Skip to main content

Washtenaw Industrial Facility LLC (Former Universal Die Cast) (Saline, Washtenaw County)

Disclaimer: Web content may not be routinely updated on this page.

Please contact the Site Lead for the most up-to-date status of this site.

EGLE site lead

Sam Cairns, CairnsS2@michigan.gov or 517-898-4058.

Background

The Washtenaw Industrial Facility LLC (formerly Universal Die Cast) site is located at 232 and 290 Monroe Street in Saline. When Universal Die Cast operated on the property, it was a plater of die cast parts. All buildings and associated infrastructure were removed in 2015. This site previously had nickel samples that exceeded surface water quality standards. The site property extends both north and south of the Saline River. The southern portion of the site across the Saline River contained a pre-regulation surface impoundment for plating sludges, which was used in the 1970s. The material in the impoundment on the south side of the river was removed in the late 1990s.

Washtenaw County identified potential drinking water receptors adjacent to the site, near the PFAS impacted groundwater. Groundwater from the site discharges directly to the Saline River and only 2 residential drinking water wells had detections of one compound, well below the MCLs. The other primary receptor is the Saline River.

Content posted November 2020.

Preview of the Washtenaw industrial facility interactive map
Preview of the Washtenaw industrial facility interactive map

Washtenaw industrial facility LLC

View general information about the PFAS investigation being conducted at the Washtenaw industrial facility site. This map is a collection of various data sets related to the PFAS investigation.


Drinking water

Testing of adjacent residential wells show no need for an alternate water source. For additional information on residential well testing and results, visit the Frequently Asked Questions. EGLE has sampled all municipal water supplies for PFAS. View the results for the city of Saline here.

Anticipated activities

The Washtenaw Industrial Facility continues to sample the three wells installed in the intermediate aquifer for PFAS. The Washtenaw Industrial Facility has an approved well installation and abandonment workplan for the property south of the river and will commence work once they get approval from the City of Saline to perform curb and guardrail work along Monroe Street.

Historical timeline