County Improvement Category Project Location Expected Construction Start Project Description Funding Request Project Status
Macomb Building Wetzel State Recreation Area Spring 2024 Replace two vault toilets. $50,000 Design/Bid Phase
Washtenaw Recreational Structure Waterloo Recreation Area Fall 2024 Resurface both playgrounds at Sugarloaf and Portage Lake campgrounds. $60,000 Design/Bid Phase
Washtenaw Recreational Structure Waterloo Recreation Area Winter 2025 Replace the Portage Lake fishing pier with more universally accessible features in the Portage Lake Campground. The project will match a federal grant and state funds. $65,000 Design/Bid Phase
Washtenaw Utility Waterloo Recreation Area Fall 2024 Replace water distribution system at Sugarloaf campground. $100,000 Design/Bid Phase
Muskegon Utility Hoffmaster State Park 2023 or earlier Improve stormwater systems at campground loop (C) to help alleviate flooding issues. $100,000 Construction Started
Chippewa Utility Tahquamenon Falls State Park Fall 2024 Replace or upgrade wells at the Upper Falls, including improvements to the wastewater lagoon $100,000 Design/Bid Phase
Cheboygan Recreational Structure Cheboygan State Park Fall 2024 Replace beams in day-use pavilion. $100,000 Design/Bid Phase
Ionia Historical Structure Ionia Recreation Area Summer 2024 Renovate and help preserve historic Sessions Schoolhouse building. $100,000 Design/Bid Phase
Washtenaw Utility Waterloo Recreation Area Fall 2024 Install a water softening system at toilet and shower buildings located in Portage Lake and Sugarloaf Lake campgrounds. $120,000 Design/Bid Phase
Macomb Parking Lot/Road Wetzel State Recreation Area Spring 2024 Resurface accessible walking path. $138,125 Design/Bid Phase
Macomb Building Wetzel State Recreation Area Spring 2024 Construct a new picnic pavilion. $140,000 Design/Bid Phase
Barry Recreational Structure Yankee Springs Recreation Area Summer 2024 Replace fishing pier in Gun Lake day-use area. $150,000 Design/Bid Phase
Iosco Operational Structure Tawas Point State Park Fall 2024 Stabilize Lake Huron shoreline. $150,000 Design/Bid Phase
Luce Recreational Structure Muskallonge State Park Fall 2024 Renovate existing stairway used to access Lake Superior. $175,000 Design/Bid Phase
Washtenaw Building Pinckney Recreation Area Fall 2024 Modernize concession building in Silver Lake day-use area. $200,000 Design/Bid Phase
Muskegon Utility Muskegon State Park Summer 2024 Install new municipal water distribution lines to maximize efficiencies to existing park facilities. $200,000 Design/Bid Phase
Ionia Building Ionia Recreation Area Summer 2024 Replace beach house roof in day-use area. $200,000 Design/Bid Phase
Ogemaw Recreational Structure Rifle River Recreation Area To Be Determined Rehabilitate and replace cable pedestrian suspension bridge and observation tower. $210,000 Design/Bid Phase
Cheboygan Recreational Structure Cheboygan State Park Spring 2024 Replace Trail Boardwalk throughout wetland. $225,000 Design/Bid Phase
Manistee Recreational Structure Orchard Beach State Park To Be Determined Evaluate shoreline connection and create enhanced lakeshore viewing. $245,000 Design/Bid Phase
Gogebic Utility Lake Gogebic State Park Spring 2025 Replace campground stormwater system to alleviate campsite flooding. $250,000 Design/Bid Phase
Muskegon Recreational Structure Muskegon State Park Summer 2024 Repair Snug Harbor fishing pier and improve accessibility. $250,000 Design/Bid Phase
Oakland Operational Structure Bald Mountain Recreation Area To Be Determined Repairs to Prince Lake Dam. $250,000 Design/Bid Phase
Charlevoix Utility Young State Park Fall 2024 Replace two campground sanitary lift stations. $250,000 Construction Started
Chippewa Parking Lot/Road Tahquamenon Falls State Park Fall 2024 Modernize the Upper and Lower Falls entrance and parking areas. $275,000 Design/Bid Phase
Muskegon Recreational Structure Hoffmaster State Park Spring 2024 Improve the trail, including the renovation and replacement of boardwalk, overlooks and retaining wall leading to stairway. $300,000 Design/Bid Phase
Muskegon Utility Muskegon State Park Spring 2024 Replace electrical system at Snug Harbor. $300,000 Design/Bid Phase
Delta Utility Fayette Historic State Park 2023 or earlier As the second of two phases to upgrade this facility, complete improvements to the park's water treatment plant and well upgrades per EGLE recommendations. $300,000 Complete
Lapeer Utility Metamora Hadley Recreation Area 2023 or earlier Replace water lines and spigots in the North and South campgrounds. $350,000 Design/Bid Phase
Houghton Building Twin Lakes State Park Summer 2024 Modernize day-use beach buildings and address sinking foundation. $350,000 Design/Bid Phase
Washtenaw Building Waterloo Recreation Area Spring 2025 Modernize the Eddy Discovery Center building, including roof replacement, atrium renovations, HVAC installation and carpeting replacement. $360,000 Design/Bid Phase
Livingston Utility Island Lake Recreation Area Summer 2024 Replace Spring Mill Pond and Kent Lake sanitary lift stations and pumps. $400,000 Design/Bid Phase
Delta Historical Structure Fayette Historic State Park To Be Determined Reconstruct approximately 300 feet of retaining wall adjacent to the historic charcoal kilns in the park’s historic townsite. The kilns were constructed in the 1800s to produce charcoal for blast furnaces to smelt iron ore. This is the second phase of a historic preservation project in the park. $400,000 Design/Bid Phase
Chippewa Building Tahquamenon Falls State Park Fall 2024 Modernize Rivermouth maintenance building and employee bathrooms. $400,000 Design/Bid Phase
Van Buren Recreational Structure Van Buren State Park Spring 2025 Redevelop beach access due to erosion from high lake levels. $400,000 Design/Bid Phase
Washtenaw Building Pinckney Recreation Area Fall 2024 Replace the Bruin Lake campground garage/workshop. $450,000 Design/Bid Phase
Muskegon Operational Structure Hoffmaster State Park 2023 or earlier Replace campground sanitation station and sanitary lift station. $450,000 Construction Started
Iosco Historical Structure Tawas Point State Park 2023 or earlier Repair spalling (water-damaged) brick on the historic Tawas Point Lighthouse. The work will be completed by professionals specializing in historic architecture for maritime buildings. $455,500 Construction Started
Bay Parking Lot/Road Bay City State Park 2023 or earlier Improve traffic circulation for day-use parking, pedestrian crosswalk, bus parking, playscape drop-off areas, as well as paving and electrical / sewer assessments. $500,000 Design/Bid Phase
Livingston Parking Lot/Road Island Lake Recreation Area Summer 2024 Modernize and improve contact station to improve bike and vehicular circulation. $500,000 Design/Bid Phase
Washtenaw Operational Structure Pinckney Recreation Area Fall 2024 Replace the Bruin Lake campground sanitation station. $500,000 Design/Bid Phase
Oakland Building Seven Lakes State Park Summer 2024 Renovate or replace two Big Seven shelters. $500,000 Design/Bid Phase
Clinton Utility Sleepy Hollow State Park Fall 2024 Replace headquarters lagoon system and campground sanitation station. $500,000 Design/Bid Phase
Muskegon Utility Hoffmaster State Park 2023 or earlier Renovate campground water and sewer lines. $500,000 Construction Started
Gogebic Utility Lake Gogebic State Park Spring 2025 Replace park's water distribution system. $500,000 Design/Bid Phase
Ontonagon Recreational Structure Porcupine Mountains Wilderness State Park Fall 2025 Replace or rehabilitate the east and west chair lifts. Modernize mountain bike hooks and trails on the hill. $500,000 Design/Bid Phase
Ontonagon Parking Lot/Road Porcupine Mountains Wilderness State Park 2023 or earlier Enhance and expand Summit Peak parking lot, including clearing, paving, site drainage, pavement markings and accessibility improvements. Repair foundation and renovate composting toilet. $500,000 Construction Started
Schoolcraft Recreational Structure Palms Book State Park Fall 2024 Replace self-propelled observation raft. $500,000 Design/Bid Phase
Chippewa Recreational Structure Tahquamenon Falls State Park Summer 2025 Modernize the Brink Overlook stairs, upper viewing area and viewing platform. $500,000 Design/Bid Phase
Presque Isle Building Hoeft State Park Fall 2024 Replace campground contact station and improve vehicular circulation. $500,000 Design/Bid Phase
Presque Isle Utility Hoeft State Park Fall 2024 Replace campground sanitation station. $500,000 Design/Bid Phase
Ionia Utility Ionia Recreation Area Fall 2024 Install iron removal system for toilet and shower building and expand campground sanitation station. $500,000 Design/Bid Phase
Ionia Utility Ionia Recreation Area Fall 2024 Expand campground drain field. $500,000 Design/Bid Phase
Schoolcraft Operational Structure Indian Lake State Park To Be Determined Replace campground sanitation station. $500,000 Design/Bid Phase
Livingston Parking Lot/Road Island Lake Recreation Area Summer 2024 Reconstruct, resurface, chip seal and pave park roads (as needed). $550,000 Design/Bid Phase
Houghton Parking Lot/Road Twin Lakes State Park Spring 2025 Reconstruct, resurface, chip seal and pave 1 lane mile of park roads at the entrance and parking lots (as needed). $550,000 Design/Bid Phase
Delta Historical Structure Fayette Historic State Park To Be Determined Structural improvements and aesthetic restoration of the historic town hall and opera house. $550,000 Design/Bid Phase
Schoolcraft Parking Lot/Road Palms Book State Park Fall 2024 Renovate or reconstruct the parking lot, improve vehicular circulation and site access. $550,000 Design/Bid Phase
Charlevoix Major Development Young State Park Spring 2024 Replace campground stormwater system, repair or repave campground roads and enhance existing campsites. $575,000 Construction Started
Livingston Operational Structure Brighton Recreation Area Fall 2024 Repairs to Lower Chilson Pond Dam. $600,000 Design/Bid Phase
Washtenaw Operational Structure Waterloo Recreation Area 2023 or earlier Repair or replace the stormwater outlet pipe at Lake Winnewana. $600,000 Design/Bid Phase
Barry Operational Structure Yankee Springs Recreation Area Summer 2024 Repairs to Hall Lake Dam. $600,000 Construction Started
Lapeer Operational Structure Metamora Hadley Recreation Area 2023 or earlier Repairs to Minnewanna Dam. $600,000 Design/Bid Phase
Clinton Building Sleepy Hollow State Park Fall 2024 Renovate beach toilet building in day-use area. $600,000 Design/Bid Phase
Delta Historical Structure Fayette Historic State Park To Be Determined Reconstruct the south wall of the west casting house in the park’s historic townsite – where visitors can take a walking tour of 20 original structures from the once bustling, iron smelting industrial community. This is the first phase of a historic preservation project in the park. $600,000 Design/Bid Phase
Delta Utility Fayette Historic State Park Spring 2024 Modernize and improve contact station and visitors center, and address critical utilities including the sewage lift station, pressure lines and drain fields in the campground. $600,000 Design/Bid Phase
Ionia Operational Structure Ionia Recreation Area To Be Determined Repairs to Sessions Lake Dam, including draw-down pump. Replace outlet pipe. $600,000 Design/Bid Phase
Oakland Operational Structure Maybury State Park Spring 2025 Repairs to Fish Pond Dam. $600,000 Design/Bid Phase
St. Clair Operational Structure Algonac State Park Summer 2024 Expand the campground sanitation station. $600,000 Design/Bid Phase
Oakland Operational Structure Bald Mountain Recreation Area To Be Determined Repairs to Lower Trout Lake Dam. $600,000 Design/Bid Phase
Oakland Operational Structure Bald Mountain Recreation Area To Be Determined Repairs to Upper Trout Lake Dam. $600,000 Design/Bid Phase
Oakland Operational Structure Holly Recreation Area Fall 2024 Repairs to Heron Dam. $600,000 Design/Bid Phase
Oakland Operational Structure Holly Recreation Area To Be Determined Repairs to Wildwood Dam. $600,000 Design/Bid Phase
Oakland Utility Seven Lakes State Park Summer 2024 Replace and modernize campground electrical system. $603,000 Design/Bid Phase
Muskegon Building Hoffmaster State Park Fall 2024 Renovate Gillette Visitor's Center, including roof, flooring and exhibits. $650,000 Design/Bid Phase
Chippewa Utility Tahquamenon Falls State Park Fall 2024 Replace or improve well and water distribution system in the Hemlock campground. $650,000 Design/Bid Phase
Presque Isle Utility Hoeft State Park Fall 2024 Replace water distribution system throughout campground. $650,000 Design/Bid Phase
Montmorency Utility Clear Lake State Park Fall 2024 Replace water distribution system in campground. $650,000 Design/Bid Phase
Schoolcraft Operational Structure Indian Lake State Park Summer 2024 Restore park's shoreline through naturalization techniques. $650,000 Design/Bid Phase
Chippewa Utility Tahquamenon Falls State Park Fall 2024 Replace or upgrade electrical system at the Lower Falls Portage campground. $675,000 Design/Bid Phase
Keweenaw Utility Fort Wilkins Historic State Park Summer 2025 Replace electrical system in east campground loop. $680,000 Design/Bid Phase
Houghton Utility Twin Lakes State Park Spring 2025 Replace water distribution system. $700,000 Design/Bid Phase
Chippewa Utility Tahquamenon Falls State Park Fall 2024 Replace or improve well and water distribution system for the Lower Falls unit. $700,000 Design/Bid Phase
Grand Traverse Building Interlochen State Park Spring 2024 Modernize and improve accessibility in park's day-use building. $700,000 Design/Bid Phase
Huron Parking Lot/Road Port Crescent State Park 2023 or earlier Reconstruct, resurface, chip seal and pave day-use roads (as needed), and expand parking lot. $700,000 Construction Started
Van Buren Utility Van Buren State Park Spring 2025 Rehabilitate park's lagoon. $700,000 Design/Bid Phase
Oakland Operational Structure Bald Mountain Recreation Area To Be Determined Replace culvert beneath Lower and Upper Trout Lake causeways. $700,000 Design/Bid Phase
Otsego Utility Otsego Lake State Park Fall 2024 Replace campground sanitary lines and upgrade lift stations. $750,000 Design/Bid Phase
Oakland Utility Bald Mountain Recreation Area Fall 2024 Replace park's water distribution system. $750,000 Design/Bid Phase
Barry Building Yankee Springs Recreation Area Summer 2024 Renovate Murphy's Point toilet building and beach toilet and concession building. $800,000 Design/Bid Phase
Ontonagon Utility Porcupine Mountains Wilderness State Park Fall 2025 Replace and modernize campground electrical system. $833,000 Design/Bid Phase
Ionia Utility Ionia Recreation Area Fall 2024 Modernize campground electrical system. $833,000 Design/Bid Phase
Crawford Utility Hartwick Pines State Park Fall 2024 Replace and modernize campground electrical distribution system. $841,500 Design/Bid Phase
Iosco Parking Lot/Road Tawas Point State Park Fall 2025 Reconstruct, resurface, chip seal and pave day-use roads (as needed). $850,000 Design/Bid Phase
Saginaw Parking Lot/Road Saginaw River Headwaters Rec Area 2023 or earlier Construct parking areas and a park entrance for a state park already in development on the old General Motors site and nearby landfill – a reclaimed brownfield site on the Saginaw River. The project will include the construction of new concrete bumpers, solar lighting, parking gates that meet Americans with Disabilities Act guidelines, fencing and signage. The park will be jointly managed by the DNR and Saginaw County. This project is considered one of the final steps in establishing the new state park. $867,000 Complete
Keweenaw Historical Structure Fort Wilkins Historic State Park Summer 2025 Restore and help preserve historic fort complex, including replacement of stockade fence and glazing on all windows, construct new roofs on officer quarters, replacement of siding as needed on officer quarters, repair foundation and paint. $870,000 Design/Bid Phase
Muskegon Building Hoffmaster State Park 2023 or earlier Implement sustainable contraction by replacing two toilet buildings with one. $900,000 Construction Started
Muskegon Parking Lot/Road Muskegon State Park To Be Determined Reconstruct, resurface, chip seal and pave park roads (as needed). $900,000 Design/Bid Phase
Gogebic Utility Lake Gogebic State Park Spring 2025 Modernize and replace campground electrical system. $901,000 Design/Bid Phase
Oakland Utility Pontiac Lake Recreation Area Fall 2024 Replace park's water and sewer distribution systems. $1,000,000 Design/Bid Phase
Washtenaw Parking Lot/Road Pinckney Recreation Area Fall 2024 Reconstruct, resurface, chip seal and pave Bruin Lake campground entrance road and campground loops (as needed). Improve campground drainage. $1,000,000 Design/Bid Phase
Washtenaw Building Pinckney Recreation Area Fall 2024 Renovate or replace Bruin Lake north campground toilet and shower building. $1,000,000 Design/Bid Phase
Barry Utility Yankee Springs Recreation Area Summer 2024 Improve storm water system to resolve flooding issues at Gun Lake campground. Replace park's aging sewer lines. $1,000,000 Design/Bid Phase
Clinton Building Sleepy Hollow State Park Fall 2024 Renovate or replace two campground toilet and shower buildings. $1,000,000 Design/Bid Phase
Gogebic Utility Lake Gogebic State Park Summer 2025 Modernize and improve park's sanitary sewer system. $1,000,000 Design/Bid Phase
Ontonagon Utility Porcupine Mountains Wilderness State Park Spring 2024 Modernize the parks' sanitary sewer system $1,000,000 Design/Bid Phase
Delta Major Development Fayette Historic State Park Spring 2024 Modernize visitor center parking lot and building access and improve accessibility to interior and bathrooms. $1,000,000 Design/Bid Phase
Iron Utility Bewabic State Park Summer 2025 Repair or replace on-site wastewater treatment facility for campground toilet and shower buildings and sanitation station $1,000,000 Design/Bid Phase
Luce Building Muskallonge State Park 2023 or earlier Renovate or replace the toilet and shower building in the west campground loop. $1,000,000 Construction Started
Luce Parking Lot/Road Muskallonge State Park Fall 2024 Reconstruct, resurface, chip seal and pave park roads (as needed). $1,000,000 Design/Bid Phase
Chippewa Building Tahquamenon Falls State Park 2023 or earlier Replace or renovate the toilet and shower building in the Lower Falls Hemlock campground. $1,000,000 Construction Started
Cheboygan Building Cheboygan State Park Fall 2024 Renovate or replace campground toilet and shower building. $1,000,000 Design/Bid Phase
Wexford Parking Lot/Road Mitchell State Park 2023 or earlier Reconstruct, resurface, chip seal and pave campground roads (as needed). $1,000,000 Complete
Huron Building Port Crescent State Park 2023 or earlier Renovate and modernize day-use beach house, including water, sewer and electrical systems. $1,000,000 Design/Bid Phase
Otsego Building Otsego Lake State Park Fall 2024 Renovate or replace campground toilet and shower building. $1,000,000 Design/Bid Phase
Keweenaw Building Fort Wilkins Historic State Park Summer 2024 Replace toilet and shower building in west campground. $1,000,000 Design/Bid Phase
St. Clair Major Development Algonac State Park Spring 2024 Implement sustainable contraction by replacing the toilet and shower building with full hook-up campsites in the north section of the Riverfront Campground. $1,000,000 Design/Bid Phase
Oakland Building Bald Mountain Recreation Area Fall 2024 Renovate or replace the beach day-use area toilet building. $1,000,000 Design/Bid Phase
Crawford Historical Structure Hartwick Pines State Park Spring 2025 Renovate and help preserve historic Memorial Building. $1,000,000 Design/Bid Phase
Ontonagon Building Porcupine Mountains Wilderness State Park Fall 2024 Modernize visitor center, including accessibility enhancements. $1,050,000 Design/Bid Phase
Kalamazoo Utility Fort Custer Recreation Area Spring 2024 Modernize or replace electrical system in west campground loop. $1,062,500 Construction Started
Muskegon Operational Structure Muskegon State Park Spring 2025 Modernize or replace campground sanitation station. $1,100,000 Design/Bid Phase
Luce Utility Muskallonge State Park Fall 2024 Replace or modernize campground sanitary distribution system, lift station and sewage lagoon. $1,100,000 Design/Bid Phase
Mason Parking Lot/Road Ludington State Park Fall 2024 Reconstruct, resurface, chip seal and pave campground roads and Hamlin Lake day-use parking lots (as needed). $1,114,500 Design/Bid Phase
Livingston Parking Lot/Road Brighton Recreation Area Fall 2024 Reconstruct, resurface, chip seal and pave 14 lane miles of park roads (as needed). $1,150,000 Design/Bid Phase
Oakland Building Pontiac Lake Recreation Area To Be Determined Renovate or replace concession and bathroom buildings in the day-use area. $1,200,000 Design/Bid Phase
Wexford Building Mitchell State Park Fall 2024 Renovate or replace the day-use toilet and shelter building. $1,200,000 Design/Bid Phase
Livingston Utility Brighton Recreation Area Fall 2024 Replace and modernize campground electrical system. $1,224,000 Design/Bid Phase
Grand Traverse Utility Interlochen State Park Spring 2024 Replace sanitary lift station, force main to the wastewater treatment facility, and underground water & sewer distribution system in a multi-phased approach. $1,225,000 Design/Bid Phase
Grand Traverse Major Development Traverse City State Park Spring 2026 Redevelop day-use area vehicle and pedestrian access. $1,225,000 Design/Bid Phase
Washtenaw Parking Lot/Road Pinckney Recreation Area Fall 2024 Reconstruct, resurface, chip seal and pave (as needed) campground and day-use area roads. $1,250,000 Design/Bid Phase
Barry Parking Lot/Road Yankee Springs Recreation Area Summer 2024 Reconstruct, resurface, chip seal and pave campground roads (as needed). $1,250,000 Design/Bid Phase
Lapeer Utility Metamora Hadley Recreation Area 2023 or earlier Replace aged sewer treatment system at headquarters and shelter area. $1,250,000 Design/Bid Phase
Crawford Operational Structure Hartwick Pines State Park Spring 2025 Modernize and improve Hartwick Pines Visitor Center. $1,250,000 Design/Bid Phase
Mason Parking Lot/Road Ludington State Park Fall 2024 Expand and improve day-use parking lot, vehicular and pedestrian circulation. $1,300,000 Design/Bid Phase
Iron Building Bewabic State Park Summer 2025 Replace two toilet and shower buildings with one centralized toilet and shower building. $1,300,000 Design/Bid Phase
Ogemaw Utility Rifle River Recreation Area Fall 2024 Replace the campground's sanitary sewer line and lift station. Modernize electrical system. $1,300,000 Design/Bid Phase
Manistee Trails Betsie Valley Trail To Be Determined Rehabilitate existing trail bridge, including decking and structural repairs. $1,300,000 Design/Bid Phase
Otsego Utility Otsego Lake State Park Fall 2024 Upgrade electrical system in campground. $1,317,500 Design/Bid Phase
Washtenaw Parking Lot/Road Waterloo Recreation Area Fall 2024 Reconstruct, resurface, chip seal and pave 20 lane miles of park roads (as needed). $1,400,000 Design/Bid Phase
Ontonagon Historical Structure Porcupine Mountains Wilderness State Park 2023 or earlier Renovate and help preserve the Kaug Wudjoo modern lodge, staff quarters, mechanic's shop, carpenter's shop and fire barn. Renovations include the construction and replacement of new roofs and siding, as well as enhancements to accessibility features. Utility and structural upgrades also are included in ongoing historic preservation efforts. $1,400,000 Construction Started
Ontonagon Parking Lot/Road Porcupine Mountains Wilderness State Park 2023 or earlier Reconstruct, resurface, chip seal and pave park roads (as needed) at the Visitor Center and park headquarters area. $1,400,000 Complete
Iron Parking Lot/Road Bewabic State Park Summer 2025 Reconstruct, resurface, chip seal and pave park roads (as needed). $1,400,000 Design/Bid Phase
Ogemaw Major Development Rifle River Recreation Area Spring 2024 Reconstruct, resurface, chip seal and pave day-use roads (as needed), replace and modernize water and electrical distribution systems in day-use toilet building. $1,400,000 Design/Bid Phase
Bay Building Bay City State Park 2023 or earlier Renovate the interior and exterior of the Saginaw Bay Visitors Center. Renovations include the reception area, exhibit hall, roof and siding, and the addition of a new science lab. General improvements include enhancements to make the park more accessible for all visitors. $1,500,000 Complete
Livingston Parking Lot/Road Island Lake Recreation Area Summer 2024 Reconstruct, resurface, chip seal and pave entrance roads and parking lots at Kent Lake (as needed). $1,500,000 Design/Bid Phase
Ionia Parking Lot/Road Ionia Recreation Area Fall 2024 Reconstruct, resurface, chip seal and pave campground and day-use area roads (as needed). $1,500,000 Design/Bid Phase
Grand Traverse Utility Interlochen State Park 2023 or earlier Modernize and improve electrical system in the south campground. $1,640,500 Complete
Iosco Utility Tawas Point State Park 2023 or earlier Replace and modernize campground electrical system. $1,640,500 Design/Bid Phase
Barry Utility Yankee Springs Recreation Area Summer 2024 Modernize electrical system at Gun Lake campground. $1,700,000 Design/Bid Phase
Lapeer Utility Metamora Hadley Recreation Area 2023 or earlier Replace campground electrical system. $1,710,500 Design/Bid Phase
Houghton Major Development Twin Lakes State Park Spring 2025 Renovate or replace campground toilet and shower building and associated below ground utilities and on-site wastewater treatment. $1,800,000 Design/Bid Phase
Mason Recreational Structure Ludington State Park Fall 2024 Reconstruct deteriorated section and improve access and accessibility of the Skyline Trail. $1,850,000 Design/Bid Phase
Kalamazoo Building Fort Custer Recreation Area 2023 or earlier Replace two existing campground toilet and shower buildings. $2,000,000 Construction Started
Lapeer Parking Lot/Road Metamora Hadley Recreation Area 2023 or earlier Reconstruct, resurface, chip seal and pave roads in the north and south campgrounds (as needed). $2,000,000 Design/Bid Phase
Oakland Parking Lot/Road Seven Lakes State Park Summer 2024 Reconstruct, resurface, chip seal and pave park roads (as needed). $2,000,000 Design/Bid Phase
Presque Isle Building Hoeft State Park Fall 2024 Renovate and replace toilet and shower buildings in the east and west campgrounds. $2,000,000 Design/Bid Phase
Presque Isle Utility Hoeft State Park Fall 2024 Replace park's sanitary system and sewage lagoon. $2,000,000 Design/Bid Phase
Montmorency Building Clear Lake State Park Fall 2024 Renovate or replace two toilet and shower buildings. $2,000,000 Design/Bid Phase
Montmorency Utility Clear Lake State Park Fall 2024 Modernize campground sanitary system and lift station. $2,000,000 Design/Bid Phase
Mackinac Building Straits State Park 2023 or earlier Replace the two upper campground toilet and shower buildings, which will mirror finish details from newly constructed buildings in the park’s lower campground. $2,000,000 Complete
Charlevoix Building Young State Park Spring 2024 Renovate or replace two toilet and shower buildings in the Spruce Campground. $2,000,000 Construction Started
Clinton Parking Lot/Road Sleepy Hollow State Park Fall 2024 Reconstruct, resurface, chip seal and pave 5 lane miles of road between the picnic shelter area, campground loops and day-use area (as needed). $2,250,000 Design/Bid Phase
Bay Utility Bay City State Park 2023 or earlier Replace water supply lines that service the headquarters, campground and sanitation station. Modernize and improve electrical and sanitary systems. $2,350,000 Construction Started
Grand Traverse Major Development Traverse City State Park Fall 2025 Improve park entrance, contact station, sanitation station, vehicular circulation and accessibility. $2,425,000 Design/Bid Phase
Muskegon Building Muskegon State Park Fall 2024 Modernize beach building in day-use area. $2,500,000 Design/Bid Phase
Manistee Building Orchard Beach State Park Summer 2025 Renovate or replace two toilet and shower buildings in campground. $2,500,000 Design/Bid Phase
St. Clair Parking Lot/Road Algonac State Park Summer 2024 Reconstruct, resurface, chip seal and pave day-use and campground roads (as needed). $2,500,000 Design/Bid Phase
Cheboygan Utility Cheboygan State Park 2023 or earlier Construct upgraded electrical and water distribution systems in the modern campground. The project includes the replacement of below-ground water mains and electrical conduit, meters and distribution panels, as well as upgraded jug fillers and electrical pedestals. $2,750,000 Construction Started
Grand Traverse Building Traverse City State Park Fall 2025 Design and construct new park headquarter building/complex. $2,800,000 Design/Bid Phase
Schoolcraft Major Development Indian Lake State Park To Be Determined Renovate or replace three campground toilet and shower buildings, including the abandonment of two drain fields and the expansion of the current sewage lagoon to service the buildings. Construct a new well and water line to support the proposed toilet and shower building. $3,000,000 Design/Bid Phase
Huron Utility Port Crescent State Park Winter 2024 Replace and modernize existing water, sewer, and electrical systems throughout the park and replace or repair campground roads. $3,250,000 Design/Bid Phase
Muskegon Parking Lot/Road Hoffmaster State Park 2023 or earlier Reconstruct, resurface, chip seal and pave campground and day-use area parking (as needed). $3,500,000 Construction Started
Monroe Trails Sterling State Park's Heritage Trail Winter 2025 Stabilize the riverbank in preparation for trail resurfacing. This is the first phase of an improvement project that will leverage federal funding to improve the slowly eroding embankment between the river and marsh lagoon. An additional $3.575 million is proposed in later phases for additional investments in erosion control and to replace the trail. $4,000,000 Design/Bid Phase
Wayne Building Belle Isle Park 2023 or earlier Replace Casino roof and repair basement structural issues. $4,750,000 Construction Started
Van Buren Trails Kal-Haven Trail State Park 2023 or earlier Resurface trail and improve bridges along the trail. $6,000,000 Construction Started
Muskegon Trails Musketawa Trail Spring 2024 Replace bridges and culverts and resurface portions of the trail. $6,500,000 Design/Bid Phase
Wayne Building Belle Isle Park 2023 or earlier Replace the glass and upper steel trusses that support the Anna Scripps Whitcomb Conservatory dome (also known as the Palm House). This project is the second and final phase of a comprehensive plan to revitalize one of the nation’s oldest turn-of-the-century glass houses still in existence. $7,500,000 Construction Started
Mecosta Trails Fred Meijer White Pine Trail State Park 2023 or earlier Pave remaining 21 miles of the 92-mile-long trail and replace two culverts. $9,600,000 Construction Started
Genesee Major Development New Flint River State Park To Be Determined The new state park – in the Chevy Commons on the former site of the Chevrolet plant – will be a key element of the redevelopment of the Flint Riverfront area. It will be the first state park in Genesee County. $30,200,000 Design/Bid Phase
Houghton Utility McLain State Park Summer 2024 On-site wastewater treatment lagoon rehabilitation $1,000,000 Design/Bid Phase
Crawford Historical Structure Hartwick Pines State Park 2023 or earlier Replace Bunkhouse and Chapel building roofs

$350,000 Complete
Wayne Building Belle Isle Park Fall 2025 New HVAC system for Belle Isle Aquarium, as well as facility and site drainage improvements. $10,000,000 Proposed
Wayne Building Belle Isle Park Summer 2025 ADA accessibility improvements, building stabilization and facility development planning for the Anna Scripps Whitcomb Conservatory and Belle Isle Aquarium $1,250,000 Proposed
Wayne Recreational Structure Belle Isle Park Spring 2025 Removal of dilapidated structures and development of recreational green space in the former Belle Isle Zoo complex. $1,000,000 Proposed
Wayne Recreational Structure Belle Isle Park Spring 2025 Address health, safety and welfare concerns at the Belle Isle Boathouse $2,000,000 Proposed
Wayne Building Belle Isle Park Summer 2024 Park-wide abatement of hazardous materials and general structural repairs $2,000,000 Proposed
Wayne Historical Structure Belle Isle Park Summer 2025 Repair, maintenance and structural stablization of the James Scott Memorial Fountain main basin and stairs. $6,000,000 Proposed
Wayne Parking Lot/Road Belle Isle Park Summer 2024 Implementation of wayfinding signage recommendations from the recently completed mobility study $400,000 Proposed
Wayne Study Belle Isle Park Spring 2024 Park-wide Master Plan $350,000 Proposed