Skip Navigation
Michigan Department of Environmental QualityMichigan.gov, Official Web Site for the State of Michigan
Michigan.gov Home
  • DEQ
  • Online Services
  • Permits
  • Programs
  • Contacts
  • Site Map
  • Locations
  • close print view

    OOGM Forms for Oil & Gas Permits and Operations

    Contact: Office of Oil, Gas, and Minerals 517-241-1515

    Office of Oil, Gas, and Minerals 

    Download all   Oil and Gas forms  in zipped file (approx 950 Kb).  
    Most of the forms on this page are in Microsoft Word format, a few are in Acrobat.  

    Records should be submitted by mail to:
     Michigan Department of Environmental Quality
    Office of Oil, Gas, and Minerals
    P.O. Box 30256
    Lansing, Michigan 48909-7756
    or by email to:
    DEQ-GeologicalRecords@michigan.gov

     

     


    Items on this page: 
    Forms used for Permits and Bonding  
    Forms used for Drilling and Completion 
    Forms used for Production and Operating   
     
     

    Abbreviations used below in "Where Filed" and "Unit": 
    PMGU= Petroleum and Mining Geology Unit - Contact 517-241-1507
    PBU = Permits and Bonding Unit - Contact 517-241-1528
    CU = Compliance and Enforcement Unit - Contact 517-335-6766
    TSS = Technical Services Section
      - Contact 517-241-1515

    DO= District Office click on link to see district offices
    MPSC= Michigan Public Service Commission - Contact 517-241-6180

     

    Forms Used for Permits and Bonding  

    FORM NAME  

    FORM NUMBER  

    WHO  

    ORIGINATES  

    WHEN FILED  

    WHERE FILED  

    # of COPIES  

    *Application for Permit to Drill, Deepen, and Operate a Well
    Forms marked w/ * are attached as part of a complete application to drill  
    EQP 7200-1

    Permit Instructions:
    EQC 7200

    EQC72001 

    EQC 7200-2   

    Permit Applicant  Application  PBU  1 Original
    1 Copy
    * One of the following for permit fee: Check
    or
    Credit Card Transaction Authorization
    or
    Electronic Fund Transfer Debit Authorization
     
    issued by applicant


    EQP 7010
     


    EQP 7011 
     
    Permit Applicant  w/ Application for Permit to Drill  PBU  none required 
    * Survey Record of Well Location  EQP 7200-2   Permit Applicant  w/ Application for Permit to Drill  PBU 

    1 Original
    1 Copy

    * Wellhead Blowout Control System  EQP 7200-4   Permit Applicant  w/ Application for Permit to Drill  PBU 

    1 Original
    1 Copy

    * Injection Well Data & attachments  EQP 7200-14   Permit Applicant  w/ Application for Permit to Drill Injection Well  PBU 

    1 Original
    1 Copy

    * Soil Erosion & Sedimentation Control Plan  EQP 7200-18   Permit Applicant  w/ Application for Permit to Drill  PBU 

    1 Original
    1 Copy

    * Environmental Impact Assessment  EQP 7200-19   Permit Applicant  w/ Application for Permit to Drill  PBU 

    1 Original
    1 Copy

    * Antrim Project

    Environmental Impact Assessment 

    EQP 7200-21   Permit Applicant  w/ Application for Permit to Drill  PBU 

    1 Original
    1 Copy

    * Surface Owner Notification  No form. File as required by {R324.201(2)(d)}  Permit Applicant  w/ Application for Permit to Drill  PBU 

    1 Original
    1 Copy

    Bond for Conformance
    (use one of the below)
     
       Permit Applicant  If for a single well:

    w/ Application for Permit to Drill or Request for Transfer 

     

    Blanket bond documents on file w/ OGS do not need to copied for new application 

    PBU 

    0 

    1. Surety Bond   EQP 7200-3  
    2. Certificate of Deposit   CD 
    3. Letter of Credit  EQP 7298 single

    EQP 7299 blanket 

    4. Cashier's Check  check 
    5. Statement of Financial Responsibility  EQP 7200-17   
    Acceptance of CD as Performance Bond  EQP 7200-15(single) 

    EQP 7200-16(blanket)  

    Permit Applicant  w/ CD bond  PBU 

    0 

    Well Permittee Organization Report  EQP 7200-13  Permit Applicant  As requested by PB Unit: usually w/App or Request for Transfer  PBU 

    1 

    Request for Transfer of Permit  EQP 7200-7  Permittee  At change of owner or operator  PBU 

    3 

    Authorization for Expenditure EQP 7604  Petitioner in compulsory pooling hearing With petition as petition exhibit TSS

    Application for Rule 303 Spacing Exception EQP 7200-23  Permit Applicant When applying for an expanded voluntary pooled drilling unit

    TSS

    Section Chief

     

    0

    go to TOP of page 
    Forms Used for Drilling and Completion  
     

    FORM NAME  

    FORM NUMBER  

    WHO  

    ORIGINATES  

    WHEN FILED  

    WHERE FILED  

    # of COPIES WITH ORIGINAL  

    Record of Well Drilling or Deepening  EQP 7200-5  Permittee  Within 60 days of drilling completion  PMGU 

    3 

    Well Elevations  No form. File as required by
    {R324.418(a)(i)}
     
    Permittee  Within 60 days of drilling completion  PMGU 

    0 

    Electric or Radiation Logs  No form. File as required by
    {R324.419(1)}
     
    Permittee  30 days after running log(s)  PMGU 

    0 

    Survey of Directionally Drilled Well  No form. File as required by
    {R324.421}
     
    Permittee  30 days after drilling completion Note: a well may not be produced until survey is filed  PMGU 

    3 

    Water Well Record for Oil, Gas, or Mineral Well Operations  EQP 7200-10  Permittee  30 days after water well completion  PBU 

    2 

    Certification of Casing and Sealing of Surface Hole  EQP-7200-12  Permittee  30 days after drilling completion  PMGU 

    1 

    Mud Pit Plot  EQP 7200-9  Permittee  60 days after drilling completion  DO 

    1 

    Record of Well Completion  EQP 7130  Permittee  Within 60 days of well completion  PMGU 

    2 

    Core descriptions  No form. File record as required by {R324.418(c)}  Permittee  Within 60 days of drilling completion  PMGU 

    0 

    Application to Change Well Status  EQP 7200-6  Permittee  Before start of operation  DO 

    3 

    Application to Plug and Abandon  EQP 7200-6 (same form as above)  District  When requested by permittee or OGS Compliance Unit  Mailed to Permittee 

    3 

    Record of Well Plugging or Change of Well Status  EQP 7200-8  Permittee  60 days after Change/ Plugging  District 

    3 

    Water Well Plugging Record for Oil & Gas Operations  EQP 7200-20  Permittee  30 days after water well plugging  PBU 

    2 

    Assumption of Responsibility by Landowner  EQP 7240  Permittee  Prior to Bond Release  DO 

    2 

    Annual Certification for Blowout Preventers, Accumulators, Pumps and Secondary Systems  EQP 7200-11  Drilling Contractor  Annually or when BOP is modified  PBU 

    0 

       go to TOP of page  

    Forms Used for Production and Operating  

    FORM NAME   FORM NUMBER  

    WHO
    ORIGINATES
     
     

    WHEN FILED   WHERE FILED   #  of COPIES WITH ORIGINAL  
    Monthly Production Report  EQP 7101  Producer  Within 45 days after end of month of production  PMGU & MPSC 

    0 

    Annual Production Report  EQP7101A  Producer  By February 14 after the end of the year  PMGU & MPSC 

    0 

    Oil Gatherers Monthly Report  EQP 7102 or approved equivalent   Oil Purchaser /Transporter  Within 45 days after end of month of purchase or transport  PMGU 

    0 

    Monthly Production Report (Trenton Black River) EQP 7105  Producer Within 45 days after end of month of production PMGU & MPSC

    0

    Gas-Oil Ratio Test  EQP 7103  Producer  As requested by PG&P or District. Report due w/in 15 days of test  DO 

    0 

    Bottom Hole Pressure Test  EQP 7104  Producer  After completion and as requested  PMGU 

    0 

    Central Production Facilities Meter Readings Form A  EQP 7126A  Producer  Within 45 days after end of month of production  PMGU 

    0 

    Centralized Production Facilities Monthly Report Form B  EQP 7126B  Producer  Within 45 days after end of month of production  PMGU 

    0 

    Initial Production Report  EQP 7127  Producer  After completion  PMGU 

    0 

    Gas Gatherers Monthly Report  EQP 7129  Gas Purchaser/ Transporter  Within 45 days after end of month of production  PMGU 

    0 

    Annual Secondary &  Enhanced Recovery  Project Report  EQP 7142  Producer  Annually by March 1 of following year  PMGU 

    0 

    Report of Loss or Spill  EQP 7233  Permittee  w/in 10 calendar days. (Losses over 42 gallons report verbally w/in 8 hrs)  DO 

    0 

    Liquid and Gas Analysis  No form. File  as required by
    {R324.1118(4)}
     
    Producer  After completion & as requested  PMGU 

    0 

    Annular Pressure Test  EQP 7606  Operator  Before initial injection & at least once each 5 yr per R324.803 & 805  PMGU 

    0 

    Authorization to Inject  EQP 7608  PG&P Unit  When requested by operator  Operator 

    2 

    Injection Well Operating Report  EQP 7609  Operator  Monthly or Annually  PMGU 

    0 

    Surface Facility Location and Environmental Impact Assessment  EQP 7200-22  Permit Applicant  Prior to Construction of Surface Facility  DO 

    1 

    Gas Storage Operations Annual Well Fee Assessment Report  EQP 7141  Storage Operator  Annually by January 31  PMGU 

    1 

      go to TOP of page  

     

    Related Content
     •  Policy for Submitting Oil and Gas Records PDF icon
     •  Questions and answers about hydraulic fracturing in Michigan PDF icon
     •  Hydraulic Fracturing in Michigan
     •  Injection Well Data
     •  Drilling Unit Maps by County
     •  Michigan County Codes
     •  API Numbers Explained
     •  Permits Issued by Year
     •  Public Notices
     •  Hearings
     •  Scanned Digital Oil & Gas Records
     •  Oil and Gas Advisory Committee
     •  Links to Oil and Gas in Michigan
     •  Leasing State Lands
     •  Hydrogen Sulfide (H2S) - Q & A
    QR code

    Michigan.gov Home
  • DEQ
  • Online Services
  • Permits
  • Programs
  • Site Map
  • Contacts
  • Office of Regulatory Reinvention
  • Spending & Accountability

  • State Web Sites
  • Privacy Policy
  • Link Policy
  • Accessibility Policy
  • Security Policy
  • Michigan NewsMichigan.gov Survey


    Copyright © 2001-2013 State of Michigan