White Pine North mine project
The White Pine North Mining Permit Application was received by EGLE on September 15, 2026. The permit application proposes an underground mining operation and adjacent processing facility the would produce copper and silver concentrate from chalcocite ore, similar to the historic mining and processing that occurred on the site from 1955 to 1995.
In 2021, White Pine Copper LLC acquired the White Pine Project with the intent to advance the White Pine North Project, which is an extension of the former mine with an expected 26-year mine life. Kinterra Copper USA LLC acquired 100% interest in the project in 2026 and secured financing to advance the project to permitting.
Mining permit
Mining permit status: Submitted and under review
Project updates
- None at this time.
Upcoming Events
No upcoming events at this time. Check back later!
Permit application materials
Please note - many of the documents are quite large in size (up to 390MB) and may result in longer than usual download times