The issuance of a Groundwater Discharge Permit does not authorize violation of any federal, state or local laws or regulations, nor does it obviate the necessity of obtaining such permits, including any other DEQ permits, or approvals from other units of government as may be required by law.
Guidesheet II: Guidance For the Development of A Discharge Management Plan has been modified to include additional information. Those facilities and/or consultants developing a management plan for a rapid infiltration system should refer to the additional information on page K-3 in the K Appendix: Example DMP for Rapid Infiltration System.
Application Information
Part 22 Permit Application (PDF version) (Word version)
Part 22 Guidesheet I Hydrogeologic Study
Part 22 Guidesheet II for the Development of a Discharge Management Plan
Part 22 Guidesheet III Wastewater Characterization
Part 22 Guidesheet IV LagoonsPart 22 Guidesheet V Toxicity
Part 22 Guidesheet VI O&M ManualPart 22 Standards
General Permits
Rule 2215-05-1 Various Above Ground Disposal Systems (expired)
Rule 2215-05-2 Vehicle Wash - Non-Public (expired)
Rule 2215-05-3 Slaughterhouse (expired)
Rule 2215-05-4 Gravel Mining (expired)
Rule 2215-05-5 Oil Field Brine(expired)
Rule 2215-05-6 Vehicle Wash - Public (expired)
Rule 2215-05-7 Hydrodemolition (expired)
The new general permits are:
General Permits
Rule 2215-10-1 Above Ground Sewage Disposal Systems
Rule 2215-10-2 Vehicle Wash - Non-Public
Rule 2215-10-3 Meat Processing
Rule 2215-10-4 Gravel Mining
Rule 2215-10-5 Oil Field Brine
Rule 2215-10-7 Hydrodemolition
Rule 2215-10-8 Hydrostatic Test Water
General Technical Information
Groundwater Effluent Parameters and Detection Limits
Restrictive Covenant Running with the Land
Termination Request
Easement for Wastewater to Flow Under Property
Part 41
Wastewater System Construction Permits