Fort Gratiot Landfill (Fort Gratiot Township, St. Clair County)
Please contact the Site Lead for the most up-to-date status of this site.
EGLE site lead
Emily Ebaugh, EbaughE@Michigan.gov, or 586-255-2935.
Waste Disposal Questions
Please note that this landfill is CLOSED and does not accept waste.
Background
The Fort Gratiot Landfill site is located at 3290 Keewahdin Road in Fort Gratiot Township. The site was opened and operated from 1969 to 1994. The landfill was licensed for general refuse, and records suggest that during its operation the site accepted industrial waste including crushed barrels, paint sludge, paper pulp waste, and contaminated soil form environmental cleanup projects. In 1994, the landfill stopped accepting waste in response to the Michigan Department of natural Resources (MDNR) order to Cease and Desist. Due to the owner's lack of financial capability, the Michigan Department of Environment, Great Lakes, and Energy (EGLE) oversees post-closure maintenance and monitoring.
The landfill is located in the Black River watershed. Based on 2017 groundwater levels, the shallow groundwater is flowing towards the interceptor trench around the landfill. The surface water flow is to the southeast in the vicinity of the landfill.
This site was identified due to the results from EGLE's proactive Industrial Pretreatment Program.
Content posted July 2021.
Groundwater map
See an aerial view of the groundwater of the site.
Site map
See an aerial view of the location of the site.
Stormwater map
See an aerial view of the stormwater of the site.
Drinking water
Drinking water in the area is mostly municipal, from the city of Port Huron. No additional residential well sampling is planned. EGLE has sampled all municipal water supplies for PFAS. Fort Gratiot Township purchases water from the city of Port Huron.
Anticipated activities
The surface water investigation of the Howe/Brandymore Drain indicates multiple sources of PFAS in the Howe/Brandymore watershed. EGLE staff will be conducting further evaluation of the watershed. See Fort Gratiot Township area of interest for additional information. EGLE will be conducting further sampling of the surface waters in the ditch along Keewahdin Road towards Lake Huron. EGLE will be working with Wood to evaluate possible remedial options for the PFAS surface water exceedances.
Historical timeline
-
2018-Earlier
- On May 5, 2018 personnel from the Port Huron Waste Water Treatment Plant (WWTP) collected a sample from a sump (SP-6) on the landfill that contains groundwater and landfill leachate.
- On August 7, 2018, EGLE received the results from the Port Huron WWTP sample. Results for SP-6 were 140 ppt PFOS, 30 ppt PFOA.
- On September 26, 2018, EGLE contractor (AECOM) collected a groundwater/leachate sample from a different sump (SP-2) closer to the sanitary discharge for the landfill. Also, a surface water sample from Fort Gratiot Pond was collected.
- On October 5, 2018, EGLE identified two residential wells near the landfill and sought to test them. Only one well was tested on November 7, 2018; the other owner declined the offer.
- On October 10, 2018, EGLE received the results for the groundwater/leachate and surface water sample. Results were:
- The sump (SP-2) was 139 ppt PFOS, 84 ppt PFOA
- Fort Gratiot Pond: 46 ppt PFOS, 28 ppt PFOA
- On December 4 and 5, 2018, EGLE contractor (Wood) collected samples from 10 groundwater monitoring wells around the perimeter of the landfill property.
- On December 5, 2018, EGLE contractor (Wood) took surface water samples from
- Kettlewell Pond
- McIntyre Park Pond
- Unnamed Drain (S)
- Howe Drain
-
2019
- On January 3, 2019, EGLE received the results for the surface water sampling. Results were:
- Kettlewell Pond: non-detect (ND) for PFOS, 3 ppt PFOA.
- McIntyre Park Pond: ND for PFOS, 6 ppt PFOA.
- Unnamed Drain (S): 11 ppt PFOS, 16 ppt PFOA.
- Howe Drain: 150 ppt PFOS, 42 ppt PFOA.
- Due to these results, additional surface water samples will be collected in the Spring of 2019.
- On January 3, 2019, EGLE received the results from the groundwater sampling. The highest result was 370 ppt PFOS+PFOA from one sample, and 3,141 ppt Total Tested PFAS from a different sample.
- On February 4, 2019, EGLE turned the groundwater/leachate pumps off and they are no longer discharging to the Port Huron Waste Water Treatment Plant. EGLE is on-site weekly to check for leachate outbreaks and/or sumps overflowing on the property. The system will be started back up if any issues occur from being turned off.
- On April 24, 2019, EGLE's contractor (Wood) collected samples from 7 temporary monitoring wells installed on adjacent properties to the north, south, and east of the landfill. The highest result was 450 ppt PFOS+PFOA from one sample, and 578 ppt Total Tested PFAS from a different sample.
- On April 24 and 25, 2019, EGLE's contractor (Wood) collected samples from 11 groundwater monitoring wells around the perimeter of the landfill property. The highest result was 421.9 ppt PFOS+PFOA from one sample, and 4,845 ppt Total Tested PFAS from a different sample.
- On April 24, 2019, EGLE's contractor (Wood) took surface water samples from:
- Kettlewell Pond
- McIntyre Park Pond
- 2 Unnamed Drains
- Howe Drain (2 locations)
- On April 26, 2019, EGLE's contractor (Wood) collected a drinking water sample from a Saint Clair County Drain Commissioner garage located west of the landfill. The results of the drinking water well was non-detect for PFAS.
- On May 10, 2019, EGLE flew their drone with the heat camera over the landfill to assess any possible venting groundwater or leachate into the adjoining Fort Gratiot Pond.
- On May 31, 2019, EGLE received the results for the surface water sampling. Results were:
- Kettlewell Pond: non-detect 1.9 ppt for PFOS, 3 ppt PFOA.
- McIntyre Park Pond: 2.67 ppt for PFOS, 4.57 ppt PFOA.
- Unnamed Drain (SW-3): 11 ppt PFOS, 16 ppt PFOA.
- Unnamed Drain (SW-6): 180 ppt PFOS, 21.3 ppt PFOA
- Howe Drain (SW-4): 187 ppt PFOS, 42.1 ppt PFOA.
- Howe Drain (SW-5): 202 ppt PFOS, 42.5 ppt PFOA
- Due to these results, additional surface water samples will be collected July 1 and 2, 2019.
- Based on the two rounds of PFAS results for the two Township Park ponds and the deep aquifer show minimal to non-detect PFAS detections; no further PFAS sampling of the two park ponds and deep aquifer sampling are planned.
- Wood was out on July 1-2, 2019,to collect additional shallow groundwater samples to the south, west, and north of the landfill. Also, Wood collected additional up stream surface samples of the Howe and Brandymore Drain, along with resampling surface water locations sampled in December 2018 and April 2019.
- On August 1, 2019, EGLE received the results for the surface water and offsite groundwater sampling. Results were:
- Howe Drain (SW-4): 250 ppt PFOS, 64.2 ppt PFOA.
- Howe Drain (SW-5): 383 ppt PFOS, 87.2 ppt PFOA
- Brandymore Drain (SW-7): 544 ppt PFOS, 105 ppt PFOA
- Brandymore Drain (SW-8): 5.46 ppt PFOS, 4.59 ppt PFOA
- Unnamed Drain (SW-9): 6.91 ppt PFOS, 10.2 ppt PFOA
- Unnamed Drain (SW-10): 3.81 ppt PFOS, 30.1 ppt PFOA
- Due to these results, EGLE Water Division is looking into other sources of PFAS in the Howe/Brandymore Drains. As of October 2019 the area for surface water sampling has expanded due to elevated PFOS surface water results in various ditches in Fort Gratiot Township. Water Division continues to take the lead on this surface water PFAS area wide issue.
- EGLE RRD will evaluate shallow groundwater and surface water data to develop a sampling plan to delineate the shallow groundwater plume.
- In September 2019, EGLE staff gained access to 3 large tracts of land to the north, southwest, and west of the landfill to further delineate the shallow groundwater plume to further investigate.
- In October 2019, EGLE's contractor sampled the shallow monitoring wells around the perimeter of the landfill property as part of the annual groundwater sampling event. This was the third time these monitoring wells have been sampled for PFAS. EGLE should receive the results soon.
Historical Sampling Chart: Data is reflective of criteria prior to August 3, 2020, PFOS and PFOA Only
This chart reflects data received prior to August 3, 2020.
Type of Sample
Date Sampled (or Range)
Number of Samples
Number of Results Received
Number of Non-Detects Number Between Non-detect and Standard* Number Greater Than or Equal to Standard Groundwater
December 2018 - Present 49 49 17 16 16 Surface Water December 2018 - Present 16 16 0 8 8 Cumulative 65 65 17 24 24 *Groundwater results are compared to EGLE Part 201 Criteria of 70 ppt PFOS+PFOA.
*Surface water results are compared to Rule 57 surface water quality values of 12 ppt PFOS and 12,000 ppt PFOA
Related Sampling Notes
- Surface water samples were collected from McIntyre Park, Kettlewell Pond, Ft. Gratiot Pond, Howe Drain, and an unnamed drain south of the property.
- In November 2019, EGLE's contractor installed temporary and permeant monitoring wells on offsite properties to the south, west, and north of the landfill. The temporary wells were sampled to assess the offsite shallow groundwater.
- On January 3, 2019, EGLE received the results for the surface water sampling. Results were:
-
2020
- In August 2020, EGLE contractor Wood oversaw the installation and sampling along Keewahdin Road to further delineate the shallow groundwater for PFOA and PFOS.
- In September 2020, EGLE received the results from the August sampling. Results are reflected on the sampling chart.
- In November 2020, EGLE contractor Wood collected annual groundwater samples from 10 shallow monitoring wells around the landfill for PFAS.
-
2021
- In May 2021, EGLE contractor Wood oversaw delineation borings further east along the north and south side of Keewahdin Road.
- In May 2021, EGLE contractor Wood collected two surface water samples of the ditch along the north side of Keewahdin Road.
Sampling Results Summary
This table reflects data received after August 3, 2020. Data prior to August 3, 2020 is reflected in the timeline.
This table was updated to include all seven PFAS criteria effective December, 21, 2020.
Type of Sample
Date Sampled (or Range)
Numberof Sample Results Received
Number of Samples above Criteria*
Groundwater
August 2020 - November 2020 12 10 Surface Water November 2020 1 1 * Surface water samples are compared to Rule 57 non-drinking water values of 12 ppt for PFOS and 12,000 ppt for PFOA.Sampling Notes
- On August 3, 2020, new Part 201 Criteria went into effect. Historical sampling data compared to Part 201 Criteria >70 is captured in the historical timeline below.
- Other PFAS analytes were detected in samples. There are no federal or state standards for these analytes.
- On August 13, 2020, EGLE contractor (Wood) oversaw Fibertec install 4 temporary one inch monitoring wells and collected groundwater samples, southeast of the landfill on the north and south rights-of-way of Keewahdin Road. TMW-29 to TMW-32.
- On September 14, 2020, EGLE received the results and all four temporary wells were above the PFOA and PFOS drinking water criteria.