The web Browser you are currently using is unsupported, and some features of this site may not work as intended. Please update to a modern browser such as Chrome, Firefox or Edge to experience all features Michigan.gov has to offer.
Renewable Operating Permits (ROPs) / Title V
Renewable Operating Permits (ROPs) / Title V
The operating permit program is a national air permitting requirement under Title V of the federal Clean Air Act Amendments of 1990 and is administered by each state. In Michigan, these permits are known as Renewable Operating Permits (ROPs). This page is designed to help initial applicants and those renewing applications navigate the obligations of the permitting program and provide resources to guide facilities through the process. For more information, see the ROP Program Overview.
-
MiEnviro Portal
Getting started in MiEnviro Portal
Facility Specific Information
-
Viant Medical, Inc.
Facility specific information
Facility-specific information prior to December 10, 2024The Air Quality Division shares information about facilities regulated by state and federal air quality regulations in Michigan. This information includes but is not limited to, Permits to Install (PTI), Renewable Operating Permits (ROP), inspection reports, stack test reports, and enforcement documents. This information can be found in MiEnviro Portal.
The Air Quality Division provides access to facility-specific pages for locations identified as having significant community interest. These pages offer detailed information on emissions, permitting activity, compliance status, and opportunities for public engagement. They are designed to support transparency and informed participation in environmental oversight. This information can be found at the Facilities of community interest webpage.
-
application form
Initial Application
A source that becomes subject to Title V must submit an initial application.
-
a document is labeled "five years" and is surrounded by two circular arrows implying renewals
Renewal Applications
Once a source has an ROP, it must renew the permit every five years.
-
A large arrow on the left points to the right with the word "change" in it. Smaller arrows on the right point left to the larger one.
Modifications
Sometimes a source needs to make changes to its ROP after a permit is issued.
-
A single microphone in focus, with a blurred background of meeting attendees
Public Notice
ROPs are required to undergo public comment.
-
a puzzle piece connects two larger puzzles on either side
Resources and Guidance
Support and Information
- Acid Rain (Title IV) Air Permits
- Cross-State Air Pollution Rule (CSAPR)
- AQD Delegations
- GACT / MACT / NESHAP / NSPS Information
- Issued Permits to Install (PTIs)
- Webinar Series: Clean Air Act ROP (Title V)
- Michigan Title V Operating Permit Program Approval History
- Potential to Emit (Air Permitting)
- Monthly ROP Summary Report
-
EGLE Air Monitoring Station
Compliance Assurance Monitoring (CAM)
Some ROPs are required to have CAM plans as part of them.
-
rows of data binders on shelves
Compliance Reporting
ROPs are required to submit compliance-specific records.
Documents
-
- CAM Fact Sheet
- CAM Example Table
-
- Life After ROP: Renewable Operating Permit Reporting and Revisions Workbook Download
- MACT AAAA Opt-In Notification for Municipal Solid Waste Landfills Download
- State and Federal Regulatory Excerpts Associated with Rules 215 and 216 Download
- Renewable Operating Permit (ROP) Manual Table of Contents Download
- AQD Opt-Out Guidance Download
- Renewable Operating Permit (ROP) Program Overview Download
Templates
-
Currently, the Templates by Rule are identical for initial and renewal applications. That may change in the future.
-
- Emission Unit Table
- Flexible Group Table
- Source-Wide Table
Contact us
For general questions, please contact us at EGLE-Assist@Michigan.gov or 800-662-9278.
For small businesses, the Clean Air Assistance Program is also available for assistance.