Work has included a comprehensive evaluation of the terrestrial and Torch Lake water body portions of the Calumet and Hecla Lake Linden Operations Area (CHLL), Calumet and Hecla Tamarack City Operations Areas (CHTC), and Quincy Mining Company Mason Operations Area (QMCM) within the Project footprint (for a map of project areas, see “Project Background”). 

Michigan Department of Environment Great Lakes and Energy (EGLE) Remediation and Redevelopment Division (RRD) Upper Peninsula District Office (UPDO) has shared Project findings with the public and other Project stakeholders, including the Michigan Department of Health and Human Services (MDHHS, formerly the Michigan Department of Community Health) for their review and input and to ensure that any public health concerns are identified and addressed.

Areas of asbestos containing building material (ACBM) and upland and sediment polychlorinated biphenyls (PCB) contamination have been identified, and hundreds of deteriorated drums have been located on the lake bottom.  Information to allow public health risk evaluation at the two public beach areas and appropriate information has been shared with MDHHS and the beach area owners, and other private property owners.

The EGLE UPDO has undertaken numerous interim response actions to mitigate threats to human health and the environment. For conditions beyond EGLE's resources, referrals, have been made to the EPA Emergency Response Branch.

In 2014 and 2015

  • PCB contamination at the former C&H Power Plant Building and the associated widespread asbestos contamination have been remediated under the oversight of the U.S. Environmental Protection Agency’s (EPA) Emergency Removal Branch; 
  • Asbestos contamination at the former Tamarack City Stamp Mill has also been addressed by the EPA’s Emergency Removal Branch;
  • The presence of PCBs in the sediments at the Lake Linden Beach have been evaluated by MDHHS and have been determined to not pose an unacceptable risk to users of the recreation area due to either their depth within the sediment or the depth of the water;
  • Hazardous substance (chemical contamination) risks have not been identified at the Hubbell Beach, although the owner has posted the beach advising users not to swim due to the presence of physical hazards (glass, rusted metal, etc.);
  • An area accessible by residents in Tamarack City where asbestos was found (Tamarack City Trail Asbestos) has been covered and graded to prevent exposure (see below); and,

Tamarack City Trail Asbestos and Former Calumet Stampmill

  • The former Calumet Stamp Mill (currently occupied by the Houghton County Historical Society, and which is open to the public), where additional significant quantities of asbestos wastes have been found, has been referred to the EPA’s Emergency Removal Branch, who is currently working with the property owner and others to abate risks (see above).

In 2016

  • The former Coal Dock and Mineral Building properties in the Hubbell Processing Area, where significant deposits of upland PCB-containing wastes and contaminated soils have been identified, has been secured from public access;
  • ACBM located around the former Mineral Building in the Hubbell Processing Area has been removed (see below);

ACBM was removed from the former Mineral Building in the Hubbell Processing Area

  • ACBM was removed and the remnants of an old dump area capped in the Ahmeek Mill Processing Area (see below, near the Tamarack City Park);

ACBM was removed and the remnants of an old dump area capped in the Ahmeek Mill Processing Area near Tamarack City Park

  • Geophysical investigations of suspected buried waste in the Tamarack City Sands and Hubbell Smelter areas have been conducted to determine the extent of wastes and containers buried beneath the Superfund cap. These buried wastes are slated for additional investigation in 2016 and removal in 2017;
  • In-lake side-scan sonar investigations were conducted in the Quincy Mining Company Mason (QMCM) portion of the Project footprint, in advance of on-land and in-lake investigation.
  • Conducted drainage ditch clean-out on the former Coal Dock property in the Hubbell Processing Area in order to allow for rain and snow-melt to flow along the original drainage ditch paths across the property and to avoid erosion of the PCB-containing wastes and contaminated soil into Torch Lake;
  • Completed ACBM and RPM Removal IR operations at the Mineral Building and Coal Dock properties within the Hubbell Processing Area and at the Tamarack Processing Area including:
    • Picked-up, contained, and transported for disposal all visible pieces of ACBM and suspect ACBM (SACBM) from the Hubbell Processing Area Coal Dock property totaling 0.14 tons of ACBM/SACBM. 
    • Picked-up, contained, and transported for disposal all visible pieces of ACBM and SACBM from the Hubbell Processing Area Mineral Building property totaling 1.77 tons of ACBM/SACBM.
    • Picked-up, contained, and transported for disposal all visible pieces of RPM and suspect RPM (SRPM) from the Hubbell Processing Area Coal Dock and Mineral Building properties totaling 2, 55-gallon drums of PCB containing RPM/SRPM. 
    • Picked-up, contained, and transported for disposal all visible pieces of ACBM and SACBM from the Tamarack Processing Area totaling 1.19 tons of ACBM/SACBM. 

    Asbestos containing material Asbestos containing material in the debris

    • Completed Abandoned Container IR operations within the CHLL and CHTC including test pitting and characterization, transportation, and disposal of 118 abandoned containers:
      • 1 from the Torch Lake Backwater Area.
      • 67 from the Hubbell Processing Area Coal Dock property.
      • 16 from the Hubbell Processing Area Mineral Building property.
      • 2 from the Hubbell Slag Dump and Beach Area.
      • 22 from the Tamarack Processing Area.
      • 10 from the Tamarack Sands Area.

    The contents of the drums were unknown, but based on field observations, drum contents appeared to include, but were not limited to, pine oil, silver paint-like material, lubricating oils, petroleum, granular materials, tailings and slag-like materials, and a watery white substance. 

    Removal of Buried DrumsDrums on the ground surface with debris

    Removal Actions Completed in 2017

    • Evaluation of results of several key studies conducted at the Lake Linden Recreation Area (LLRA) between 2005 and 2017 concluded that contamination exceeding health based and ecological criteria extends outward from the area along the shore that was the focus of a 2007 emergency removal. Based on these findings, in January 2017, EGLE requested assistance from the EPA ERB from Grosse Ile to address the contaminated sediments at the LLRA site. The EPA evaluated the existing information and is working with Honeywell Specialty Materials to further evaluate risks and develop a remedial approach for contaminated sediments.  Representatives of EGLE, EPA, Michigan Department of Health and Human Services (MDHHS), Western Upper Peninsula Health Department (WUPHD), and Village of Lake Linden are collaborating to identify and implement measures to ensure the safety of the recreational area users. 

    The above photo depicts dredging operations via an excavator during the 2007 emergency removal in the Lake Linden Recreation Area

    The above photo depicts near shore sediment sampling conducted in October 2017.

    • The EPA ERB continued working with Honeywell Specialty Materials and the Houghton County Historical Society to complete removal of asbestos near the foundations at the Museum in Lake Linden in spring 2017.

    The above photo depicts the former Calumet Stampmill foundation after asbestos removal was complete in the spring 2017.

    • Evaluation of results of several key studies conducted at the C&H Mineral Building between 2005 and 2017 identified potential threats to human and ecological receptors, including but not limited to: human health risks in the event of direct contact with polychlorinated biphenyls (PCBs) and metals contaminated surface soils, residual process materials (RPM), abandoned containers, waste piles, and stack debris; inhalation of particulates and asbestos containing building materials (ACBM); and physical hazards.  Exposed ACBM, specifically roofing material that had fallen and/or been and continues to be blown off the roof of the Mineral Building, was present on the ground, waste pile, and stack debris surfaces, including outside of the fenced Site property in the Michigan Department of Transportation (MDOT) right of way (ROW) that includes a wide paved shoulder used heavily by local residents for recreational purposes (beyond which there are single-family residences).  Based on the conditions the EGLE RRD completed a series of IRs and continued Site Investigation (SI) activities in 2016 and 2017 that included removal of 13.58 tons of ACBM, a 118-ton hazardous waste pile, and 16 abandoned containers.  Based on these findings, in November 2017, EGLE requested assistance from the EPA ERB to address:
      • Remaining waste piles, stack debris, and ACBM, including roofing materials that have been and will continue to fall and blow off of the Mineral Building roof onto the property, bordering properties, and the adjacent MDOT Highway M-26 ROW; and,
      • Wind and water erosion and deposition of contaminated soils and wastes into the environment.
    • The EPA evaluated the existing information, conducted a removal assessment, and is working with Honeywell Specialty Materials to further evaluate risks and develop a remedial approach.  EGLE, EPA, MDHHS, WUPHD, Houghton County, and Torch Lake Township officials are collaborating to find a solution to the C&H Mineral Building property roof.

    The above photo depicts debris piles on the Mineral Building property.

    The above photo depicts asbestos containing roofing material which has blown off the Mineral Building roof to the M-26 right of way.

    • A sampling and analysis plan (SAP) was developed for the Quincy Mining Company Mason Operations Area (QMCM) based on a comprehensive review of existing information and implemented during 2017 by the EGLE.  Findings of the SI indicated the presence of ubiquitous ACBM, RPM and abandoned containers throughout the QMCM, including the Quincy Mill ruins west of M-26 that is frequented by recreational users.  Note that these items were not addressed by the Torch Lake Superfund Site Cleanup project that did cap a portion of the QMCM east of M-26.  Based on these findings, in November 2017, EGLE requested assistance from the EPA ERB to address the ACBM, abandoned containers, and RPM.  EGLE and EPA have notified the property owners and representatives of the MDHHS, WUPHD, and Osceola Township of the study area conditions.  The EPA is in the process of evaluating existing information and plans to conduct a removal assessment during 2018. 

    The above photo is a view from the bluff at the top of the former Quincy Mining Company- Mason stampmill.

    The above photo shows graffiti on the walls of the Quincy Mining Company- Mason stampmill, directly below a pipe wrapped in damaged, suspect asbestos pipe wrap material.

     

    • Investigations at the former Hubbell Smelter property and on the south side of the Tamarack Sands indicated debris has been buried beneath the Superfund soil cap.  Investigative activities also indicated PCB-contaminated soils eroding into Torch Lake at the former Hubbell Coal Dock property.  To address the conditions in these three areas IRs were implemented during 2017.
      • Completed seep IR operations within the CHTC Tamarack Sands included test pitting, characterization, transportation, and disposal of 19.29 tons of seep material and restoration.  The photos show the flowing, plasticizer-type waste being removed from one of the seep areas and the work area following restoration in accordance with EPA capping standards for the Torch Lake Superfund site.  

    Plasticizer-type waste being removed from one of the seep areas

    Work area following restoration in accordance with EPA capping standards for the Torch Lake Superfund site

    • Completed IR operations on the Hubbell Smelter property shoreline included test pitting; characterization, transportation, and disposal of 10 abandoned containers and restoration in accordance with EPA capping standards for the Torch Lake Superfund site.  The contents of the drums were unknown, but based on field observations, drum contents appeared to include, but were not limited to, hardened masses of granular materials in some cases embedded with copper wire and other metallic debris.  One container included a whitish-sludge, similar to that observed in submerged drums in deeper water just offshore of the Hubbell Smelter property. All eight of the drums with contents contained PCBs. The photos show drums removed from beneath the cap at the water’s edge.

    Drums being removed from immediately beneath the Superfund vegetated soil cap in the Hubbell Processing area.

    Drums being removed from immediately beneath the Superfund vegetated soil cap in the Hubbell Processing area.

     

    • In 2017 IR actions were undertaken at the Hubbell Coal Dock property, including:
      • Capping of approximately 7-acres of PCB-contaminated soils to stop water and wind erosion and inhibit direct contact with;
      • Replacement of approximately 170 feet of failing culverts;
      • Improvement and armoring of 750 feet of drainage ditch;
      • Removal and disposal of 320 pounds of ACBM and one drum of PCB-contaminated RPM; and,
      • Removal and disposal of 118 tons of hazardous waste soil contaminated with PCBs and lead. 

    The above photo shows the conditions on the former Coal Dock property at the Hubbell Processing Area.

    The below photo shows the same view but after site remediation was completed in August 2017.

     

    • The AMW project team started looking at the Quincy Mining Company operational areas from Dollar Bay down to the Portage Lift Bridge – the QMCP. We completed preliminary reconnaissance activities in 2017 including a side scan sonar survey.  In 2018, we will complete a comprehensive review of existing information and develop a SAP to assist in the identification of historic areas of contamination or data gaps requiring further assessment. Subsequently, the SAP will be implemented and depending on the findings, IR actions may be undertaken to reduce the public’s potential for exposure to mining era wastes. 

    Photo of stockpiled drums historically present in the QMCP area.

    In 2018

    • The AMW project implemented the QMCP SAP from Dollar Bay down to the Portage Lift Bridge. The Site Investigation (SI) identified the presence of hundreds of abandoned containers, widespread asbestos, and oil sheens on the surface water draining to the Portage Canal, suspect PCB and mercury containing equipment, and PCBs in surface soils near the Portage Canal. Where these conditions are present, the privately owned parcels are transected by the MDNR Lake Linden Route trail (a.k.a. Trail No. 3) and are accessible to the public. The EGLE notified property owners of the study area conditions and evaluated additional SI and/or IR activities. The MDNR (trail owner) and Julio (property owner) undertook measures including temporary and semi-permanent fencing, gating, and signage installation to restrict access to the Julio properties and to direct trail users to the designated MDNR trail. In addition, the property owner discontinued accepting salvage materials and began removing previously accumulated salvageable materials from the parcels.
    • C&H Mineral Building Waste Piles and Asbestos - in response to the EPA and EGLE directives, the property owner Silver Shore undertook abatement activities between June and September 2018 that included the removal of 11.41 tons of ACBM from the roof of the C&H Mineral Building and the ground surface near the building, including outside of the fenced site property in the MDOT ROW. In addition, Honeywell and Silver Shore secured the site through fence installation. The EPA continued to work with Honeywell to further evaluate risks and develop a remedial approach for the waste piles.
    • EPA ERB SI activities identified the presence of widespread ACBM, RPM and abandoned containers throughout the QMCM, including the Quincy Mill ruins west of M-26 that is frequented by recreational users. In 2018, the EPA ERB initiated removal of the ACBM, RPM and abandoned containers and planned to resume on-site activities in spring 2019.
    • IR actions were undertaken at the Hubbell Coal Dock property, including refinement of drainage improvements and initiation of long-term cap operation and maintenance (O&M) activities.
    • Due to the presence of sediment contamination exceeding health based and ecological criteria the EGLE requested assistance from the EPA ERB. EPA evaluated the existing information and began working with Honeywell to further evaluate risks and develop a remedial approach for contaminated sediments. Honeywell conducted a series of studies and developed a remedial approach to remove a portion of the most highly contaminated shallow, nearshore sediments in the LLRA to be implemented in 2019.Honeywell and EPA’s Great Lakes National Program Office (GLNPO) began evaluation of remediation options for other contaminated sediments in the LLRA.
    • Studies conducted off shore of the C&H Hubbell Processing Area identified potential threats to human and ecological receptors, including but not limited to: PCB, metals, and semi-volatile organic compound contaminated sediments and deteriorating drum contents in Torch Lake. Studies included SSS surveys that identified a high concentration of industrial materials on the lake bottom out from the shoreline in the HPA. Visual inspection of these anomalies using an autonomous underwater vehicle (AUV) equipped with a video camera confirmed that abandoned containers including drums, metal debris, circuit board waste, and similar materials are present on the lake bottom. Using an AUV equipped with a sampling arm, the contents of 12 of the reported hundreds of submerged abandoned containers were sampled near known PCB-contaminated sediments in the Hubbell Processing Area. Total PCBs were detected in all 13 of the samples collected from the contents of 12 submerged drums. This approximate 27-acre area is an apparent on-going source of PCBs into the Torch Lake environment. Based on these findings EGLE requested assistance from the EPA ERB to address the in-lake drums and PCB-contaminated sediments off-shore of the C&H Hubbell Processing Area. Subsequently the referral was directed to the EPA’s GLNPO program that is evaluating the area with Honeywell.

      In 2019
    • AMW project work in the QMCP Ripley Waterfront area included notifying the WUPHD and the MDHHS of the conditions in the QMCP. The MDHHS provided a public health hazard determination that concluded, “…there are physical and chemical hazards currently present at the Julio Properties that could cause harm to people on or near the property resulting in injury or disease now or in the future. In addition, there is the potential for presence of imminent hazards” and subsequently the WUPHD issued an advisory to the public. To in part mitigate the human and ecological risk posed by these conditions EGLE undertook IRs in 2019 including:
    • Removal and disposal of 20 pounds of elemental mercury, 550 pounds of mercury impacted debris, and 25 cubic yards of mercury impacted scrap metal from the Julio Salvage parcel; and,
    • Removal and disposal of .52 tons of ACBM from the Julio Contracting/Former Standard Oil Company and Julio Scrap Yard & Tower parcels with a second round of pickup planned for 2020.
    • EGLE requested assistance from the EPA ERB to address the remaining potential health risks and the MDNR (trail owner) and adjacent property owner (Julio) undertook additional measures including temporary and semi-permanent fencing, and signage installation to restrict access, and the property owner continued removing previously accumulated salvageable materials.  Representatives of EGLE, EPA ERB, MDHHS, WUPHD, MDNR, and the property owner continued collaborating to identify and implement measures to ensure public safety. 
    • Honeywell removed and covered a portion of the most highly contaminated shallow, nearshore sediments in the LLRA to reduce risks to recreational area users. The time critical removal action (TCRA) entailed dredging and off-site disposal of approximately 1,578 cubic yards of contaminated sediment from nearshore areas to address potential public health and ecological risks attributable to elevated concentration of PCBs and metals in sediment. Clean backfill materials were placed following dredging to minimize the potential for direct human or benthic contact with the contaminated sediments not removed.
    • Under their agreement, Honeywell and GLNPO further evaluated risks and began development of a remedial approach for remaining contaminated sediments in the LLRA TCRA footprint and offshore in deeper water, and offshore of the C&H Hubbell Processing Area.
    • EPA ERB completed the cleanup of ACBM, RPM and abandoned containers throughout the QMCM, including the Quincy Mill ruins west of M-26.
    • EGLE completed IR actions and conducted long-term cap O&M activities at the Hubbell Coal Dock property.
    • Honeywell, as part of their partnership with GNLPO to mitigate sources of contamination to Torch Lake:

      Based on the completed removal the WUPHD lifted the previously issued area health advisory.

    • Removed and disposed of over 15,000 tons of PCBs, metals, and asbestos contaminated surface soils, RPM, waste piles, and stack debris at the C&H Mineral Building Site and plan to complete site restoration in 2020; and,
    • Removed surface soils and residual ACBM from the MDOT ROW adjacent to the Site.
    • As requested by EGLE, EPA ERB conducted an assessment of the Gay Stamp Mill ruins and identified potential threats including but not limited to: human health risks in the event of direct contact with metals contaminated surface soils and waste piles; inhalation of particulates and asbestos; and, physical hazards. In 2020 the EPA ERB plans to remove the metals contaminated materials and ACBM.