Project list view
County | Improvement Category | Project Location | Expected Construction Start | Project Description | Funding Request | Project Status |
---|---|---|---|---|---|---|
Macomb | Building | Wetzel State Recreation Area | Spring 2024 | Replace two vault toilets. | $50,000 | Design/Bid Phase |
Washtenaw | Recreational Structure | Waterloo Recreation Area | Fall 2024 | Resurface both playgrounds at Sugarloaf and Portage Lake campgrounds. | $60,000 | Design/Bid Phase |
Washtenaw | Recreational Structure | Waterloo Recreation Area | Winter 2025 | Replace the Portage Lake fishing pier with more universally accessible features in the Portage Lake Campground. The project will match a federal grant and state funds. | $65,000 | Design/Bid Phase |
Washtenaw | Utility | Waterloo Recreation Area | Fall 2024 | Replace water distribution system at Sugarloaf campground. | $100,000 | Design/Bid Phase |
Muskegon | Utility | Hoffmaster State Park | 2023 or earlier | Improve stormwater systems at campground loop (C) to help alleviate flooding issues. | $100,000 | Construction Started |
Chippewa | Utility | Tahquamenon Falls State Park | Fall 2024 | Replace or upgrade wells at the Upper Falls, including improvements to the wastewater lagoon | $100,000 | Design/Bid Phase |
Cheboygan | Recreational Structure | Cheboygan State Park | Fall 2024 | Replace beams in day-use pavilion. | $100,000 | Design/Bid Phase |
Ionia | Historical Structure | Ionia Recreation Area | Summer 2024 | Renovate and help preserve historic Sessions Schoolhouse building. | $100,000 | Design/Bid Phase |
Washtenaw | Utility | Waterloo Recreation Area | Fall 2024 | Install a water softening system at toilet and shower buildings located in Portage Lake and Sugarloaf Lake campgrounds. | $120,000 | Design/Bid Phase |
Macomb | Parking Lot/Road | Wetzel State Recreation Area | Spring 2024 | Resurface accessible walking path. | $138,125 | Design/Bid Phase |
Macomb | Building | Wetzel State Recreation Area | Spring 2024 | Construct a new picnic pavilion. | $140,000 | Design/Bid Phase |
Barry | Recreational Structure | Yankee Springs Recreation Area | Summer 2024 | Replace fishing pier in Gun Lake day-use area. | $150,000 | Design/Bid Phase |
Iosco | Operational Structure | Tawas Point State Park | Fall 2024 | Stabilize Lake Huron shoreline. | $150,000 | Design/Bid Phase |
Luce | Recreational Structure | Muskallonge State Park | Fall 2024 | Renovate existing stairway used to access Lake Superior. | $175,000 | Design/Bid Phase |
Washtenaw | Building | Pinckney Recreation Area | Fall 2024 | Modernize concession building in Silver Lake day-use area. | $200,000 | Design/Bid Phase |
Muskegon | Utility | Muskegon State Park | Summer 2024 | Install new municipal water distribution lines to maximize efficiencies to existing park facilities. | $200,000 | Design/Bid Phase |
Ionia | Building | Ionia Recreation Area | Summer 2024 | Replace beach house roof in day-use area. | $200,000 | Design/Bid Phase |
Ogemaw | Recreational Structure | Rifle River Recreation Area | To Be Determined | Rehabilitate and replace cable pedestrian suspension bridge and observation tower. | $210,000 | Design/Bid Phase |
Cheboygan | Recreational Structure | Cheboygan State Park | Spring 2024 | Replace Trail Boardwalk throughout wetland. | $225,000 | Design/Bid Phase |
Manistee | Recreational Structure | Orchard Beach State Park | To Be Determined | Evaluate shoreline connection and create enhanced lakeshore viewing. | $245,000 | Design/Bid Phase |
Gogebic | Utility | Lake Gogebic State Park | Spring 2025 | Replace campground stormwater system to alleviate campsite flooding. | $250,000 | Design/Bid Phase |
Muskegon | Recreational Structure | Muskegon State Park | Summer 2024 | Repair Snug Harbor fishing pier and improve accessibility. | $250,000 | Design/Bid Phase |
Oakland | Operational Structure | Bald Mountain Recreation Area | To Be Determined | Repairs to Prince Lake Dam. | $250,000 | Design/Bid Phase |
Charlevoix | Utility | Young State Park | Fall 2024 | Replace two campground sanitary lift stations. | $250,000 | Construction Started |
Chippewa | Parking Lot/Road | Tahquamenon Falls State Park | Fall 2024 | Modernize the Upper and Lower Falls entrance and parking areas. | $275,000 | Design/Bid Phase |
Muskegon | Recreational Structure | Hoffmaster State Park | Spring 2024 | Improve the trail, including the renovation and replacement of boardwalk, overlooks and retaining wall leading to stairway. | $300,000 | Design/Bid Phase |
Muskegon | Utility | Muskegon State Park | Spring 2024 | Replace electrical system at Snug Harbor. | $300,000 | Design/Bid Phase |
Delta | Utility | Fayette Historic State Park | 2023 or earlier | As the second of two phases to upgrade this facility, complete improvements to the park's water treatment plant and well upgrades per EGLE recommendations. | $300,000 | Complete |
Lapeer | Utility | Metamora Hadley Recreation Area | 2023 or earlier | Replace water lines and spigots in the North and South campgrounds. | $350,000 | Design/Bid Phase |
Houghton | Building | Twin Lakes State Park | Summer 2024 | Modernize day-use beach buildings and address sinking foundation. | $350,000 | Design/Bid Phase |
Washtenaw | Building | Waterloo Recreation Area | Spring 2025 | Modernize the Eddy Discovery Center building, including roof replacement, atrium renovations, HVAC installation and carpeting replacement. | $360,000 | Design/Bid Phase |
Livingston | Utility | Island Lake Recreation Area | Summer 2024 | Replace Spring Mill Pond and Kent Lake sanitary lift stations and pumps. | $400,000 | Design/Bid Phase |
Delta | Historical Structure | Fayette Historic State Park | To Be Determined | Reconstruct approximately 300 feet of retaining wall adjacent to the historic charcoal kilns in the park’s historic townsite. The kilns were constructed in the 1800s to produce charcoal for blast furnaces to smelt iron ore. This is the second phase of a historic preservation project in the park. | $400,000 | Design/Bid Phase |
Chippewa | Building | Tahquamenon Falls State Park | Fall 2024 | Modernize Rivermouth maintenance building and employee bathrooms. | $400,000 | Design/Bid Phase |
Van Buren | Recreational Structure | Van Buren State Park | Spring 2025 | Redevelop beach access due to erosion from high lake levels. | $400,000 | Design/Bid Phase |
Washtenaw | Building | Pinckney Recreation Area | Fall 2024 | Replace the Bruin Lake campground garage/workshop. | $450,000 | Design/Bid Phase |
Muskegon | Operational Structure | Hoffmaster State Park | 2023 or earlier | Replace campground sanitation station and sanitary lift station. | $450,000 | Construction Started |
Iosco | Historical Structure | Tawas Point State Park | 2023 or earlier | Repair spalling (water-damaged) brick on the historic Tawas Point Lighthouse. The work will be completed by professionals specializing in historic architecture for maritime buildings. | $455,500 | Construction Started |
Bay | Parking Lot/Road | Bay City State Park | 2023 or earlier | Improve traffic circulation for day-use parking, pedestrian crosswalk, bus parking, playscape drop-off areas, as well as paving and electrical / sewer assessments. | $500,000 | Design/Bid Phase |
Livingston | Parking Lot/Road | Island Lake Recreation Area | Summer 2024 | Modernize and improve contact station to improve bike and vehicular circulation. | $500,000 | Design/Bid Phase |
Washtenaw | Operational Structure | Pinckney Recreation Area | Fall 2024 | Replace the Bruin Lake campground sanitation station. | $500,000 | Design/Bid Phase |
Oakland | Building | Seven Lakes State Park | Summer 2024 | Renovate or replace two Big Seven shelters. | $500,000 | Design/Bid Phase |
Clinton | Utility | Sleepy Hollow State Park | Fall 2024 | Replace headquarters lagoon system and campground sanitation station. | $500,000 | Design/Bid Phase |
Muskegon | Utility | Hoffmaster State Park | 2023 or earlier | Renovate campground water and sewer lines. | $500,000 | Construction Started |
Gogebic | Utility | Lake Gogebic State Park | Spring 2025 | Replace park's water distribution system. | $500,000 | Design/Bid Phase |
Ontonagon | Recreational Structure | Porcupine Mountains Wilderness State Park | Fall 2025 | Replace or rehabilitate the east and west chair lifts. Modernize mountain bike hooks and trails on the hill. | $500,000 | Design/Bid Phase |
Ontonagon | Parking Lot/Road | Porcupine Mountains Wilderness State Park | 2023 or earlier | Enhance and expand Summit Peak parking lot, including clearing, paving, site drainage, pavement markings and accessibility improvements. Repair foundation and renovate composting toilet. | $500,000 | Construction Started |
Schoolcraft | Recreational Structure | Palms Book State Park | Fall 2024 | Replace self-propelled observation raft. | $500,000 | Design/Bid Phase |
Chippewa | Recreational Structure | Tahquamenon Falls State Park | Summer 2025 | Modernize the Brink Overlook stairs, upper viewing area and viewing platform. | $500,000 | Design/Bid Phase |
Presque Isle | Building | Hoeft State Park | Fall 2024 | Replace campground contact station and improve vehicular circulation. | $500,000 | Design/Bid Phase |
Presque Isle | Utility | Hoeft State Park | Fall 2024 | Replace campground sanitation station. | $500,000 | Design/Bid Phase |
Ionia | Utility | Ionia Recreation Area | Fall 2024 | Install iron removal system for toilet and shower building and expand campground sanitation station. | $500,000 | Design/Bid Phase |
Ionia | Utility | Ionia Recreation Area | Fall 2024 | Expand campground drain field. | $500,000 | Design/Bid Phase |
Schoolcraft | Operational Structure | Indian Lake State Park | To Be Determined | Replace campground sanitation station. | $500,000 | Design/Bid Phase |
Livingston | Parking Lot/Road | Island Lake Recreation Area | Summer 2024 | Reconstruct, resurface, chip seal and pave park roads (as needed). | $550,000 | Design/Bid Phase |
Houghton | Parking Lot/Road | Twin Lakes State Park | Spring 2025 | Reconstruct, resurface, chip seal and pave 1 lane mile of park roads at the entrance and parking lots (as needed). | $550,000 | Design/Bid Phase |
Delta | Historical Structure | Fayette Historic State Park | To Be Determined | Structural improvements and aesthetic restoration of the historic town hall and opera house. | $550,000 | Design/Bid Phase |
Schoolcraft | Parking Lot/Road | Palms Book State Park | Fall 2024 | Renovate or reconstruct the parking lot, improve vehicular circulation and site access. | $550,000 | Design/Bid Phase |
Charlevoix | Major Development | Young State Park | Spring 2024 | Replace campground stormwater system, repair or repave campground roads and enhance existing campsites. | $575,000 | Construction Started |
Livingston | Operational Structure | Brighton Recreation Area | Fall 2024 | Repairs to Lower Chilson Pond Dam. | $600,000 | Design/Bid Phase |
Washtenaw | Operational Structure | Waterloo Recreation Area | 2023 or earlier | Repair or replace the stormwater outlet pipe at Lake Winnewana. | $600,000 | Design/Bid Phase |
Barry | Operational Structure | Yankee Springs Recreation Area | Summer 2024 | Repairs to Hall Lake Dam. | $600,000 | Construction Started |
Lapeer | Operational Structure | Metamora Hadley Recreation Area | 2023 or earlier | Repairs to Minnewanna Dam. | $600,000 | Design/Bid Phase |
Clinton | Building | Sleepy Hollow State Park | Fall 2024 | Renovate beach toilet building in day-use area. | $600,000 | Design/Bid Phase |
Delta | Historical Structure | Fayette Historic State Park | To Be Determined | Reconstruct the south wall of the west casting house in the park’s historic townsite – where visitors can take a walking tour of 20 original structures from the once bustling, iron smelting industrial community. This is the first phase of a historic preservation project in the park. | $600,000 | Design/Bid Phase |
Delta | Utility | Fayette Historic State Park | Spring 2024 | Modernize and improve contact station and visitors center, and address critical utilities including the sewage lift station, pressure lines and drain fields in the campground. | $600,000 | Design/Bid Phase |
Ionia | Operational Structure | Ionia Recreation Area | To Be Determined | Repairs to Sessions Lake Dam, including draw-down pump. Replace outlet pipe. | $600,000 | Design/Bid Phase |
Oakland | Operational Structure | Maybury State Park | Spring 2025 | Repairs to Fish Pond Dam. | $600,000 | Design/Bid Phase |
St. Clair | Operational Structure | Algonac State Park | Summer 2024 | Expand the campground sanitation station. | $600,000 | Design/Bid Phase |
Oakland | Operational Structure | Bald Mountain Recreation Area | To Be Determined | Repairs to Lower Trout Lake Dam. | $600,000 | Design/Bid Phase |
Oakland | Operational Structure | Bald Mountain Recreation Area | To Be Determined | Repairs to Upper Trout Lake Dam. | $600,000 | Design/Bid Phase |
Oakland | Operational Structure | Holly Recreation Area | Fall 2024 | Repairs to Heron Dam. | $600,000 | Design/Bid Phase |
Oakland | Operational Structure | Holly Recreation Area | To Be Determined | Repairs to Wildwood Dam. | $600,000 | Design/Bid Phase |
Oakland | Utility | Seven Lakes State Park | Summer 2024 | Replace and modernize campground electrical system. | $603,000 | Design/Bid Phase |
Muskegon | Building | Hoffmaster State Park | Fall 2024 | Renovate Gillette Visitor's Center, including roof, flooring and exhibits. | $650,000 | Design/Bid Phase |
Chippewa | Utility | Tahquamenon Falls State Park | Fall 2024 | Replace or improve well and water distribution system in the Hemlock campground. | $650,000 | Design/Bid Phase |
Presque Isle | Utility | Hoeft State Park | Fall 2024 | Replace water distribution system throughout campground. | $650,000 | Design/Bid Phase |
Montmorency | Utility | Clear Lake State Park | Fall 2024 | Replace water distribution system in campground. | $650,000 | Design/Bid Phase |
Schoolcraft | Operational Structure | Indian Lake State Park | Summer 2024 | Restore park's shoreline through naturalization techniques. | $650,000 | Design/Bid Phase |
Chippewa | Utility | Tahquamenon Falls State Park | Fall 2024 | Replace or upgrade electrical system at the Lower Falls Portage campground. | $675,000 | Design/Bid Phase |
Keweenaw | Utility | Fort Wilkins Historic State Park | Summer 2025 | Replace electrical system in east campground loop. | $680,000 | Design/Bid Phase |
Houghton | Utility | Twin Lakes State Park | Spring 2025 | Replace water distribution system. | $700,000 | Design/Bid Phase |
Chippewa | Utility | Tahquamenon Falls State Park | Fall 2024 | Replace or improve well and water distribution system for the Lower Falls unit. | $700,000 | Design/Bid Phase |
Grand Traverse | Building | Interlochen State Park | Spring 2024 | Modernize and improve accessibility in park's day-use building. | $700,000 | Design/Bid Phase |
Huron | Parking Lot/Road | Port Crescent State Park | 2023 or earlier | Reconstruct, resurface, chip seal and pave day-use roads (as needed), and expand parking lot. | $700,000 | Construction Started |
Van Buren | Utility | Van Buren State Park | Spring 2025 | Rehabilitate park's lagoon. | $700,000 | Design/Bid Phase |
Oakland | Operational Structure | Bald Mountain Recreation Area | To Be Determined | Replace culvert beneath Lower and Upper Trout Lake causeways. | $700,000 | Design/Bid Phase |
Otsego | Utility | Otsego Lake State Park | Fall 2024 | Replace campground sanitary lines and upgrade lift stations. | $750,000 | Design/Bid Phase |
Oakland | Utility | Bald Mountain Recreation Area | Fall 2024 | Replace park's water distribution system. | $750,000 | Design/Bid Phase |
Barry | Building | Yankee Springs Recreation Area | Summer 2024 | Renovate Murphy's Point toilet building and beach toilet and concession building. | $800,000 | Design/Bid Phase |
Ontonagon | Utility | Porcupine Mountains Wilderness State Park | Fall 2025 | Replace and modernize campground electrical system. | $833,000 | Design/Bid Phase |
Ionia | Utility | Ionia Recreation Area | Fall 2024 | Modernize campground electrical system. | $833,000 | Design/Bid Phase |
Crawford | Utility | Hartwick Pines State Park | Fall 2024 | Replace and modernize campground electrical distribution system. | $841,500 | Design/Bid Phase |
Iosco | Parking Lot/Road | Tawas Point State Park | Fall 2025 | Reconstruct, resurface, chip seal and pave day-use roads (as needed). | $850,000 | Design/Bid Phase |
Saginaw | Parking Lot/Road | Saginaw River Headwaters Rec Area | 2023 or earlier | Construct parking areas and a park entrance for a state park already in development on the old General Motors site and nearby landfill – a reclaimed brownfield site on the Saginaw River. The project will include the construction of new concrete bumpers, solar lighting, parking gates that meet Americans with Disabilities Act guidelines, fencing and signage. The park will be jointly managed by the DNR and Saginaw County. This project is considered one of the final steps in establishing the new state park. | $867,000 | Complete |
Keweenaw | Historical Structure | Fort Wilkins Historic State Park | Summer 2025 | Restore and help preserve historic fort complex, including replacement of stockade fence and glazing on all windows, construct new roofs on officer quarters, replacement of siding as needed on officer quarters, repair foundation and paint. | $870,000 | Design/Bid Phase |
Muskegon | Building | Hoffmaster State Park | 2023 or earlier | Implement sustainable contraction by replacing two toilet buildings with one. | $900,000 | Construction Started |
Muskegon | Parking Lot/Road | Muskegon State Park | To Be Determined | Reconstruct, resurface, chip seal and pave park roads (as needed). | $900,000 | Design/Bid Phase |
Gogebic | Utility | Lake Gogebic State Park | Spring 2025 | Modernize and replace campground electrical system. | $901,000 | Design/Bid Phase |
Oakland | Utility | Pontiac Lake Recreation Area | Fall 2024 | Replace park's water and sewer distribution systems. | $1,000,000 | Design/Bid Phase |
Washtenaw | Parking Lot/Road | Pinckney Recreation Area | Fall 2024 | Reconstruct, resurface, chip seal and pave Bruin Lake campground entrance road and campground loops (as needed). Improve campground drainage. | $1,000,000 | Design/Bid Phase |
Washtenaw | Building | Pinckney Recreation Area | Fall 2024 | Renovate or replace Bruin Lake north campground toilet and shower building. | $1,000,000 | Design/Bid Phase |
Barry | Utility | Yankee Springs Recreation Area | Summer 2024 | Improve storm water system to resolve flooding issues at Gun Lake campground. Replace park's aging sewer lines. | $1,000,000 | Design/Bid Phase |
Clinton | Building | Sleepy Hollow State Park | Fall 2024 | Renovate or replace two campground toilet and shower buildings. | $1,000,000 | Design/Bid Phase |
Gogebic | Utility | Lake Gogebic State Park | Summer 2025 | Modernize and improve park's sanitary sewer system. | $1,000,000 | Design/Bid Phase |
Ontonagon | Utility | Porcupine Mountains Wilderness State Park | Spring 2024 | Modernize the parks' sanitary sewer system | $1,000,000 | Design/Bid Phase |
Delta | Major Development | Fayette Historic State Park | Spring 2024 | Modernize visitor center parking lot and building access and improve accessibility to interior and bathrooms. | $1,000,000 | Design/Bid Phase |
Iron | Utility | Bewabic State Park | Summer 2025 | Repair or replace on-site wastewater treatment facility for campground toilet and shower buildings and sanitation station | $1,000,000 | Design/Bid Phase |
Luce | Building | Muskallonge State Park | 2023 or earlier | Renovate or replace the toilet and shower building in the west campground loop. | $1,000,000 | Construction Started |
Luce | Parking Lot/Road | Muskallonge State Park | Fall 2024 | Reconstruct, resurface, chip seal and pave park roads (as needed). | $1,000,000 | Design/Bid Phase |
Chippewa | Building | Tahquamenon Falls State Park | 2023 or earlier | Replace or renovate the toilet and shower building in the Lower Falls Hemlock campground. | $1,000,000 | Construction Started |
Cheboygan | Building | Cheboygan State Park | Fall 2024 | Renovate or replace campground toilet and shower building. | $1,000,000 | Design/Bid Phase |
Wexford | Parking Lot/Road | Mitchell State Park | 2023 or earlier | Reconstruct, resurface, chip seal and pave campground roads (as needed). | $1,000,000 | Complete |
Huron | Building | Port Crescent State Park | 2023 or earlier | Renovate and modernize day-use beach house, including water, sewer and electrical systems. | $1,000,000 | Design/Bid Phase |
Otsego | Building | Otsego Lake State Park | Fall 2024 | Renovate or replace campground toilet and shower building. | $1,000,000 | Design/Bid Phase |
Keweenaw | Building | Fort Wilkins Historic State Park | Summer 2024 | Replace toilet and shower building in west campground. | $1,000,000 | Design/Bid Phase |
St. Clair | Major Development | Algonac State Park | Spring 2024 | Implement sustainable contraction by replacing the toilet and shower building with full hook-up campsites in the north section of the Riverfront Campground. | $1,000,000 | Design/Bid Phase |
Oakland | Building | Bald Mountain Recreation Area | Fall 2024 | Renovate or replace the beach day-use area toilet building. | $1,000,000 | Design/Bid Phase |
Crawford | Historical Structure | Hartwick Pines State Park | Spring 2025 | Renovate and help preserve historic Memorial Building. | $1,000,000 | Design/Bid Phase |
Ontonagon | Building | Porcupine Mountains Wilderness State Park | Fall 2024 | Modernize visitor center, including accessibility enhancements. | $1,050,000 | Design/Bid Phase |
Kalamazoo | Utility | Fort Custer Recreation Area | Spring 2024 | Modernize or replace electrical system in west campground loop. | $1,062,500 | Construction Started |
Muskegon | Operational Structure | Muskegon State Park | Spring 2025 | Modernize or replace campground sanitation station. | $1,100,000 | Design/Bid Phase |
Luce | Utility | Muskallonge State Park | Fall 2024 | Replace or modernize campground sanitary distribution system, lift station and sewage lagoon. | $1,100,000 | Design/Bid Phase |
Mason | Parking Lot/Road | Ludington State Park | Fall 2024 | Reconstruct, resurface, chip seal and pave campground roads and Hamlin Lake day-use parking lots (as needed). | $1,114,500 | Design/Bid Phase |
Livingston | Parking Lot/Road | Brighton Recreation Area | Fall 2024 | Reconstruct, resurface, chip seal and pave 14 lane miles of park roads (as needed). | $1,150,000 | Design/Bid Phase |
Oakland | Building | Pontiac Lake Recreation Area | To Be Determined | Renovate or replace concession and bathroom buildings in the day-use area. | $1,200,000 | Design/Bid Phase |
Wexford | Building | Mitchell State Park | Fall 2024 | Renovate or replace the day-use toilet and shelter building. | $1,200,000 | Design/Bid Phase |
Livingston | Utility | Brighton Recreation Area | Fall 2024 | Replace and modernize campground electrical system. | $1,224,000 | Design/Bid Phase |
Grand Traverse | Utility | Interlochen State Park | Spring 2024 | Replace sanitary lift station, force main to the wastewater treatment facility, and underground water & sewer distribution system in a multi-phased approach. | $1,225,000 | Design/Bid Phase |
Grand Traverse | Major Development | Traverse City State Park | Spring 2026 | Redevelop day-use area vehicle and pedestrian access. | $1,225,000 | Design/Bid Phase |
Washtenaw | Parking Lot/Road | Pinckney Recreation Area | Fall 2024 | Reconstruct, resurface, chip seal and pave (as needed) campground and day-use area roads. | $1,250,000 | Design/Bid Phase |
Barry | Parking Lot/Road | Yankee Springs Recreation Area | Summer 2024 | Reconstruct, resurface, chip seal and pave campground roads (as needed). | $1,250,000 | Design/Bid Phase |
Lapeer | Utility | Metamora Hadley Recreation Area | 2023 or earlier | Replace aged sewer treatment system at headquarters and shelter area. | $1,250,000 | Design/Bid Phase |
Crawford | Operational Structure | Hartwick Pines State Park | Spring 2025 | Modernize and improve Hartwick Pines Visitor Center. | $1,250,000 | Design/Bid Phase |
Mason | Parking Lot/Road | Ludington State Park | Fall 2024 | Expand and improve day-use parking lot, vehicular and pedestrian circulation. | $1,300,000 | Design/Bid Phase |
Iron | Building | Bewabic State Park | Summer 2025 | Replace two toilet and shower buildings with one centralized toilet and shower building. | $1,300,000 | Design/Bid Phase |
Ogemaw | Utility | Rifle River Recreation Area | Fall 2024 | Replace the campground's sanitary sewer line and lift station. Modernize electrical system. | $1,300,000 | Design/Bid Phase |
Manistee | Trails | Betsie Valley Trail | To Be Determined | Rehabilitate existing trail bridge, including decking and structural repairs. | $1,300,000 | Design/Bid Phase |
Otsego | Utility | Otsego Lake State Park | Fall 2024 | Upgrade electrical system in campground. | $1,317,500 | Design/Bid Phase |
Washtenaw | Parking Lot/Road | Waterloo Recreation Area | Fall 2024 | Reconstruct, resurface, chip seal and pave 20 lane miles of park roads (as needed). | $1,400,000 | Design/Bid Phase |
Ontonagon | Historical Structure | Porcupine Mountains Wilderness State Park | 2023 or earlier | Renovate and help preserve the Kaug Wudjoo modern lodge, staff quarters, mechanic's shop, carpenter's shop and fire barn. Renovations include the construction and replacement of new roofs and siding, as well as enhancements to accessibility features. Utility and structural upgrades also are included in ongoing historic preservation efforts. | $1,400,000 | Construction Started |
Ontonagon | Parking Lot/Road | Porcupine Mountains Wilderness State Park | 2023 or earlier | Reconstruct, resurface, chip seal and pave park roads (as needed) at the Visitor Center and park headquarters area. | $1,400,000 | Complete |
Iron | Parking Lot/Road | Bewabic State Park | Summer 2025 | Reconstruct, resurface, chip seal and pave park roads (as needed). | $1,400,000 | Design/Bid Phase |
Ogemaw | Major Development | Rifle River Recreation Area | Spring 2024 | Reconstruct, resurface, chip seal and pave day-use roads (as needed), replace and modernize water and electrical distribution systems in day-use toilet building. | $1,400,000 | Design/Bid Phase |
Bay | Building | Bay City State Park | 2023 or earlier | Renovate the interior and exterior of the Saginaw Bay Visitors Center. Renovations include the reception area, exhibit hall, roof and siding, and the addition of a new science lab. General improvements include enhancements to make the park more accessible for all visitors. | $1,500,000 | Complete |
Livingston | Parking Lot/Road | Island Lake Recreation Area | Summer 2024 | Reconstruct, resurface, chip seal and pave entrance roads and parking lots at Kent Lake (as needed). | $1,500,000 | Design/Bid Phase |
Ionia | Parking Lot/Road | Ionia Recreation Area | Fall 2024 | Reconstruct, resurface, chip seal and pave campground and day-use area roads (as needed). | $1,500,000 | Design/Bid Phase |
Grand Traverse | Utility | Interlochen State Park | 2023 or earlier | Modernize and improve electrical system in the south campground. | $1,640,500 | Complete |
Iosco | Utility | Tawas Point State Park | 2023 or earlier | Replace and modernize campground electrical system. | $1,640,500 | Design/Bid Phase |
Barry | Utility | Yankee Springs Recreation Area | Summer 2024 | Modernize electrical system at Gun Lake campground. | $1,700,000 | Design/Bid Phase |
Lapeer | Utility | Metamora Hadley Recreation Area | 2023 or earlier | Replace campground electrical system. | $1,710,500 | Design/Bid Phase |
Houghton | Major Development | Twin Lakes State Park | Spring 2025 | Renovate or replace campground toilet and shower building and associated below ground utilities and on-site wastewater treatment. | $1,800,000 | Design/Bid Phase |
Mason | Recreational Structure | Ludington State Park | Fall 2024 | Reconstruct deteriorated section and improve access and accessibility of the Skyline Trail. | $1,850,000 | Design/Bid Phase |
Kalamazoo | Building | Fort Custer Recreation Area | 2023 or earlier | Replace two existing campground toilet and shower buildings. | $2,000,000 | Construction Started |
Lapeer | Parking Lot/Road | Metamora Hadley Recreation Area | 2023 or earlier | Reconstruct, resurface, chip seal and pave roads in the north and south campgrounds (as needed). | $2,000,000 | Design/Bid Phase |
Oakland | Parking Lot/Road | Seven Lakes State Park | Summer 2024 | Reconstruct, resurface, chip seal and pave park roads (as needed). | $2,000,000 | Design/Bid Phase |
Presque Isle | Building | Hoeft State Park | Fall 2024 | Renovate and replace toilet and shower buildings in the east and west campgrounds. | $2,000,000 | Design/Bid Phase |
Presque Isle | Utility | Hoeft State Park | Fall 2024 | Replace park's sanitary system and sewage lagoon. | $2,000,000 | Design/Bid Phase |
Montmorency | Building | Clear Lake State Park | Fall 2024 | Renovate or replace two toilet and shower buildings. | $2,000,000 | Design/Bid Phase |
Montmorency | Utility | Clear Lake State Park | Fall 2024 | Modernize campground sanitary system and lift station. | $2,000,000 | Design/Bid Phase |
Mackinac | Building | Straits State Park | 2023 or earlier | Replace the two upper campground toilet and shower buildings, which will mirror finish details from newly constructed buildings in the park’s lower campground. | $2,000,000 | Complete |
Charlevoix | Building | Young State Park | Spring 2024 | Renovate or replace two toilet and shower buildings in the Spruce Campground. | $2,000,000 | Construction Started |
Clinton | Parking Lot/Road | Sleepy Hollow State Park | Fall 2024 | Reconstruct, resurface, chip seal and pave 5 lane miles of road between the picnic shelter area, campground loops and day-use area (as needed). | $2,250,000 | Design/Bid Phase |
Bay | Utility | Bay City State Park | 2023 or earlier | Replace water supply lines that service the headquarters, campground and sanitation station. Modernize and improve electrical and sanitary systems. | $2,350,000 | Construction Started |
Grand Traverse | Major Development | Traverse City State Park | Fall 2025 | Improve park entrance, contact station, sanitation station, vehicular circulation and accessibility. | $2,425,000 | Design/Bid Phase |
Muskegon | Building | Muskegon State Park | Fall 2024 | Modernize beach building in day-use area. | $2,500,000 | Design/Bid Phase |
Manistee | Building | Orchard Beach State Park | Summer 2025 | Renovate or replace two toilet and shower buildings in campground. | $2,500,000 | Design/Bid Phase |
St. Clair | Parking Lot/Road | Algonac State Park | Summer 2024 | Reconstruct, resurface, chip seal and pave day-use and campground roads (as needed). | $2,500,000 | Design/Bid Phase |
Cheboygan | Utility | Cheboygan State Park | 2023 or earlier | Construct upgraded electrical and water distribution systems in the modern campground. The project includes the replacement of below-ground water mains and electrical conduit, meters and distribution panels, as well as upgraded jug fillers and electrical pedestals. | $2,750,000 | Construction Started |
Grand Traverse | Building | Traverse City State Park | Fall 2025 | Design and construct new park headquarter building/complex. | $2,800,000 | Design/Bid Phase |
Schoolcraft | Major Development | Indian Lake State Park | To Be Determined | Renovate or replace three campground toilet and shower buildings, including the abandonment of two drain fields and the expansion of the current sewage lagoon to service the buildings. Construct a new well and water line to support the proposed toilet and shower building. | $3,000,000 | Design/Bid Phase |
Huron | Utility | Port Crescent State Park | Winter 2024 | Replace and modernize existing water, sewer, and electrical systems throughout the park and replace or repair campground roads. | $3,250,000 | Design/Bid Phase |
Muskegon | Parking Lot/Road | Hoffmaster State Park | 2023 or earlier | Reconstruct, resurface, chip seal and pave campground and day-use area parking (as needed). | $3,500,000 | Construction Started |
Monroe | Trails | Sterling State Park's Heritage Trail | Winter 2025 | Stabilize the riverbank in preparation for trail resurfacing. This is the first phase of an improvement project that will leverage federal funding to improve the slowly eroding embankment between the river and marsh lagoon. An additional $3.575 million is proposed in later phases for additional investments in erosion control and to replace the trail. | $4,000,000 | Design/Bid Phase |
Wayne | Building | Belle Isle Park | 2023 or earlier | Replace Casino roof and repair basement structural issues. | $4,750,000 | Construction Started |
Van Buren | Trails | Kal-Haven Trail State Park | 2023 or earlier | Resurface trail and improve bridges along the trail. | $6,000,000 | Construction Started |
Muskegon | Trails | Musketawa Trail | Spring 2024 | Replace bridges and culverts and resurface portions of the trail. | $6,500,000 | Design/Bid Phase |
Wayne | Building | Belle Isle Park | 2023 or earlier | Replace the glass and upper steel trusses that support the Anna Scripps Whitcomb Conservatory dome (also known as the Palm House). This project is the second and final phase of a comprehensive plan to revitalize one of the nation’s oldest turn-of-the-century glass houses still in existence. | $7,500,000 | Construction Started |
Mecosta | Trails | Fred Meijer White Pine Trail State Park | 2023 or earlier | Pave remaining 21 miles of the 92-mile-long trail and replace two culverts. | $9,600,000 | Construction Started |
Genesee | Major Development | New Flint River State Park | To Be Determined | The new state park – in the Chevy Commons on the former site of the Chevrolet plant – will be a key element of the redevelopment of the Flint Riverfront area. It will be the first state park in Genesee County. | $30,200,000 | Design/Bid Phase |
Houghton | Utility | McLain State Park | Summer 2024 | On-site wastewater treatment lagoon rehabilitation | $1,000,000 | Design/Bid Phase |
Crawford | Historical Structure | Hartwick Pines State Park | 2023 or earlier | Replace Bunkhouse and Chapel building roofs |
$350,000 | Complete |
Wayne | Building | Belle Isle Park | Fall 2025 | New HVAC system for Belle Isle Aquarium, as well as facility and site drainage improvements. | $10,000,000 | Proposed |
Wayne | Building | Belle Isle Park | Summer 2025 | ADA accessibility improvements, building stabilization and facility development planning for the Anna Scripps Whitcomb Conservatory and Belle Isle Aquarium | $1,250,000 | Proposed |
Wayne | Recreational Structure | Belle Isle Park | Spring 2025 | Removal of dilapidated structures and development of recreational green space in the former Belle Isle Zoo complex. | $1,000,000 | Proposed |
Wayne | Recreational Structure | Belle Isle Park | Spring 2025 | Address health, safety and welfare concerns at the Belle Isle Boathouse | $2,000,000 | Proposed |
Wayne | Building | Belle Isle Park | Summer 2024 | Park-wide abatement of hazardous materials and general structural repairs | $2,000,000 | Proposed |
Wayne | Historical Structure | Belle Isle Park | Summer 2025 | Repair, maintenance and structural stablization of the James Scott Memorial Fountain main basin and stairs. | $6,000,000 | Proposed |
Wayne | Parking Lot/Road | Belle Isle Park | Summer 2024 | Implementation of wayfinding signage recommendations from the recently completed mobility study | $400,000 | Proposed |
Wayne | Study | Belle Isle Park | Spring 2024 | Park-wide Master Plan | $350,000 | Proposed |