Attachment B.5-2 – Installation and commissioning of a passive vapor mitigation system (PVMS)

The Installation and Commissioning of a Passive Vapor Mitigation System (PVMS) includes the installation, commissioning, and the documentation necessary to show the PVMS was installed correctly and that it is functioning as designed. Therefore, completion of this phase is based on the mitigation system being fully installed and shown to be successful in mitigating vapor intrusion. Documentation includes the final performance metrics and monitoring locations, as-built drawings, and system commissioning documentation of the installed PVMS. This report also should identify the specifics of the OM&M Plan as the system is installed, and all information is available to provide a detailed step-by-step process of the information and assessments necessary to document that the system remains protective.

Coversheet

The cover sheet should contain the following information:

  • Site – site address with regulatory identifiers (Facility or Site name and ID#s).
  • Owner – entity, address, contact information.
  • System designer and/or environmental consultant – entity, address, contact information.
  • Building engineer and/or architect (if applicable) – entity, address, contact information.
  • Submittal date