MiSTAR user guide
2.B Class 2 Injection Well Reporting Requirements
PART 8. INJECTION WELLS of the Administrative Rules, R 324.806 - R 324.811, Part 615, Public Acts of 1994 as amended requires operators to file records, report operating conditions, and to provide notifications for Class II injection wells. Operators may now submit all records, reports, and notifications required under Part 8 through the MiSTAR system. By authority of the Supervisor of Wells, the prescribed format to fulfill these requirements is by submitting template data – or – by submitting PDFs as indicated directly below:
Records and reports to be submitted using MiSTAR:
- Monthly/Annual Injection Well Operating Report (EQP 7609) (Rule 324.810 (1)(2)(3)(4))
- Standard Annular Pressure Test (EQP 7606) (Rule 324.806 & 324.808)
- Quarterly Annulus Fill Report (Rule 324.810(7))
- Notification of Loss of Mechanical Integrity (Rule 324.811 (1)(2))
- Scheduling Mechanical Integrity Tests (Rule 324.806 (1)(2)(3) and (Rule 324.808 (1)(2)(3)(4))
Operators should use MiSTAR to submit forms above to fulfill the reporting requirements for Class II.
Records and reporting to be submitted by PDF documents using MiSTAR:
Where electronic templates (EDD) are not feasible for reporting requirements under Part 8, MiSTAR also accepts documents in PDF format. Those documents include:
- Annual Injectate Analysis (Rule 324.810(8))
- Injectate Analysis Other (324.810(8))
- MIT Gauge Records (Rule 324.806(3) and 324.808(3))
- MIT Chart (Rule 324.806(3) and 324.808(3))
- Commercial Sources Quarterly (Rule 324.810(5))
- Commercial Sources New (Rule 324.810(6))
Operators should use MiSTAR to submit PDFs as Document Uploads for the forms listed above to fulfill the reporting requirements for Class II Wells.
Class II reporting requirements
| Report | Frequency | Timing | Comment |
| Injection Data- well not used for secondary recovery | Weekly recording | Monthly reporting | Due by the end of the following month |
| Injection Data secondary recovery well | Monthly recording | Annual reporting | By March 1st of each year for the previous year |
| Commercial disposal well list of sources | Quarterly | Quarterly | Due within 45 days after the end of each quarter |
| Commercial disposal new source | Any time new source is added | Before injection of new fluid | Supervisor approval in letter form required prior to injection from new source. |
| Schedule MIT | At least every 5 years |
No less than 5 days before test |
Operators encouraged to schedule in advance. |
| Results of MIT | After every MIT | Within 14 days after test |
N/A |
| Loss of Mechanical Integrity (MI) |
After every loss of MI |
Within 24 hours, written within 5 days |
Logging related within 5-10 days. |
| Quarterly Annulus fill data |
Quarterly | Quarterly | Due within 45 days after end of each quarter. Rule Authorized wells exempt. |
| Annual Injection analysis |
At least annually |
By March 1 of each year for previous year |
More frequently if changes in source or characteristics of injectate (within 30 days) |
| Permitted max injection pressure exceedance |
Every occurrence |
On the next injection report |
N/A |
| Observed noteworthy anomalies or problems |
Every occurrence |
On any submitted report |
N/A |