Public comment period for proposed dredging in Menominee County
The Department of Environment, Great Lakes, and Energy (EGLE) has received a Federal Consistency Determination under Section 307 of the Federal Coastal Zone Management Act (CZMA) from the U.S. Army Corps of Engineers (USACE), Detroit District, regarding proposed maintenance dredging of the federal navigation channel at Cedar River Harbor in Cedarville Township, Menominee County, and in-water placement of the dredged material.
Approximately 40,000 cubic yards of sediment will be dredged from the channel. An estimated 10,000 cubic yards of this material is not suitable for use in beach nourishment and will be placed in two 160-acre open water placement sites between Ingallston, Michigan, and Chambers Island, Wisconsin, at a depth of more than 30 meters. The other 30,000 cubic yards of sediment is mostly sand and may be either used for beach nourishment on the Lake Michigan shoreline, beginning at the eastern breakwater of the harbor and extending up to three-quarters of a mile east, or placed in the open water placement sites.
EGLE is reviewing the proposed activity for consistency with Michigan’s Coastal Management Program pursuant to Section 307 of the CZMA.
Written comments must be submitted by 5:00 p.m. November 12, 2026, to:
- Icons.Email Matt Smar at SmarM@Michigan.gov or
- Icons.Edit EGLE, Water Resources Division, P.O. Box 30458, Lansing, Michigan, 48909-7958.
All comments will be provided to the USACE.
About certification under Section 307 of the federal Coastal Zone Management Act
Under Section 307 of the federal Coastal Zone Management Act, EGLE reviews federal agency activities within Michigan’s Coastal Zone Boundary that may impact coastal resources and uses. The purpose of the review is to determine whether the proposed activity complies with a range of Michigan’s resource protection statutes and rules.
Start: October 15, 2026 12:00 PM
End: November 12, 2026 5:00 PM
The Department of Environment, Great Lakes, and Energy (EGLE) has received a Federal Consistency Determination under Section 307 of the Federal Coastal Zone Management Act (CZMA) from the U.S. Army Corps of Engineers (USACE), Detroit District, regarding proposed maintenance dredging of the federal navigation channel at Cedar River Harbor in Cedarville Township, Menominee County, and in-water placement of the dredged material.
Approximately 40,000 cubic yards of sediment will be dredged from the channel. An estimated 10,000 cubic yards of this material is not suitable for use in beach nourishment and will be placed in two 160-acre open water placement sites between Ingallston, Michigan, and Chambers Island, Wisconsin, at a depth of more than 30 meters. The other 30,000 cubic yards of sediment is mostly sand and may be either used for beach nourishment on the Lake Michigan shoreline, beginning at the eastern breakwater of the harbor and extending up to three-quarters of a mile east, or placed in the open water placement sites.
EGLE is reviewing the proposed activity for consistency with Michigan’s Coastal Management Program pursuant to Section 307 of the CZMA.
Written comments must be submitted by 5:00 p.m. November 12, 2026, to:
- Matt Smar at SmarM@Michigan.gov or
- EGLE, Water Resources Division, P.O. Box 30458, Lansing, Michigan, 48909-7958.
All comments will be provided to the USACE.
About certification under Section 307 of the federal Coastal Zone Management Act
Under Section 307 of the federal Coastal Zone Management Act, EGLE reviews federal agency activities within Michigan’s Coastal Zone Boundary that may impact coastal resources and uses. The purpose of the review is to determine whether the proposed activity complies with a range of Michigan’s resource protection statutes and rules.
Learn more about requirements under Section 307