Individuals have reported receiving text messages claiming to be from MDOT and demanding toll payments. This is a scam. MDOT does not operate any toll roads; messages should be ignored and deleted immediately. Learn more from MDOT Director Bradley C. Wieferich and Attorney General Dana Nessel.
Bridge repair projects start May 15
May 08, 2023
CRYSTAL FALLS, Mich. - The Michigan Department of Transportation (MDOT) plans to invest about $2.9 million to repair three bridges in Iron and Ontonagon counties. Work includes a deep overlay; epoxy overlay; joint replacement; deck, railing, and substructure patching; curb and gutter repairs; guardrail; and approach work on US-45 over the east branch of the Ontonagon River, M-64 over the Mineral River, and M-69 over the Paint River. This project includes a five-year performance warranty for the epoxy bridge deck overlay.
Counties:
Iron, Ontonagon
Highways:
M-69, M-64, US-45
Closest towns:
Crystal Falls, White Pine, Mass City
Start date:
Monday, May 15, 2023
Estimated end date:
October 2023 (For all three bridges)
Traffic restrictions:
During the project traffic will be maintained with one lane of alternating traffic utilizing temporary traffic signals. Detours will be necessary during some phases of the projects.
Jobs numbers:
Based on economic modeling, this investment is expected to directly and indirectly support 35 jobs.
Safety benefit:
This work will extend the lifespan of the bridges and result in a smoother driving surface and increased safety for motorists.
Media Contact: