Skip to main content

Resources for local governments
Wastewater

EGLE supports local governments in managing wastewater through permitting, monitoring, and enforcement under the Clean Water Act, offering technical assistance and funding options to help municipalities build, upgrade, and operate compliant, efficient wastewater treatment systems while safeguarding public health and Michigan’s waterways.

Resources

  • Clean Water Revolving Fund

    Clean Water Revolving Fund: affordable financing for local water infrastructure.

  • MiEnviro Portal

    MiEnviro Portal is a comprehensive electronic notification, permitting, emissions reporting, and compliance application.

  • Wastewater Operator Certifications

    Program ensures operators are qualified to manage municipal and industrial wastewater facilities, helping communities maintain effective treatment systems

  • CSO SSO RTB Conner facility for banner

    Combined Sewer and Sanitary Sewer Overflow

    Michigan’s Combined Sewer Overflow and Sanitary Sewer Overflow program, overseen by EGLE, requires municipalities to monitor, report, and mitigate overflows from sewer systems.

    Local governments operating combined or sanitary sewer systems must develop control programs and report any overflow events via EGLE’s MiEnviro Portal. In addition, when overflows happen frequently in a sanitary system, the chronic problems must be addressed to eliminate the overflows.

  • WWTP for Groundwater discharge banner

    Groundwater Discharge Permit Program

    Under Part 31 of Michigan’s Natural Resources and Environmental Protection Act, EGLE governs the discharge of treated wastewater into the ground or groundwater.

    Local governments may be permittees or partners when municipal or county-owned facilities discharge to groundwater. These municipalities must apply for permits, perform monitoring, and allow EGLE to inspect operations, ensuring the protection of groundwater quality from public systems.

  • IPP Banner

    Industrial Pretreatment

    The Industrial Pretreatment Program safeguards municipal wastewater treatment plants by regulating industrial discharges into public systems. Local governments managing publicly owned treatment works (POTWs) implement approved pretreatment programs, including issuing local ordinances, permitting industrial users, monitoring discharges, and enforcing compliance.

    This municipal authority prevents harmful pollutants from compromising treatment infrastructure and waterways.

  • Grand River Lansing

    The Municipal Separate Storm Sewer System or MS4

    Communities within urbanized areas—typically cities, townships, or counties—are required under EGLE’s MS4 program to obtain NPDES permits for stormwater systems (catch basins, ditches, pipes).

    Local governments develop and enforce Stormwater Management Plans encompassing public education, illicit discharge detection, post-construction controls, and monitoring, all aimed at reducing pollutant runoff into local water bodies.

  • NPDES Banner - Cass City first day of new facility

    National Pollutant Discharge Elimination System

    The NPDES program is intended to control direct discharge into the surface waters of the State by imposing effluent limits and other conditions necessary to meet State and federal requirements.

    This includes regulation of municipal wastewater treatment plants managed by local governments that discharge to lakes, rivers, streams, and wetlands. These facilities must apply for permits, perform monitoring, and allow EGLE to inspect operations, ensuring the protection of surface water quality from public systems

  • Manistee WTP construction

    Wastewater Construction Permits: Part 41

    Local governments undertaking the design or expansion of municipal sewer systems in Michigan must secure Part 41 wastewater construction permits from EGLE.

    These permits ensure that proposed plans meet engineering standards to protect public health and the environment. The process, administered via the MiEnviro portal, involves EGLE review of plans, issuance within 45–150 days, and post-construction inspections.

Frequently asked questions (FAQ)

  • How can local limits be developed that will achieve water quality standards (WQS) in the wastewater treatment plant (WWTP) discharge?

  • What can we do to protect the Publicly Owned Treatment Works (POTW)?

  • Who needs a National Pollutant Discharge Elimination System (NPDES) permit?

  • Do you have consultants that could help me with my permit application or project?