The purpose of OM&M is to document and ensure the PVMS continues to function as designed until the vapor source(s) no longer poses an unacceptable risk to receptors. During the OM&M, the PVMS continues to be operated, maintained/repaired, and monitored in accordance with the performance metrics established during the Installation and Commissioning.
Repairs or modifications to PVMS should be handled in a manner consistent with contingency actions or a contingency plan established for non-performance of specific system components and the design performance requirements associated with each. Any new additions or significant modifications to the PVMS moves the PVMS back into Phase 2 – System Installation/Commissioning.
Coversheet
The cover sheet for the PVMS design should contain the following information:
- Site – site address with regulatory identifiers (Facility or Site name and ID#s).
- Owner – entity, address, contact information.
- System Designer and/or Environmental Consultant – entity, address, contact information.
- Building Engineer and/or Architect (if applicable) – entity, address, contact information.
- Submittal Date