Alger Correctional Facility

Project Information

Department Name Department of Corrections
Facility Name Alger Correctional Facility
Project Name HVAC Improvements
Completion Date March 2020
Project Cost $1.26 million
Savings (in $) $4,100 annually
Payback Period/ROI Incidental savings
Project Summary

This project was designed to upgrade heating, ventilation, and air condititiong through digital controls and variable frequency drives on pumps and air dampers. Heating equipment was improved with variable frequency drives and pumps, along with digital control valves to improve delivery of heating and cooling to the occupants.

Additional Information