MiEnviro Portal for Air webinar series
MiEnviro Portal for Air webinar series
EGLE's Air Quality Division is offering this series of virtual training sessions to ensure all users are familiar with the new MiEnviro Portal for Air. Permit applications, compliance reports, and other documents will be submitted using MiEnviro. This training will cover System Access and Navigation, as well as changes to the submittal processes.
Additional instructions on submitting information through the portal will be posted on the MiEnviro for Air webpage.
Introduction to MiEnviro for Air: air permitting and compliance
The kick-off for the webinar series for air permitting and compliance reporting!
This session covers some of the basics including navigating the system, finding available resources and basics on the forms that are available.
This session is a foundation for all later sessions.
Permit to Install (PTI) recordings
Recordings are approximately 1.5 hours unless otherwise stated.
PTI Part 1: Introduction to the PTI Submission Package
Introduces the process for submitting a PTI application, including new concepts such as the PTI submission package and related forms. This also includes a new form, called the equipment inventory form.
Recorded December 17, 2024
PTI Part 2: Submission Package Forms
A deeper dive into the PTI forms and various statuses for the forms and equipment and control devices within the forms. This training will also cover how to submit the forms and package to the AQD as well as get into notifications you will receive in the system from the AQD about your permit package.
Recorded December 17, 2024
PTI Part 3: General PTI Training
Specific actions associated with a PTI submission package, including submission of a construction waiver, making changes to a permit form, requesting a permit to be voided or withdrawn and others. This session will also discuss General PTI’s.
Recorded: January 7, 2025
PTI Part 4: Non-Metallic Mineral Crusher Permits and Relocation Notices
Covers the submission of a general permit application for a non-metallic mineral crusher and how to submit a relocation notice. Session is geared towards those involved in the non-metallic mineral crushing industry and will also include information on navigating MiEnviro Portal.
Recorded: January 9, 2025
Renewable Operating Permit (ROP) recordings
Recordings are approximately 1.5 hours unless otherwise stated.
ROP Part 1: Initial Applications
Covers the initial ROP application process, including the concept of a submission package and the forms that are included in the package. Includes how to submit and correct an initial application form (if necessary) and how to track your initial application as it goes along in the process.
Recorded January 21, 2025
ROP Part 2: Renewal Applications
Covers the renewal ROP application process, including the concept of a submission package and the forms that are included in the package. Includes how to submit and correct a renewal application form (if necessary) and how to track your renewal application as it goes along in the process.
Recorded: January 21, 2025
ROP Part 3: Life after ROP and ROP Modifications
Covers what to do if you need to modify your ROP, including: what to do if you received a new PTI and need to incorporate it into your ROP, adding a new piece of exempt equipment, or a change in a responsible official.
Recorded: January 23, 2025
Emissions testing and compliance reporting
Recordings are approximately 1.5 hours unless otherwise stated.
Compliance Reporting
How compliance reports are submitted to us in MiEnviro Portal. Also shows you how these requirements tie back to a permit (PTI or ROP), how you submit them, make corrections to them, and how you get notified of these reporting requirements in MiEnviro Portal.
Recorded January 14, 2025
Emissions Testing: Submitting Test Plans and Results
Covers how emissions test plans are submitted to the AQD through MiEnviro Portal. Also covers how we send approvals to the submitter and how to submit any test results to us.
Recorded: January 14, 2025