Browsers that can not handle javascript will not be able to access some features of this site.
Skip Navigation
Michigan Department of Community HealthMichigan.gov
Michigan.gov Home MDCH Home | Online Services | Sitemap | Contact MDCH
Printer Friendly Version Printer Friendly   Text Only Version Text Version  Share this page.
Podiatric X-Ray Shielding Guidelines

Radiation shielding plan review approval should be obtained from the Radiation Safety Section for podiatric x-ray installations. Rule 365(2) requires shielding of the primary beam. In podiatric offices, the primary beam is generally directed to the floor for dorsal-planar projections and is directed horizontally towards a wall for laterals. Both areas, including an area extending 1 foot beyond, should be shielded with 1/16 inch lead equivalent shielding. If the office is located on a concrete slab, additional shielding for the floor is not necessary. If lateral shots are directed towards an outside brick or block wall, additional shielding is usually not required.

Secondary shielding of 1/32 inch lead equivalent may also be necessary on walls that adjoin areas that are either fully occupied or are not under the control of the podiatric office. This secondary shielding should extend from the floor to a height of 7 feet.



Related Documents
BHS/HFS-852; Application for a Radiation Shielding Plan Review - 508021 bytes PDF icon
Michigan Business One Stop
Link to Department and Agencies Web Site Index
Link to Statewide Online Services Index
Link to Statewide Web-based Surveys
Link to RSS feeds available on this site
Related Content
 • 
Guidelines for Specific Uses:
 PDF icon
 •  Dental Cephalometric and Tomographic Shielding Guidelines
 •  Dental CT Shielding Guidelines
 •  Mobile Lithotripsy Shielding Guidelines
 •  Radiation Shielding Plan Review and General Information
 •  Radiographic or Radiographic-Fluoroscopic Shielding Guidelines
 •  CT Scanner Shielding Guidelines
 •  Linear Accelerator Shielding Guidelines
 •  Mammography Shielding Guidelines
 •  Pain Management Mobile C-Arm Fluoroscopic Room Shielding Guidelines
 •  Shielding Design Guidance

Michigan.gov Home | MDCH Home | Contact MDCH | State Web Sites
Privacy Policy | Link Policy | Accessibility Policy | Security Policy | Michigan News | Michigan.gov Survey

Copyright © 2001-2009 State of Michigan