Construction Scheduling
Construction Scheduling - Contract Time Determination, Progress Schedule & Critical Path Method
Contract Time Determination (CTD)
FHWA Guide for Construction Contract Time Determination Procedures
MDOT Guide for Contract Time Determination Procedures
MDOT Contract Time Determination Tool
CTD Tool Examples (For MDOT PW Users)
Progress Schedule
2020 Spec Book Progress Schedule - For Information Only
2020 Spec Book Progress Schedule Template
Construction Manual Guidance
Critical Path Method (CPM) Scheduling
Special Provision for Critical Path Method Schedule
Examples:
Interim Baseline Schedule
Road Reconstruction Baseline Schedule
Bridge Reconstruction Baseline Schedule
ITS Baseline Schedule
Traffic Signal Modernization Baseline Schedule
Baseline Narrative
Templates:
Baseline Narrative
Update Narrative
Guidance:
Scheduling Terminology
Guidance on Production Rates
Contacts for CPM Scheduling
Brad Daavettila
Scheduling Specialist
517-281-4295