This section should include a description of the oversight that will be performed and the construction quality assurance measures that will be incorporated and documented throughout the installation process. Justification of the level of oversight must be included.
Key supporting information
- It is not anticipated that a figure is warranted, though an example of a daily field log or other specific documentation may be appropriate as an attachment.