Project list view

Improvement Category Project Location Project Description Funding Request Project Status
Parking Lot/Road Algonac State Park Resurfacing, chip seal, reconstruction & new paving as needed throughout day-use and campground roads. $2,500,000 Design/Bid Phase
Major Development Algonac State Park Implement sustainable contraction by replacing the North Bathroom with full hook-up campsites in the north section of the Riverfront Campground. $1,000,000 Design/Bid Phase
Operational Structure Algonac State Park Expand the sanitation station $600,000 Design/Bid Phase
Building Bald Mt. Recreation Area Renovate/replace Beach Toilet Building. $1,000,000 Design/Bid Phase
Utility Bald Mt. Recreation Area Replacement of water distribution system throughout the park. $750,000 Design/Bid Phase
Operational Structure Bald Mt. Recreation Area Culvert replacement beneath Lower Trout Lake & Upper Trout Lake causeways $700,000 Design/Bid Phase
Operational Structure Bald Mt. Recreation Area Dam repairs for Lower Trout Lake Dam $600,000 Design/Bid Phase
Operational Structure Bald Mt. Recreation Area Dam repairs for upper Trout Lake Dam $600,000 Design/Bid Phase
Operational Structure Bald Mt. Recreation Area Dam Repairs for Prince Lake Dam $250,000 Design/Bid Phase
Utility Bay City State Park Replace water supply lines servicing the Headquarters, Campground and Sanitation Station, electrical system modernization and sanitary system improvements. $2,350,000 Design/Bid Phase
Building Bay City State Park Visitor Center improvements/modernization. $1,500,000 Construction Started
Parking Lot/Road Bay City State Park Circulation improvements for the Day Use parking design, pedestrian crosswalk, bus parking, playscape dropoff areas, paving and electrical / sewer (1974) assessment. $500,000 Design/Bid Phase
Building Belle Isle Park Anna Scripps Whitcomb Conservatory - Critical Repairs for Palm House Dome and Replacement of glass and restoration of structural support system, Phase 2 of Conservatory Structural Repairs $7,500,000 Construction Started
Building Belle Isle Park Casino - Design Build Contract, roof replacement and basement structural repairs $4,750,000 Construction Started
Trails Betsie Valley Trail Rehabing existing bridge, decking and super structure repairs $1,300,000 Design/Bid Phase
Parking Lot/Road Bewabic State Park Resurfacing, chip seal, reconstruction & new paving as needed. $1,400,000 Design/Bid Phase
Building Bewabic State Park Replace two toilet shower buildings with one centralized toilet shower building. $1,300,000 Design/Bid Phase
Utility Bewabic State Park On-site sewage disposal for toilet shower buildings and sanitation station including the replacement of drain fields. $1,000,000 Design/Bid Phase
Utility Brighton Recreation Area Modernization/replacement of modern campground electrical system. $1,224,000 Design/Bid Phase
Parking Lot/Road Brighton Recreation Area Resurfacing, chip seal, reconstruction & new paving as needed (14 lane miles) $1,150,000 Design/Bid Phase
Operational Structure Brighton Recreation Area Lower Chilson pond dam repairs $600,000 Design/Bid Phase
Utility Cheboygan State Park Modernize/replace campground electrical system, water distribution system, and sewer system. $2,750,000 Construction Started
Building Cheboygan State Park Renovate/replace campground toilet shower building. $1,000,000 Design/Bid Phase
Recreational Structure Cheboygan State Park Replacement of Trail Boardwalk through wetland $225,000 Design/Bid Phase
Recreational Structure Cheboygan State Park Day Use Pavilion Beam Replacements $100,000 Design/Bid Phase
Trails CIS Trail Resurface area that has poor drainage and surfacing $8,000,000 Proposed
Building Clear Lake State Park Renovate/Replace 2 toilet shower buildings. $2,000,000 Design/Bid Phase
Utility Clear Lake State Park Modernize Campground Sanitary System and Lift Station $2,000,000 Design/Bid Phase
Utility Clear Lake State Park Replace Campground Water Distribution System $650,000 Design/Bid Phase
Major Development Fayette Historic State Park Visitor Center Parking Lot, Building Access, and Interior Building and Bathroom Accessibility modernization. $1,000,000 Design/Bid Phase
Historical Structure Fayette Historic State Park Historic townsite preservation - Masonry repair to south casting house wall $600,000 Construction Started
Utility Fayette Historic State Park Improvements and modernization to the Contact Station, and Visitor's center, Sewage Lift Station and Pressure Line to the Campground Septic Field. Add septic tank to T/S bldg. $600,000 Design/Bid Phase
Historical Structure Fayette Historic State Park Town hall / opera house structural improvements, residing, and painting. $550,000 Design/Bid Phase
Historical Structure Fayette Historic State Park Reconstruct and preserve historic Charcoal Kiln retaining wall $400,000 Construction Started
Utility Fayette Historic State Park Phase 2 - Water Treatment Plant Improvements & Park Wells $300,000 Design/Bid Phase
Major Development Flint River State Park Development of new state park along the Flint River $30,200,000 Design/Bid Phase
Building Fort Custer Recreation Area Replace 2 existing campground toilet/shower buildings. $2,000,000 Design/Bid Phase
Utility Fort Custer Recreation Area Modernize/Replace West Campground Loop electrical system. $1,062,500 Design/Bid Phase
Building Fort Wilkins Historic State Park Replace west campground toilet shower building. $1,000,000 Design/Bid Phase
Historical Structure Fort Wilkins Historic State Park Historic fort complex restoration and preservation including 1: Replacement of stockade fence. 2: Replace window glazing on all windows. 3: Construct new roofs on officer's quarters (3 buildings) 4. Perform selective siding replacement on officer's quarters (3 bldgs.). 5: Foundation masonry repairs. 6: Apply new exterior paint to siding and windows. $870,000 Design/Bid Phase
Utility Fort Wilkins Historic State Park Replace East Campground Loop electrical system. $680,000 Design/Bid Phase
Trails Fred Meijer White Pine Trail State Park Pave remaining 21 miles of the 92-mile-long trail and replace two culverts. $8,000,000 Construction Started
Operational Structure Hartwick Pines State Park Visitor Center modernization renovations $1,250,000 Design/Bid Phase
Historical Structure Hartwick Pines State Park Renovations and historic preservation of Memorial Building $1,000,000 Completed
Utility Hartwick Pines State Park Modernize campground electric service $841,500 Design/Bid Phase
Historical Structure Hartwick Pines State Park Replace Bunkhouse and Chapel building roofs $350,000 Design/Bid Phase
Building Hoeft State Park Renovate/replace East and West Campground toilet/shower buildings $2,000,000 Design/Bid Phase
Utility Hoeft State Park Replace park sanitary system and sewage lagoon $2,000,000 Design/Bid Phase
Utility Hoeft State Park Replacement of water distribution system throughout the campground $650,000 Design/Bid Phase
Building Hoeft State Park Replacement of campground contact station and vehicular circulation improvements. $500,000 Design/Bid Phase
Utility Hoeft State Park Replace Sanitation Station $500,000 Design/Bid Phase
Parking Lot/Road Hoffmaster State Park Resurfacing, chip seal, reconstruction & new paving as needed for both campground and day-use area. $3,500,000 Construction Started
Building Hoffmaster State Park Renovations of the Gillette Visitor's Center (Roof, Flooring, and Exhibits) $650,000 Construction Started
Utility Hoffmaster State Park Renovate campground water and sewer lines. HDPE water lines have been continual maintenance issues. Sewer lines have had groundwater infiltration in the past. $500,000 Construction Started
Recreational Structure Hoffmaster State Park Dune trail modernization including renovation/replacement of boardwalks/overlooks on top of dune, and retaining wall leading to stairway. $300,000 Construction Started
Building Hoffmaster State Park Implement sustainable contraction by replacing two toilet buildings with one. $900,000 Design/Bid Phase
Operational Structure Hoffmaster State Park Sanitation station replacement to meet current demand including replacement of sanitary lift station. $450,000 Construction Started
Utility Hoffmaster State Park Stormwater system improvements at campground C-Loop to alleviate flooding issues. $100,000 Design/Bid Phase
Operational Structure Holly Recreation Area Heron dam repairs $600,000 Design/Bid Phase
Operational Structure Holly Recreation Area Wildwood dam repairs $600,000 Design/Bid Phase
Major Development Indian Lake State Park Renovate/replace 3 campground toilet/shower buildings including the abandonment of 2 drain fields and the expansion of the current sewage lagoon to service the buildings. Construction of a new well and water line to support the proposed toilet/shower building. $3,000,000 Design/Bid Phase
Operational Structure Indian Lake State Park Shoreline Restoration through naturalization techniques $650,000 Design/Bid Phase
Operational Structure Indian Lake State Park Sanitation Station Replacement $500,000 Design/Bid Phase
Utility Interlochen State Park South Campground Electrical modernization and improvements $1,640,500 Design/Bid Phase
Utility Interlochen State Park Water and Sewer system replacement $1,225,000 Design/Bid Phase
Building Interlochen State Park Modernization and accessibility improvements to the Day Use Building. $700,000 Design/Bid Phase
Parking Lot/Road Ionia Recreation Area Resurface, chip seal, reconstruction, and new paving as needed at campground and day-use areas. $1,500,000 Design/Bid Phase
Utility Ionia Recreation Area Modernize campground electrical system. $833,000 Design/Bid Phase
Operational Structure Ionia Recreation Area Sessions Lake dam repairs. Draw down pump & miscellaneous repairs (Replace outlet pipe). $600,000 Design/Bid Phase
Utility Ionia Recreation Area Campground Toilet Shower building iron removal system including expansion of the campground sanitation station. $500,000 Design/Bid Phase
Utility Ionia Recreation Area Expand drain tile field as part of ongoing maintenance. $500,000 Design/Bid Phase
Building Ionia Recreation Area Beach House roof replacement $200,000 Design/Bid Phase
Historical Structure Ionia Recreation Area Historic Sessions Schoolhouse building renovation/preservation of interior and exterior. $100,000 Design/Bid Phase
Parking Lot/Road Island Lake Recreation Area Kent Lake entrance road and parking lots improvements. $1,500,000 Design/Bid Phase
Parking Lot/Road Island Lake Recreation Area Resurfacing, chip seal, reconstruction and new paving as needed. $550,000 Design/Bid Phase
Parking Lot/Road Island Lake Recreation Area Contact station modernization to resolve the current conflict between bikes and vehicles. $500,000 Design/Bid Phase
Utility Island Lake Recreation Area Spring Mill Pond and Kent Lake sanitary lift stations and pumps replacement. $400,000 Design/Bid Phase
Trails Kal-Haven Trail State Park Surfacing and bridges on the Kal-Haven Trail $5,000,000 Proposed
Building Lake Gogebic State Park Park headquarters and cold storage area renovations/replacement. $1,000,000 Proposed
Utility Lake Gogebic State Park Sanitary sewer system improvements and modernization. $1,000,000 Design/Bid Phase
Utility Lake Gogebic State Park Modernization and replacement of electrical system. $901,000 Design/Bid Phase
Utility Lake Gogebic State Park Water line replacement $500,000 Design/Bid Phase
Utility Lake Gogebic State Park Storm water management system to address wet campsites/flooding in campground $250,000 Design/Bid Phase
Trails Lake Linden Trail Reconstruction of trail after Houghton County Flooding Emergency $2,000,000 Design/Bid Phase
Recreational Structure Ludington State Park Skyline Trail modernization. $1,850,000 Design/Bid Phase
Parking Lot/Road Ludington State Park Vehicle/Pedestrian Circulation modernization and expansion of day use parking lot. $1,300,000 Design/Bid Phase
Parking Lot/Road Ludington State Park Resurfacing, chip seal, reconstruction & new paving as needed to the campground roads and Hamlin Lake Day Use Parking lots. $1,114,500 Design/Bid Phase
Operational Structure Maybury State Park Fish pond dam repairs $600,000 Design/Bid Phase
Utility McLain State Park On-site wastewater treatment lagoon rehabilitation $1,000,000 Design/Bid Phase
Parking Lot/Road Metamora Hadley Recreation Area Resurfacing, chip seal, reconstruction & new paving as needed to roads in the North and South Campgrounds. $2,000,000 Design/Bid Phase
Utility Metamora Hadley Recreation Area Replace electrical system in campground. $1,710,500 Design/Bid Phase
Utility Metamora Hadley Recreation Area Replace aged sewer treatment system at HQ and shelter area $1,250,000 Design/Bid Phase
Operational Structure Metamora Hadley Recreation Area Minnewanna dam repairs $600,000 Design/Bid Phase
Utility Metamora Hadley Recreation Area Water lines & spigot replacements in both the North & South campgrounds $350,000 Design/Bid Phase
Building Mitchell State Park Renovate/replace the Day Use Toilet and Shelter Building. $1,200,000 Design/Bid Phase
Parking Lot/Road Mitchell State Park Resurfacing, chip seal, reconstruction & new paving as needed of campground roads $1,000,000 Design/Bid Phase
Utility Muskallonge State Park Replace/modernize Campground Sanitary Distribution System, Lift Station, and Sewage Lagoon $1,100,000 Design/Bid Phase
Building Muskallonge State Park Renovate/Replace the West Campground Loop toilet/shower building. $1,000,000 Design/Bid Phase
Parking Lot/Road Muskallonge State Park Resurfacing, chip seal, reconstruction & new paving as needed (8 lane miles) $1,000,000 Design/Bid Phase
Recreational Structure Muskallonge State Park Renovate existing stairway used to access Lake Superior $175,000 Design/Bid Phase
Operational Structure Muskegon State Park Modernize/replace sanitation station $1,100,000 Design/Bid Phase
Parking Lot/Road Muskegon State Park Resurfacing, chip seal, reconstruction & new paving as needed $900,000 Design/Bid Phase
Utility Muskegon State Park Replace electrical system at Snug Harbor $300,000 Design/Bid Phase
Utility Muskegon State Park New municipal water is being installed. Install new water distribution lines to maximize efficiencies to existing park facilities. $200,000 Design/Bid Phase
Building Muskegon State Park Beach Building modernization $2,500,000 Design/Bid Phase
Recreational Structure Muskegon State Park Snug Harbor Fishing Pier repairs and accessibility improvements. $250,000 Design/Bid Phase
Trails Musketawa Trail State Park Complete redo of several bridges, culverts and surfacing $6,500,000 Design/Bid Phase
Building Orchard Beach State Park Renovate/replace two toilet shower buildings $2,500,000 Design/Bid Phase
Recreational Structure Orchard Beach State Park Evaluate shoreline connection and create enhanced lakeshore viewing.
$245,000 Design/Bid Phase
Utility Otsego Lake State Park Upgrade campground electrical system $1,317,500 Design/Bid Phase
Building Otsego Lake State Park Renovate/replace one toilet shower building $1,000,000 Design/Bid Phase
Utility Otsego Lake State Park Replace sanitary lines and upgrade lift stations $750,000 Design/Bid Phase
Parking Lot/Road Palms Book State Park Rehabilitation of parking lot $550,000 Design/Bid Phase
Recreational Structure Palms Book State Park Replacement of obseravation raft $500,000 Design/Bid Phase
Parking Lot/Road Pinckney Recreation Area Resurfacing, chip seal, reconstruction & new paving as needed to Silver Lake day use area. $1,250,000 Design/Bid Phase
Building Pinckney Recreation Area Renovate/replace Bruin Lake north campground toilet shower building. $1,000,000 Design/Bid Phase
Parking Lot/Road Pinckney Recreation Area Resurfacing, chip seal, reconstruction & new paving as needed to Bruin Lake campground entrance road and campground loops. Improve campground drainage. $1,000,000 Design/Bid Phase
Operational Structure Pinckney Recreation Area Bruin Lake Sanitation Station replacement $500,000 Design/Bid Phase
Building Pinckney Recreation Area Replace Bruin Lake Campground- garage/workshop. $450,000 Design/Bid Phase
Building Pinckney Recreation Area Modernize Silver Lake Concessions Building. $200,000 Design/Bid Phase
Building Pontiac Lake Recreation Area Renovate/replace Concession and bathroom buildings in the Day-Use Area $1,200,000 Design/Bid Phase
Utility Pontiac Lake Recreation Area Replace water supply and sanitary disposal. $1,000,000 Design/Bid Phase
Historical Structure Porcupine Mountains Wilderness State Park Historic Service area building renovations and preservation (Lodge, Staff Quarters, Mechanic's Shop, Carpenter's Shop, and Fire Barn) $1,400,000 Construction Started
Parking Lot/Road Porcupine Mountains Wilderness State Park Resurfacing and reconstruction of Porcupine Mountains visitor center and Headquarters area paved surfaces. $1,400,000 Design/Bid Phase
Building Porcupine Mountains Wilderness State Park Visitor Center modernization renovations $1,050,000 Design/Bid Phase
Utility Porcupine Mountains Wilderness State Park Sanitary sewer system modernization $1,000,000 Design/Bid Phase
Utility Porcupine Mountains Wilderness State Park Modernization and replacement of electrical system. $833,000 Design/Bid Phase
Parking Lot/Road Porcupine Mountains Wilderness State Park Renovations of the existing Summit Peak Parking lot and composting toilet. Parking lot -Provide moderate parking expansion. Perform clearing, paving, site drainage, pavement markings, and accessibility improvements. Composting toilet - perform foundation repairs and renovations. $500,000 Design/Bid Phase
Recreational Structure Porcupine Mountains Wilderness State Park Replacement and/or rehabilitation of East & West Chair lifts on ski hill. Modernize to include Mtn. Bike hooks and mountain bike trails on the hill. $500,000 Design/Bid Phase
Utility Port Crescent State Park Replace/modernize existing waterlines, sanitary sewer, electric system and roads in campgrounds. $3,250,000 Design/Bid Phase
Building Port Crescent State Park Modernize/Renovate existing Day Use - Beach House / Pavillion including new waterlines, sanitary sewer, electrical system, and building structure $1,000,000 Design/Bid Phase
Parking Lot/Road Port Crescent State Park Day Use road repair and parking lot expansion. $700,000 Design/Bid Phase
Utility Rifle River Recreation Area Sanitary sewer improvements to Siphon System and Leach Field. $425,000 Proposed
Recreational Structure Rifle River Recreation Area Rehabilitation/replacement of cable pedestrian suspension bridge and Observation Tower. $210,000 Design/Bid Phase
Major Development Rifle River Recreation Area Replacement and modernization of Day Use road pavement, sanitary sewer system, water distribution system, and electric system for the Pavillion / Toilet building. $1,400,000 Design/Bid Phase
Utility Rifle River Recreation Area Replace campground sanitary sewer line to liftstation and modernize the electric system. $1,300,000 Design/Bid Phase
Parking Lot/Road Saginaw Malleable Iron Parking lot and road way improvements to park entrance. $867,000 Construction Started
Parking Lot/Road Seven Lakes State Park Resurfacing, chip seal, reconstruction & new paving as needed $2,000,000 Design/Bid Phase
Utility Seven Lakes State Park Sanitary system improvements/replacement $1,000,000 Proposed
Utility Seven Lakes State Park Campground electrical system replacement/modernization. $603,000 Design/Bid Phase
Building Seven Lakes State Park Renovate/Replace two Big Seven Shelters. $500,000 Design/Bid Phase
Parking Lot/Road Sleepy Hollow State Park Resurfacing, chip seal, reconstruction & new paving as needed (5 lane miles) at picnic shelter area, campground loops, and day use area. $2,250,000 Design/Bid Phase
Building Sleepy Hollow State Park Renovate/replace two Campground toilet/shower buildings. $1,000,000 Design/Bid Phase
Building Sleepy Hollow State Park Renovate Day-Use beach toilet building. $600,000 Design/Bid Phase
Utility Sleepy Hollow State Park Replacement of the headquarters lagoon system and replacement of the campground sanitation station. $500,000 Design/Bid Phase
Trails Sterling Heritage Trail Embankment Repair - Phase 1 (phase2 on hold) $4,000,000 Construction Started
Building Straits State Park Renovate/Replace two upper campground toilet shower buildings. $2,000,000 Construction Started
Utility Straits State Park Replace Sanitary Lift Station $125,000 Design/Bid Phase
Building Tahquamenon Falls State Park Replace/renovate lower falls campground Hemlock toilet shower building. $1,000,000 Design/Bid Phase
Utility Tahquamenon Falls State Park Replace/improve well & water distribution system for the Lower Falls Unit. $700,000 Design/Bid Phase
Utility Tahquamenon Falls State Park Replace/upgrade Campground Electrical system at the Lower Falls Portage Campground $675,000 Design/Bid Phase
Utility Tahquamenon Falls State Park Replace Hemlock Campground Water Distribution System and Well $650,000 Design/Bid Phase
Recreational Structure Tahquamenon Falls State Park Modernize the Brink Overlook Stairs, Upper Viewing Area and Viewing Platform. $500,000 Design/Bid Phase
Building Tahquamenon Falls State Park Modernize Rivermouth maintenance Building and Employee Bathrooms. $400,000 Design/Bid Phase
Parking Lot/Road Tahquamenon Falls State Park Modernization of the Upper Falls and Lower Falls entrance and parking areas. $275,000 Design/Bid Phase
Utility Tahquamenon Falls State Park Replace/upgrade wells at upper falls including improvements to the waste water lagoon $100,000 Design/Bid Phase
Parking Lot/Road Tahquamenon Falls State Park Remove/replace curbing at lower falls parking area $75,000 Proposed
Utility Tawas Point State Park Modernize/replace campground electrical system. $1,640,500 Design/Bid Phase
Parking Lot/Road Tawas Point State Park Paving of Day Use Roads after relocation to west due to road washout. $850,000 Design/Bid Phase
Historical Structure Tawas Point State Park Repair the spalling brick on the historic light house tower. $455,500 Construction Started
Operational Structure Tawas Point State Park Shoreline stabilization along Lake Huron. $150,000 Design/Bid Phase
Building Traverse City State Park Design and construct new park headquarter building/complex. $2,800,000 Design/Bid Phase
Major Development Traverse City State Park Campground improvements including park entrance, sanitation station, contact station, vehicular circulation, and accessibility improvements. $2,425,000 Design/Bid Phase
Major Development Traverse City State Park Redevelop day-use area vehicle and pedestrian access.
$1,225,000 Design/Bid Phase
Major Development Twin Lakes State Park Renovate/Replace Campground toilet/shower building and associated below ground utilities, including the replacement of a drain field. $1,800,000 Design/Bid Phase
Utility Twin Lakes State Park Water line replacement $700,000 Design/Bid Phase
Parking Lot/Road Twin Lakes State Park Resurfacing, chip seal, reconstruction & new paving as needed of entrance road, parking lots and roadways (1 lane mile). $550,000 Design/Bid Phase
Building Twin Lakes State Park Modernization to day use beach buildings and address sinking foundations $350,000 Design/Bid Phase
Utility Van Buren State Park Lagoon Rehabilitations $700,000 Design/Bid Phase
Recreational Structure Van Buren State Park Beach access redevelopment due to erosion from high lake levels. $400,000 Design/Bid Phase
Trails Various Non-Mortorized trails located in state parks. $3,000,000 Proposed
Building W.C. Wetzel RA Construct a picnic pavillion $140,000 Design/Bid Phase
Parking Lot/Road W.C. Wetzel RA Resurface accessible walking path $138,125 Design/Bid Phase
Building W.C. Wetzel RA Replace two vault toilets $50,000 Design/Bid Phase
Parking Lot/Road Waterloo Recreation Area Resurfacing, chip seal, reconstruction & new paving as needed (20 lane miles) $1,400,000 Design/Bid Phase
Operational Structure Waterloo Recreation Area Repair/replace Lake Winnewana's stormwater outlet pipe. $600,000 Design/Bid Phase
Building Waterloo Recreation Area Modernization of the Eddy Discovery Center Building including but not limited to roof replacement, atrium renovations, HVAC installation, and carpeting replacement. $360,000 Design/Bid Phase
Utility Waterloo Recreation Area Install a water softening system at the Portage Lake and Sugarloaf Lake campground toilet/shower building due to hard water. $120,000 Design/Bid Phase
Utility Waterloo Recreation Area Sugarloaf Campground waterline replacement. $100,000 Design/Bid Phase
Recreational Structure Waterloo Recreation Area Portage Lake Fishing Pier $65,000 Construction Started
Recreational Structure Waterloo Recreation Area Resurface both playgrounds at Sugarloaf and Portage Lake Campgrounds. $60,000 Design/Bid Phase
Trails White Pine Trail State Park Paving of final 29 miles of the 62 mile White Pine Trail and replacement of covered bridge in Reed City. $8,000,000 Proposed
Utility Yankee Springs Recreation Area Gun Lake campground electrical modernization. $1,700,000 Design/Bid Phase
Parking Lot/Road Yankee Springs Recreation Area Resurfacing, chip seal, reconstruction & new paving as needed of campground roads $1,250,000 Design/Bid Phase
Utility Yankee Springs Recreation Area Install storm drainage improvements to resolve flooding issues at Gun Lake campground. Replace aging sewer lines within park. $1,000,000 Design/Bid Phase
Building Yankee Springs Recreation Area Renovate Murphy's Point toilet building and beach toilet/concession building. $800,000 Design/Bid Phase
Operational Structure Yankee Springs Recreation Area Hall Lake dam repairs $600,000 Construction Started
Recreational Structure Yankee Springs Recreation Area Replace fishing pier at Gun Lake day use area. $150,000 Design/Bid Phase
Building Young State Park Renovate/replace two Toilet Shower Buildings in the Spruce Campground $2,000,000 Design/Bid Phase
Major Development Young State Park Redevelopment and modernization of the Spruce campground with storm water system improvements, repaving of campground loop, and campsite refresh $575,000 Design/Bid Phase
Utility Young State Park Replace two sanitary lift stations $250,000 Design/Bid Phase