Skip to main content

MiSTAR - Class II Injection Reporting

Beginning on the Date of Primacy (August 29, 2022), all reporting for Class II injection wells is required to be done through the MiSTAR Injection application. This includes the Monthly/Annual injection Well Operating Report (formerly form EQP 7609), Standard Annular Pressure Test (formerly form EQP 7606), Notification of Loss Mechanical Integrity, Notification of Scheduling MIT, and Quarterly Annulus Fill Reports. Documents such as Chemical Analysis of Injectate, Pressure Gauge Calibration Data, MIT Charts, and other documents can be submitted in a PDF format. In addition, operators may interactively receive correspondence from the Geologic Resources Management Division pertaining to their operations on a real time basis. 

For more information about how to use the MiSTAR Injection system, please refer to the following:

Contact us

Eric Kimber, EGLE-GRMD-UIC@Michigan.gov, 269-491-4106