Construction Code Plan Review

  • Contact for Construction Code Plan Review:
    Phone: 517-241-9328 
    Fax: 517-241-0130
    E-Mail: bccplanreviewcodemail@michigan.gov

    Where the State of Michigan has code enforcement authority, the bureau is responsible for the review of boiler, building, electrical, elevator, mechanical, and plumbing plans. Additionally, the bureau reviews all barrier free design exception requests and mobile home park (MHP) plans as well as issues MHP permits to construct. Premanufactured unit plans and manufacturer compliance assurance manuals are also reviewed by the bureau.

    NOTE: Questions on the American with Disabilities Act (ADA) should be referred to the Great Lakes ADA Center at 800-949-4232 or http://adagreatlakes.org/ for accessibility.

    Plan reviews can be submitted expeditiously online at https://aca3.accela.com/lara/ for all review types except barrier free design exceptions and compliance assurance manuals. For reviews submitted online, the applicant can also check those review statuses at: https://aca3.accela.com/lara/.

Barrier Free Design

Plan Examination