Generator Interconnection Procedures
General Interconnection Procedures for projects up to 150 kW (Categories 1 & 2) were approved by the MPSC in Case No. U-15919. Separate sets of procedures were developed based on the aggregate generator size:
- Category 1 Projects (20kW and smaller, inverter based)
- Category 2 Projects (Greater than 20kW and up to 150kW and also non-inverter based projects up to 20kW)
These are the general interconnection procedures approved by the MPSC and should be used for reference only. Each utility will have its own set of documents updated with the necessary utility specific information.
A combined Interconnection & Parallel Operating Agreement is available for Projects up to 150 kW.
Interconnection & Parallel Operating Agreement for Projects up to 150kW
Note: Municipal Utilities in Michigan are not regulated by the Michigan Public Service Commission. To learn about net metering and interconnection policies for Michigan Municipal Electric Utilities, please contact them directly.