Alger Correctional Facility
Alger Correctional Facility
Project Information
Department Name | Department of Corrections |
---|---|
Facility Name | Alger Correctional Facility |
Project Name | HVAC Improvements |
Completion Date | March 2020 |
Project Cost | $1.26 million |
Savings (in $) | $4,100 annually |
Payback Period/ROI | Incidental savings |
Project Summary |
This project was designed to upgrade heating, ventilation, and air condititiong through digital controls and variable frequency drives on pumps and air dampers. Heating equipment was improved with variable frequency drives and pumps, along with digital control valves to improve delivery of heating and cooling to the occupants. |