Email to DEQ Hendershott from Rose & Westra re: WWW, Source Area Investigation Near Former Gravel Pit, Wolven Avenue Area, Algoma Township, Kent County, Michigan |
1/5/18 |
|
12/11/17 |
Letter to DEQ Hendershott from Rose & Westra re: Susceptibility of Wells Along the Rogue River to Impacts from the Former Wolverine Tanner, 123 Main Street, Rockford, Michigan |
1/10/18 |
|
12/08/17 |
Email to DEQ Hendershott from Rose & Westra re: WWW, Alleged Disposal Areas, Various Locations, Kent County, Michigan |
1/5/18 |
|
12/04/17 |
Letter to WWW Latchana from DEQ Leeming re: WWW, PFAS Response Identification and Investigation of Wolven Street Area, Kent County, Michigan |
12/5/17 |
|
11/29/17 |
November 29, 2017 Town Hall Meeting
|
N/A |
Recording |
11/29/17 |
DEQ House Street Presentation |
N/A |
Presentation |
11/27/17 |
Letter to DEQ from Rose & Westra re: WWW Conceptual Site Model and Remedial Investigation Work Plan for Former House Street Disposal Area (redacted) |
2017-11-29 |
Letter |
11/27/17 |
Letter to DEQ Hendershott from Rose & Westra re WWW Work Plan Site Investigation - PFAS Response, Former Wolverine Tanner, 123 Main Street, Rockford |
2017-11-29 |
Letter |
11/20/17 |
Letter to DEQ Hendershott from Rose & Westra re: WWW Alleged Disposal Areas, Various Locations (redacted) |
2017-11-29 |
Letter |
11/14/17 |
MDEQ using YUMA tablet technology to document investigation |
N/A |
Recording |
11/14/17 |
MDEQ expert inspects potential contamination site and explains to resident
|
N/A |
Recording |
11/13/17 |
Email Letter to DEQ Hendershott from Rose & Westra re: WWW Jewell Avenue and 10 Mile Road Area Additional Proposed Scope of Work (redacted) |
2017-11-29 |
|
11/09/17 |
Letter to WWW Dave Latchana from DEQ Leeming re: WWW PFAS Response Identification and Investigation of Reported Disposal Areas, Various Locations (redacted) |
2017-11-29 |
|
11/08/17 |
Letter to DEQ Hendershott from Rose & Westra re WWW Former Tannery, 123 North Main Street, Rockford |
2017-11-29 |
|
11/08/17 |
Letter to DEQ Hendershott from Rose & Westra re WWW Wolven Avenue Area Residential Well Sampling Proposed Scope of Work |
2017-11-29 |
|
11/06/17 |
Letter to DEQ Hendershott from Rose & Westra re WWW Jewell Avenue and 10 Mile Road Area Proposed Scope of Work (redacted) |
2017-11-29 |
|
11/02/17 |
Letter to Wolverine World Wide Latchana from DEQ Leeming re: Wolverine PFAS Response, House Street, Plainfield Township, and Wolverine Tanner, 123 Main Street, Rockford |
11/22/17 |
|
10/20/17 |
Email Letter to KWC Weber from Rose & Westra re WWW Point of Entry Whole House Treatment System - Private Residential Wells, Belmont, MI |
2017-11-29 |
|
09/22/17 |
Letter to Homeowners from Wolverine Worldwide |
N/A |
|
09/12/17 |
DHHS House Street Public Meeting Presentation |
N/A |
Presentation |
09/12/17 |
DEQ House Street Presentation |
N/A |
Presentation |
08/11/17 |
Groundwater Monitoring Well Conceptual Work Plan |
N/A |
|