Project list view
Improvement Category | Project Location | Project Description | Funding Request | Project Status |
---|---|---|---|---|
Parking Lot/Road | Algonac State Park | Resurfacing, chip seal, reconstruction & new paving as needed throughout day-use and campground roads. | $2,500,000 | Design/Bid Phase |
Major Development | Algonac State Park | Implement sustainable contraction by replacing the North Bathroom with full hook-up campsites in the north section of the Riverfront Campground. | $1,000,000 | Design/Bid Phase |
Operational Structure | Algonac State Park | Expand the sanitation station | $600,000 | Design/Bid Phase |
Building | Bald Mt. Recreation Area | Renovate/replace Beach Toilet Building. | $1,000,000 | Design/Bid Phase |
Utility | Bald Mt. Recreation Area | Replacement of water distribution system throughout the park. | $750,000 | Design/Bid Phase |
Operational Structure | Bald Mt. Recreation Area | Culvert replacement beneath Lower Trout Lake & Upper Trout Lake causeways | $700,000 | Design/Bid Phase |
Operational Structure | Bald Mt. Recreation Area | Dam repairs for Lower Trout Lake Dam | $600,000 | Design/Bid Phase |
Operational Structure | Bald Mt. Recreation Area | Dam repairs for upper Trout Lake Dam | $600,000 | Design/Bid Phase |
Operational Structure | Bald Mt. Recreation Area | Dam Repairs for Prince Lake Dam | $250,000 | Design/Bid Phase |
Utility | Bay City State Park | Replace water supply lines servicing the Headquarters, Campground and Sanitation Station, electrical system modernization and sanitary system improvements. | $2,350,000 | Design/Bid Phase |
Building | Bay City State Park | Visitor Center improvements/modernization. | $1,500,000 | Construction Started |
Parking Lot/Road | Bay City State Park | Circulation improvements for the Day Use parking design, pedestrian crosswalk, bus parking, playscape dropoff areas, paving and electrical / sewer (1974) assessment. | $500,000 | Design/Bid Phase |
Building | Belle Isle Park | Anna Scripps Whitcomb Conservatory - Critical Repairs for Palm House Dome and Replacement of glass and restoration of structural support system, Phase 2 of Conservatory Structural Repairs | $7,500,000 | Construction Started |
Building | Belle Isle Park | Casino - Design Build Contract, roof replacement and basement structural repairs | $4,750,000 | Construction Started |
Trails | Betsie Valley Trail | Rehabing existing bridge, decking and super structure repairs | $1,300,000 | Design/Bid Phase |
Parking Lot/Road | Bewabic State Park | Resurfacing, chip seal, reconstruction & new paving as needed. | $1,400,000 | Design/Bid Phase |
Building | Bewabic State Park | Replace two toilet shower buildings with one centralized toilet shower building. | $1,300,000 | Design/Bid Phase |
Utility | Bewabic State Park | On-site sewage disposal for toilet shower buildings and sanitation station including the replacement of drain fields. | $1,000,000 | Design/Bid Phase |
Utility | Brighton Recreation Area | Modernization/replacement of modern campground electrical system. | $1,224,000 | Design/Bid Phase |
Parking Lot/Road | Brighton Recreation Area | Resurfacing, chip seal, reconstruction & new paving as needed (14 lane miles) | $1,150,000 | Design/Bid Phase |
Operational Structure | Brighton Recreation Area | Lower Chilson pond dam repairs | $600,000 | Design/Bid Phase |
Utility | Cheboygan State Park | Modernize/replace campground electrical system, water distribution system, and sewer system. | $2,750,000 | Construction Started |
Building | Cheboygan State Park | Renovate/replace campground toilet shower building. | $1,000,000 | Design/Bid Phase |
Recreational Structure | Cheboygan State Park | Replacement of Trail Boardwalk through wetland | $225,000 | Design/Bid Phase |
Recreational Structure | Cheboygan State Park | Day Use Pavilion Beam Replacements | $100,000 | Design/Bid Phase |
Trails | CIS Trail | Resurface area that has poor drainage and surfacing | $8,000,000 | Proposed |
Building | Clear Lake State Park | Renovate/Replace 2 toilet shower buildings. | $2,000,000 | Design/Bid Phase |
Utility | Clear Lake State Park | Modernize Campground Sanitary System and Lift Station | $2,000,000 | Design/Bid Phase |
Utility | Clear Lake State Park | Replace Campground Water Distribution System | $650,000 | Design/Bid Phase |
Major Development | Fayette Historic State Park | Visitor Center Parking Lot, Building Access, and Interior Building and Bathroom Accessibility modernization. | $1,000,000 | Design/Bid Phase |
Historical Structure | Fayette Historic State Park | Historic townsite preservation - Masonry repair to south casting house wall | $600,000 | Construction Started |
Utility | Fayette Historic State Park | Improvements and modernization to the Contact Station, and Visitor's center, Sewage Lift Station and Pressure Line to the Campground Septic Field. Add septic tank to T/S bldg. | $600,000 | Design/Bid Phase |
Historical Structure | Fayette Historic State Park | Town hall / opera house structural improvements, residing, and painting. | $550,000 | Design/Bid Phase |
Historical Structure | Fayette Historic State Park | Reconstruct and preserve historic Charcoal Kiln retaining wall | $400,000 | Construction Started |
Utility | Fayette Historic State Park | Phase 2 - Water Treatment Plant Improvements & Park Wells | $300,000 | Design/Bid Phase |
Major Development | Flint River State Park | Development of new state park along the Flint River | $30,200,000 | Design/Bid Phase |
Building | Fort Custer Recreation Area | Replace 2 existing campground toilet/shower buildings. | $2,000,000 | Design/Bid Phase |
Utility | Fort Custer Recreation Area | Modernize/Replace West Campground Loop electrical system. | $1,062,500 | Design/Bid Phase |
Building | Fort Wilkins Historic State Park | Replace west campground toilet shower building. | $1,000,000 | Design/Bid Phase |
Historical Structure | Fort Wilkins Historic State Park | Historic fort complex restoration and preservation including 1: Replacement of stockade fence. 2: Replace window glazing on all windows. 3: Construct new roofs on officer's quarters (3 buildings) 4. Perform selective siding replacement on officer's quarters (3 bldgs.). 5: Foundation masonry repairs. 6: Apply new exterior paint to siding and windows. | $870,000 | Design/Bid Phase |
Utility | Fort Wilkins Historic State Park | Replace East Campground Loop electrical system. | $680,000 | Design/Bid Phase |
Trails | Fred Meijer White Pine Trail State Park | Pave remaining 21 miles of the 92-mile-long trail and replace two culverts. | $8,000,000 | Construction Started |
Operational Structure | Hartwick Pines State Park | Visitor Center modernization renovations | $1,250,000 | Design/Bid Phase |
Historical Structure | Hartwick Pines State Park | Renovations and historic preservation of Memorial Building | $1,000,000 | Completed |
Utility | Hartwick Pines State Park | Modernize campground electric service | $841,500 | Design/Bid Phase |
Historical Structure | Hartwick Pines State Park | Replace Bunkhouse and Chapel building roofs | $350,000 | Design/Bid Phase |
Building | Hoeft State Park | Renovate/replace East and West Campground toilet/shower buildings | $2,000,000 | Design/Bid Phase |
Utility | Hoeft State Park | Replace park sanitary system and sewage lagoon | $2,000,000 | Design/Bid Phase |
Utility | Hoeft State Park | Replacement of water distribution system throughout the campground | $650,000 | Design/Bid Phase |
Building | Hoeft State Park | Replacement of campground contact station and vehicular circulation improvements. | $500,000 | Design/Bid Phase |
Utility | Hoeft State Park | Replace Sanitation Station | $500,000 | Design/Bid Phase |
Parking Lot/Road | Hoffmaster State Park | Resurfacing, chip seal, reconstruction & new paving as needed for both campground and day-use area. | $3,500,000 | Construction Started |
Building | Hoffmaster State Park | Renovations of the Gillette Visitor's Center (Roof, Flooring, and Exhibits) | $650,000 | Construction Started |
Utility | Hoffmaster State Park | Renovate campground water and sewer lines. HDPE water lines have been continual maintenance issues. Sewer lines have had groundwater infiltration in the past. | $500,000 | Construction Started |
Recreational Structure | Hoffmaster State Park | Dune trail modernization including renovation/replacement of boardwalks/overlooks on top of dune, and retaining wall leading to stairway. | $300,000 | Construction Started |
Building | Hoffmaster State Park | Implement sustainable contraction by replacing two toilet buildings with one. | $900,000 | Design/Bid Phase |
Operational Structure | Hoffmaster State Park | Sanitation station replacement to meet current demand including replacement of sanitary lift station. | $450,000 | Construction Started |
Utility | Hoffmaster State Park | Stormwater system improvements at campground C-Loop to alleviate flooding issues. | $100,000 | Design/Bid Phase |
Operational Structure | Holly Recreation Area | Heron dam repairs | $600,000 | Design/Bid Phase |
Operational Structure | Holly Recreation Area | Wildwood dam repairs | $600,000 | Design/Bid Phase |
Major Development | Indian Lake State Park | Renovate/replace 3 campground toilet/shower buildings including the abandonment of 2 drain fields and the expansion of the current sewage lagoon to service the buildings. Construction of a new well and water line to support the proposed toilet/shower building. | $3,000,000 | Design/Bid Phase |
Operational Structure | Indian Lake State Park | Shoreline Restoration through naturalization techniques | $650,000 | Design/Bid Phase |
Operational Structure | Indian Lake State Park | Sanitation Station Replacement | $500,000 | Design/Bid Phase |
Utility | Interlochen State Park | South Campground Electrical modernization and improvements | $1,640,500 | Design/Bid Phase |
Utility | Interlochen State Park | Water and Sewer system replacement | $1,225,000 | Design/Bid Phase |
Building | Interlochen State Park | Modernization and accessibility improvements to the Day Use Building. | $700,000 | Design/Bid Phase |
Parking Lot/Road | Ionia Recreation Area | Resurface, chip seal, reconstruction, and new paving as needed at campground and day-use areas. | $1,500,000 | Design/Bid Phase |
Utility | Ionia Recreation Area | Modernize campground electrical system. | $833,000 | Design/Bid Phase |
Operational Structure | Ionia Recreation Area | Sessions Lake dam repairs. Draw down pump & miscellaneous repairs (Replace outlet pipe). | $600,000 | Design/Bid Phase |
Utility | Ionia Recreation Area | Campground Toilet Shower building iron removal system including expansion of the campground sanitation station. | $500,000 | Design/Bid Phase |
Utility | Ionia Recreation Area | Expand drain tile field as part of ongoing maintenance. | $500,000 | Design/Bid Phase |
Building | Ionia Recreation Area | Beach House roof replacement | $200,000 | Design/Bid Phase |
Historical Structure | Ionia Recreation Area | Historic Sessions Schoolhouse building renovation/preservation of interior and exterior. | $100,000 | Design/Bid Phase |
Parking Lot/Road | Island Lake Recreation Area | Kent Lake entrance road and parking lots improvements. | $1,500,000 | Design/Bid Phase |
Parking Lot/Road | Island Lake Recreation Area | Resurfacing, chip seal, reconstruction and new paving as needed. | $550,000 | Design/Bid Phase |
Parking Lot/Road | Island Lake Recreation Area | Contact station modernization to resolve the current conflict between bikes and vehicles. | $500,000 | Design/Bid Phase |
Utility | Island Lake Recreation Area | Spring Mill Pond and Kent Lake sanitary lift stations and pumps replacement. | $400,000 | Design/Bid Phase |
Trails | Kal-Haven Trail State Park | Surfacing and bridges on the Kal-Haven Trail | $5,000,000 | Proposed |
Building | Lake Gogebic State Park | Park headquarters and cold storage area renovations/replacement. | $1,000,000 | Proposed |
Utility | Lake Gogebic State Park | Sanitary sewer system improvements and modernization. | $1,000,000 | Design/Bid Phase |
Utility | Lake Gogebic State Park | Modernization and replacement of electrical system. | $901,000 | Design/Bid Phase |
Utility | Lake Gogebic State Park | Water line replacement | $500,000 | Design/Bid Phase |
Utility | Lake Gogebic State Park | Storm water management system to address wet campsites/flooding in campground | $250,000 | Design/Bid Phase |
Trails | Lake Linden Trail | Reconstruction of trail after Houghton County Flooding Emergency | $2,000,000 | Design/Bid Phase |
Recreational Structure | Ludington State Park | Skyline Trail modernization. | $1,850,000 | Design/Bid Phase |
Parking Lot/Road | Ludington State Park | Vehicle/Pedestrian Circulation modernization and expansion of day use parking lot. | $1,300,000 | Design/Bid Phase |
Parking Lot/Road | Ludington State Park | Resurfacing, chip seal, reconstruction & new paving as needed to the campground roads and Hamlin Lake Day Use Parking lots. | $1,114,500 | Design/Bid Phase |
Operational Structure | Maybury State Park | Fish pond dam repairs | $600,000 | Design/Bid Phase |
Utility | McLain State Park | On-site wastewater treatment lagoon rehabilitation | $1,000,000 | Design/Bid Phase |
Parking Lot/Road | Metamora Hadley Recreation Area | Resurfacing, chip seal, reconstruction & new paving as needed to roads in the North and South Campgrounds. | $2,000,000 | Design/Bid Phase |
Utility | Metamora Hadley Recreation Area | Replace electrical system in campground. | $1,710,500 | Design/Bid Phase |
Utility | Metamora Hadley Recreation Area | Replace aged sewer treatment system at HQ and shelter area | $1,250,000 | Design/Bid Phase |
Operational Structure | Metamora Hadley Recreation Area | Minnewanna dam repairs | $600,000 | Design/Bid Phase |
Utility | Metamora Hadley Recreation Area | Water lines & spigot replacements in both the North & South campgrounds | $350,000 | Design/Bid Phase |
Building | Mitchell State Park | Renovate/replace the Day Use Toilet and Shelter Building. | $1,200,000 | Design/Bid Phase |
Parking Lot/Road | Mitchell State Park | Resurfacing, chip seal, reconstruction & new paving as needed of campground roads | $1,000,000 | Design/Bid Phase |
Utility | Muskallonge State Park | Replace/modernize Campground Sanitary Distribution System, Lift Station, and Sewage Lagoon | $1,100,000 | Design/Bid Phase |
Building | Muskallonge State Park | Renovate/Replace the West Campground Loop toilet/shower building. | $1,000,000 | Design/Bid Phase |
Parking Lot/Road | Muskallonge State Park | Resurfacing, chip seal, reconstruction & new paving as needed (8 lane miles) | $1,000,000 | Design/Bid Phase |
Recreational Structure | Muskallonge State Park | Renovate existing stairway used to access Lake Superior | $175,000 | Design/Bid Phase |
Operational Structure | Muskegon State Park | Modernize/replace sanitation station | $1,100,000 | Design/Bid Phase |
Parking Lot/Road | Muskegon State Park | Resurfacing, chip seal, reconstruction & new paving as needed | $900,000 | Design/Bid Phase |
Utility | Muskegon State Park | Replace electrical system at Snug Harbor | $300,000 | Design/Bid Phase |
Utility | Muskegon State Park | New municipal water is being installed. Install new water distribution lines to maximize efficiencies to existing park facilities. | $200,000 | Design/Bid Phase |
Building | Muskegon State Park | Beach Building modernization | $2,500,000 | Design/Bid Phase |
Recreational Structure | Muskegon State Park | Snug Harbor Fishing Pier repairs and accessibility improvements. | $250,000 | Design/Bid Phase |
Trails | Musketawa Trail State Park | Complete redo of several bridges, culverts and surfacing | $6,500,000 | Design/Bid Phase |
Building | Orchard Beach State Park | Renovate/replace two toilet shower buildings | $2,500,000 | Design/Bid Phase |
Recreational Structure | Orchard Beach State Park | Evaluate shoreline connection and create enhanced lakeshore viewing. |
$245,000 | Design/Bid Phase |
Utility | Otsego Lake State Park | Upgrade campground electrical system | $1,317,500 | Design/Bid Phase |
Building | Otsego Lake State Park | Renovate/replace one toilet shower building | $1,000,000 | Design/Bid Phase |
Utility | Otsego Lake State Park | Replace sanitary lines and upgrade lift stations | $750,000 | Design/Bid Phase |
Parking Lot/Road | Palms Book State Park | Rehabilitation of parking lot | $550,000 | Design/Bid Phase |
Recreational Structure | Palms Book State Park | Replacement of obseravation raft | $500,000 | Design/Bid Phase |
Parking Lot/Road | Pinckney Recreation Area | Resurfacing, chip seal, reconstruction & new paving as needed to Silver Lake day use area. | $1,250,000 | Design/Bid Phase |
Building | Pinckney Recreation Area | Renovate/replace Bruin Lake north campground toilet shower building. | $1,000,000 | Design/Bid Phase |
Parking Lot/Road | Pinckney Recreation Area | Resurfacing, chip seal, reconstruction & new paving as needed to Bruin Lake campground entrance road and campground loops. Improve campground drainage. | $1,000,000 | Design/Bid Phase |
Operational Structure | Pinckney Recreation Area | Bruin Lake Sanitation Station replacement | $500,000 | Design/Bid Phase |
Building | Pinckney Recreation Area | Replace Bruin Lake Campground- garage/workshop. | $450,000 | Design/Bid Phase |
Building | Pinckney Recreation Area | Modernize Silver Lake Concessions Building. | $200,000 | Design/Bid Phase |
Building | Pontiac Lake Recreation Area | Renovate/replace Concession and bathroom buildings in the Day-Use Area | $1,200,000 | Design/Bid Phase |
Utility | Pontiac Lake Recreation Area | Replace water supply and sanitary disposal. | $1,000,000 | Design/Bid Phase |
Historical Structure | Porcupine Mountains Wilderness State Park | Historic Service area building renovations and preservation (Lodge, Staff Quarters, Mechanic's Shop, Carpenter's Shop, and Fire Barn) | $1,400,000 | Construction Started |
Parking Lot/Road | Porcupine Mountains Wilderness State Park | Resurfacing and reconstruction of Porcupine Mountains visitor center and Headquarters area paved surfaces. | $1,400,000 | Design/Bid Phase |
Building | Porcupine Mountains Wilderness State Park | Visitor Center modernization renovations | $1,050,000 | Design/Bid Phase |
Utility | Porcupine Mountains Wilderness State Park | Sanitary sewer system modernization | $1,000,000 | Design/Bid Phase |
Utility | Porcupine Mountains Wilderness State Park | Modernization and replacement of electrical system. | $833,000 | Design/Bid Phase |
Parking Lot/Road | Porcupine Mountains Wilderness State Park | Renovations of the existing Summit Peak Parking lot and composting toilet. Parking lot -Provide moderate parking expansion. Perform clearing, paving, site drainage, pavement markings, and accessibility improvements. Composting toilet - perform foundation repairs and renovations. | $500,000 | Design/Bid Phase |
Recreational Structure | Porcupine Mountains Wilderness State Park | Replacement and/or rehabilitation of East & West Chair lifts on ski hill. Modernize to include Mtn. Bike hooks and mountain bike trails on the hill. | $500,000 | Design/Bid Phase |
Utility | Port Crescent State Park | Replace/modernize existing waterlines, sanitary sewer, electric system and roads in campgrounds. | $3,250,000 | Design/Bid Phase |
Building | Port Crescent State Park | Modernize/Renovate existing Day Use - Beach House / Pavillion including new waterlines, sanitary sewer, electrical system, and building structure | $1,000,000 | Design/Bid Phase |
Parking Lot/Road | Port Crescent State Park | Day Use road repair and parking lot expansion. | $700,000 | Design/Bid Phase |
Utility | Rifle River Recreation Area | Sanitary sewer improvements to Siphon System and Leach Field. | $425,000 | Proposed |
Recreational Structure | Rifle River Recreation Area | Rehabilitation/replacement of cable pedestrian suspension bridge and Observation Tower. | $210,000 | Design/Bid Phase |
Major Development | Rifle River Recreation Area | Replacement and modernization of Day Use road pavement, sanitary sewer system, water distribution system, and electric system for the Pavillion / Toilet building. | $1,400,000 | Design/Bid Phase |
Utility | Rifle River Recreation Area | Replace campground sanitary sewer line to liftstation and modernize the electric system. | $1,300,000 | Design/Bid Phase |
Parking Lot/Road | Saginaw Malleable Iron | Parking lot and road way improvements to park entrance. | $867,000 | Construction Started |
Parking Lot/Road | Seven Lakes State Park | Resurfacing, chip seal, reconstruction & new paving as needed | $2,000,000 | Design/Bid Phase |
Utility | Seven Lakes State Park | Sanitary system improvements/replacement | $1,000,000 | Proposed |
Utility | Seven Lakes State Park | Campground electrical system replacement/modernization. | $603,000 | Design/Bid Phase |
Building | Seven Lakes State Park | Renovate/Replace two Big Seven Shelters. | $500,000 | Design/Bid Phase |
Parking Lot/Road | Sleepy Hollow State Park | Resurfacing, chip seal, reconstruction & new paving as needed (5 lane miles) at picnic shelter area, campground loops, and day use area. | $2,250,000 | Design/Bid Phase |
Building | Sleepy Hollow State Park | Renovate/replace two Campground toilet/shower buildings. | $1,000,000 | Design/Bid Phase |
Building | Sleepy Hollow State Park | Renovate Day-Use beach toilet building. | $600,000 | Design/Bid Phase |
Utility | Sleepy Hollow State Park | Replacement of the headquarters lagoon system and replacement of the campground sanitation station. | $500,000 | Design/Bid Phase |
Trails | Sterling | Heritage Trail Embankment Repair - Phase 1 (phase2 on hold) | $4,000,000 | Construction Started |
Building | Straits State Park | Renovate/Replace two upper campground toilet shower buildings. | $2,000,000 | Construction Started |
Utility | Straits State Park | Replace Sanitary Lift Station | $125,000 | Design/Bid Phase |
Building | Tahquamenon Falls State Park | Replace/renovate lower falls campground Hemlock toilet shower building. | $1,000,000 | Design/Bid Phase |
Utility | Tahquamenon Falls State Park | Replace/improve well & water distribution system for the Lower Falls Unit. | $700,000 | Design/Bid Phase |
Utility | Tahquamenon Falls State Park | Replace/upgrade Campground Electrical system at the Lower Falls Portage Campground | $675,000 | Design/Bid Phase |
Utility | Tahquamenon Falls State Park | Replace Hemlock Campground Water Distribution System and Well | $650,000 | Design/Bid Phase |
Recreational Structure | Tahquamenon Falls State Park | Modernize the Brink Overlook Stairs, Upper Viewing Area and Viewing Platform. | $500,000 | Design/Bid Phase |
Building | Tahquamenon Falls State Park | Modernize Rivermouth maintenance Building and Employee Bathrooms. | $400,000 | Design/Bid Phase |
Parking Lot/Road | Tahquamenon Falls State Park | Modernization of the Upper Falls and Lower Falls entrance and parking areas. | $275,000 | Design/Bid Phase |
Utility | Tahquamenon Falls State Park | Replace/upgrade wells at upper falls including improvements to the waste water lagoon | $100,000 | Design/Bid Phase |
Parking Lot/Road | Tahquamenon Falls State Park | Remove/replace curbing at lower falls parking area | $75,000 | Proposed |
Utility | Tawas Point State Park | Modernize/replace campground electrical system. | $1,640,500 | Design/Bid Phase |
Parking Lot/Road | Tawas Point State Park | Paving of Day Use Roads after relocation to west due to road washout. | $850,000 | Design/Bid Phase |
Historical Structure | Tawas Point State Park | Repair the spalling brick on the historic light house tower. | $455,500 | Construction Started |
Operational Structure | Tawas Point State Park | Shoreline stabilization along Lake Huron. | $150,000 | Design/Bid Phase |
Building | Traverse City State Park | Design and construct new park headquarter building/complex. | $2,800,000 | Design/Bid Phase |
Major Development | Traverse City State Park | Campground improvements including park entrance, sanitation station, contact station, vehicular circulation, and accessibility improvements. | $2,425,000 | Design/Bid Phase |
Major Development | Traverse City State Park | Redevelop day-use area vehicle and pedestrian access. |
$1,225,000 | Design/Bid Phase |
Major Development | Twin Lakes State Park | Renovate/Replace Campground toilet/shower building and associated below ground utilities, including the replacement of a drain field. | $1,800,000 | Design/Bid Phase |
Utility | Twin Lakes State Park | Water line replacement | $700,000 | Design/Bid Phase |
Parking Lot/Road | Twin Lakes State Park | Resurfacing, chip seal, reconstruction & new paving as needed of entrance road, parking lots and roadways (1 lane mile). | $550,000 | Design/Bid Phase |
Building | Twin Lakes State Park | Modernization to day use beach buildings and address sinking foundations | $350,000 | Design/Bid Phase |
Utility | Van Buren State Park | Lagoon Rehabilitations | $700,000 | Design/Bid Phase |
Recreational Structure | Van Buren State Park | Beach access redevelopment due to erosion from high lake levels. | $400,000 | Design/Bid Phase |
Trails | Various | Non-Mortorized trails located in state parks. | $3,000,000 | Proposed |
Building | W.C. Wetzel RA | Construct a picnic pavillion | $140,000 | Design/Bid Phase |
Parking Lot/Road | W.C. Wetzel RA | Resurface accessible walking path | $138,125 | Design/Bid Phase |
Building | W.C. Wetzel RA | Replace two vault toilets | $50,000 | Design/Bid Phase |
Parking Lot/Road | Waterloo Recreation Area | Resurfacing, chip seal, reconstruction & new paving as needed (20 lane miles) | $1,400,000 | Design/Bid Phase |
Operational Structure | Waterloo Recreation Area | Repair/replace Lake Winnewana's stormwater outlet pipe. | $600,000 | Design/Bid Phase |
Building | Waterloo Recreation Area | Modernization of the Eddy Discovery Center Building including but not limited to roof replacement, atrium renovations, HVAC installation, and carpeting replacement. | $360,000 | Design/Bid Phase |
Utility | Waterloo Recreation Area | Install a water softening system at the Portage Lake and Sugarloaf Lake campground toilet/shower building due to hard water. | $120,000 | Design/Bid Phase |
Utility | Waterloo Recreation Area | Sugarloaf Campground waterline replacement. | $100,000 | Design/Bid Phase |
Recreational Structure | Waterloo Recreation Area | Portage Lake Fishing Pier | $65,000 | Construction Started |
Recreational Structure | Waterloo Recreation Area | Resurface both playgrounds at Sugarloaf and Portage Lake Campgrounds. | $60,000 | Design/Bid Phase |
Trails | White Pine Trail State Park | Paving of final 29 miles of the 62 mile White Pine Trail and replacement of covered bridge in Reed City. | $8,000,000 | Proposed |
Utility | Yankee Springs Recreation Area | Gun Lake campground electrical modernization. | $1,700,000 | Design/Bid Phase |
Parking Lot/Road | Yankee Springs Recreation Area | Resurfacing, chip seal, reconstruction & new paving as needed of campground roads | $1,250,000 | Design/Bid Phase |
Utility | Yankee Springs Recreation Area | Install storm drainage improvements to resolve flooding issues at Gun Lake campground. Replace aging sewer lines within park. | $1,000,000 | Design/Bid Phase |
Building | Yankee Springs Recreation Area | Renovate Murphy's Point toilet building and beach toilet/concession building. | $800,000 | Design/Bid Phase |
Operational Structure | Yankee Springs Recreation Area | Hall Lake dam repairs | $600,000 | Construction Started |
Recreational Structure | Yankee Springs Recreation Area | Replace fishing pier at Gun Lake day use area. | $150,000 | Design/Bid Phase |
Building | Young State Park | Renovate/replace two Toilet Shower Buildings in the Spruce Campground | $2,000,000 | Design/Bid Phase |
Major Development | Young State Park | Redevelopment and modernization of the Spruce campground with storm water system improvements, repaving of campground loop, and campsite refresh | $575,000 | Design/Bid Phase |
Utility | Young State Park | Replace two sanitary lift stations | $250,000 | Design/Bid Phase |