Skip to main content

DTMB hosts building dedication ceremony for the State Public Health and Environmental Science Lab

DIMONDALE, Mich. – Today, the Michigan Department of Technology, Management & Budget (DTMB) hosted a dedication ceremony for the State Public Health and Environment Science Lab building in Dimondale, Mich.  The new state-of-the-art, 300,000-square-foot facility will house consolidated lab space for the Michigan Department of Health and Human Services (MDHHS); the Michigan Department of Environment, Great Lakes, and Energy (EGLE); and the Michigan Department of Labor & Economic Opportunity (LEO).

 

The new facility will expand upon and enable testing and other laboratory functions in a safe, secure environment designed to promote efficiency, collaboration, and innovation. The building also features a 285-well geothermal field to reduce energy use and emissions, as well an all-electric mechanical system that is the first of its kind in the U.S.

 

The MDHHS Bureau of Laboratories currently provides a wide variety of clinical and environmental public health testing. The lab processes a total volume of nearly 7 million tests annually.

 

“This new state-of-the-art facility will continue the Bureau of Laboratories’ long history of protecting the health and safety of Michigan families through hundreds of tests conducted by our dedicated staff on a daily basis,” said Amy Epkey, MDHHS acting director. “In addition to newborn screening and testing for influenza, Salmonella, rabies, heavy metals such as lead and infectious diseases such as measles, Michigan’s lab serves as a testing location to assist other states and federal partners to help prevent bioterrorism and chemical terrorism.”

 

The new laboratory will strengthen Michigan’s environmental and public health protections by increasing the efficiency of EGLE’s processing of more than 100,000 samples and 2.5 million test results annually. As the state’s principal drinking water laboratory under the Safe Drinking Water Act, the facility will support EGLE’s science-based work to protect the air, soil, water, and public health that more than 10 million Michigan residents rely on every day.

 

“We are excited about the opportunities this new laboratory creates for EGLE and the people we serve,” said EGLE Director Phil Roos. “The facility strengthens our ability to protect Michigan’s environment and public health through data-driven research and supports the critical work our scientists perform every day. It is an investment that will benefit Michigan communities for decades to come.”

 

The new facility will also house LEO’s Michigan Occupational Safety and Health Administration (MIOSHA) Occupational Health Laboratory and the Instrument Calibration and Maintenance Unit. The Occupational Health Laboratory analyzes samples to help identify and evaluate potential workplace health hazards and the Instrument Calibration and Maintenance Unit supports MIOSHA’s field operations by maintaining and calibrating equipment used to assess workplace conditions. Each year, MIOSHA’s laboratory receives nearly 2,900 samples and conducts more than 10,000 analyses.

 

"We're grateful and excited for this new, state of the art facility that will allow our MIOSHA team to continue their vital work to protect Michigan workers — ensuring they return home safely at the end of each workday," said LEO Director Susan Corbin.

 

The facility features sustainable design elements, including a geothermal-based heating and cooling system, extensive use of daylighting and energy efficient LED lighting, water-saving plumbing fixtures, and cross-laminated timber on the exterior wall panels, which offers high carbon sequestering to help reduce the facility’s carbon footprint. The new building will be maintained and operated by DTMB.

 

“The new, state-of-the-art facility represents a major investment in Michigan’s public health infrastructure,” said DTMB Acting Director Kyle Guerrant. “By providing state employees with a safe and secure workspace and increased capacity, the facility will enhance our ability to deliver timely and reliable laboratory services to residents. We are grateful to Governor Whitmer, the Legislature, and the federal government for their support in bringing this facility to fruition.”

 

Construction of the $348.6 million facility was made possible by $260 million in federal funding from the American Rescue Plan Act’s Coronavirus State and Local Fiscal Recovery Funds and $88.6 million in state funding from the State Building Authority. Staff are scheduled to begin moving into the lab during the first quarter of the 2027 calendar year and will stretch into late summer/fall 2027.

Group of people smiling and posing in front of a plaque.

Officials from the State of Michigan and construction and design partners at the building dedication ceremony for the State Public Health and Environmental Science Lab. Photo credit: Casey Hull, Michigan Department of Technology, Mangement & Budget.

Media Contact: